Presentation is loading. Please wait.

Presentation is loading. Please wait.

Our Profile Corporate Milestone MSE start to established First Dry-docking repair for bulk.

Similar presentations


Presentation on theme: "Our Profile Corporate Milestone MSE start to established First Dry-docking repair for bulk."— Presentation transcript:

1

2 Our Profile Corporate Milestone 1973 1976 1978 1979 1999 2005 2006 2007 2010 2011 2012 MSE start to established First Dry-docking repair for bulk Carrier named, Japan Acacia First Fabrication project for Oil and Gas Structure, a set of living quarter First Newbuilt Project - MV Tanjung Pinang; First FSO project - Rajendra First FPSO Project-Perintis MSE rebrand to MMHE ; Completion of First Deepwater project –Kikeh Spar Start operations at the Kiyanly fabrication yard in Turkmenistan MHB officially listed in Bursa Malaysia on 29 October 2010 Acquisition of East Yard (formerly known as SDE yard) Legal Day 1, for East and West Yard Awarded First Semi-Sub FPU Project

3 Our Profile 63% 67% 100% 50% 60% 40% 70% Techno Indah Sdn Bhd
Malaysia Marine and Heavy Engineering (Turkmenistan) Sdn Bhd (MTSB) - Dormant Malaysia Marine and Heavy Engineering Sdn Bhd (MMHE) - Oil & gas engineering and construction works, marine conversion and repair Techno Indah Sdn Bhd - Sludge disposal management MMHE-SHI LNG Sdn Bhd (MSLNG) - Provision of repair services and dry docking of LNG carrier MMHE-ATB Sdn Bhd (MMHE-ATB) - Manufacturing of pressure vessels and tube heat exchangers MMHE-TPGM Sdn Bhd (MMHE-TPGM) - Provision of engineering, procurement, construction, installation and commissioning 60% 40% 70% - Hull engineering and project management

4 Open Fabrication Yard Area
The Yard Facilities (West) Dry dock 1 Size: 385m x 80m x 14m (one of the largest in region) Dry dock 2 Size: 270m x 46m x 12.5m Capacity : 140,000 dwt Dry dock 5 fabrication areas totalling 321,400 m2 3 skid tracks and 2 bulkheads, one up to 40,000 mt and the other up to 12,000 mt Skidding facilities up to 55,000 mt Open Fabrication Yard Area 35 workshops covering an area of 99,000m2 fully equipped service and production workshop Integrated cutting, sub-assembly and block shop under one roof. Workshops 1 LNG Carrier Repair Facility 3 Global Test Control Rooms 1 Cryogenic Workshop (557.8 m2) 1 Invar Welding Training Centre (84.24 m2) Other Facilities

5 The Yard Facilities (West)
Size : 188.4m x 33.8m x 8m Lift Capacity : 50,000 dwt Shiplift Land berth 2 land berths (each 345 metres in length) Quay 7 quays (lengths of up to 368 metres) Pier Size : 300m x 25m Capacity: 39,000 dwt West Finger Pier Material Handling Quay Size : 100m x 20m Capacity: 5,000 dwt Comprehensive and integrated facilities in our strategically located hectare complex with a 1.8km seafront in Pasir Gudang, Johor.

6 The Yard Layout (West) Highlights
cutting & assembly workshop FA2 FA3 FA4 FA1 Highlights Single largest fabrication yard with 69,700 mt capacity and the only Malaysian yard with a 40,000 mt skid track-bulkhead Largest drydock that can accommodate 450,000 dwt vessels and 50,000 dwt shiplift 7 quays with length up to 368 metres in length and 35 workshops of 99,000m2 Concurrently repair 1 LNG carrier and 2 VLCCs Yard utilisation is more than 70%. Cannot fully utilise now but expected to improve when projects are awarded. MMHE needs also to ensure proper allocation of resources, well execution of projects – hence not just utilisation levels. Currently, 1 month about 3 million manhour achieved drydock 450k dwt drydock 140k dwt landberth shiplift FA5 bulkhead 40k mt skid-track 40k mt skid-track 55k mt

7 The Yard Facilities (East)
Km from Johor Bahru 40 km from the nearest international airport Sharing border with Johor Port 111 Acres (449, M2) Location Total Area

8 TOTAL OPEN AREA (Exclude New Dev Area) As At March 2012
The Yard Facilities (East) TOTAL OPEN AREA (Exclude New Dev Area) As At March 2012 No. Description Current Area (m2) 1 Fabrication, Assembly & Erection Area (Land A m2) 20,70000 2 Fabrication, Assembly & Erection Area (Land B & D m2) 3 Blasting and Painting 62,300.00 4 Material Laydown 56,660.00 5 Storage (Land E) 6 Others (Pipemill Land F) 12,950.00

9 The Yard Layout (East) 111 Acres, Capacity 60,000 MT/p.a.

10 The Core Businesses Engineering & Construction
Full range of oil and gas construction and engineering services from detailed engineering design and procurement to construction, installation, hook-up and commissioning. Only yard in Malaysia that has constructed complex deepwater structures for the oil & gas industry. Marine Conversion Offers one-stop centre for converting vessels such as VLCCs, Aframax tankers and offshore oil rigs into floating structures for the offshore oil and gas industry such as FPSOs, FSOs, MOPUs and MODUs. Only yard in Malaysia that has completed FPSO/FSO conversions. Marine Repair Offers repairs, refit and refurbishment services to a wide range of vessels with focus on energy-related vessels such as ULCCs, VLCCs, petroleum tankers, chemical tankers, offshore oil rigs, gas carriers and other offshore support vessels. Provides maintenance, technical solutions and refurbishment services for LNG carriers, in joint venture with Samsung Heavy Industries. One of three in Malaysia / Singapore region to repair or refurbish LNG carriers in 2009.

11 Current project in the yard

12 The Customers

13 The Core Businesses Marine Conversion
MMHE is a one-stop centre for FPSO and FSO conversions, providing a comprehensive range of services from initial design to fabrication, installation and commissioning.

14 Conversion of FPSO Kikeh (Track record)
Client: MDFT (Labuan) Ltd. Charterer: Murphy Sabah Oil Co., Ltd. Completion date: February 2007

15 Conversion of FSO Okid (Track record)
Client: MISC Completion date: Nov. 2008

16 Conversion of FPSO Ruby (Track record)
Client: MISC Weight: 100,047dwt Completion date: Mar 2009

17 Conversion of T12 Tender Drill Barge (Track record)
Client : Seadrill Delivery : 1 Dec 2009 4th Order from Seadrill

18 Conversion Works of FSU Lekas (Track record)

19 Conversion Work of FPSO Cendor (Current)

20 The Customers

21 The Core Businesses Marine Repair

22 VLCC & OTHER PETROLEUM TANKERS
The Track Record GAS CARRIERS (LPG & LNG) CHEMICAL TANKERS RIGS OTHER VESSEL TYPES Over 3,500 Ships Repaired Since 1976 VLCC & OTHER PETROLEUM TANKERS


Download ppt "Our Profile Corporate Milestone MSE start to established First Dry-docking repair for bulk."

Similar presentations


Ads by Google