1 Company Profiles and Introduction
HAEDONG YEONGGWANG DOCKYARD CO., LTD.

2 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
The Company's Mission ■ Creating the Future ■ Innovation ■ Customer Confidence ◆ Haedong Yeonggwang Dockyard CO., LTD. take over TK Shipyard on June 1, 2013. ◆ Dockyard Address : 137, Gamami-ro, Hongnong-eup, Yeonggwang-gun, Jeollanam-do, Korea Tel : Fax : ◆ Head Office Address : 6th Fl., Haedong Bldg., 132, Hakgamdae-ro, Sasang-gu, Busan, Korea Tel : Fax : ◆ Homepage : 2 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

3 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
1. Company Profile Aug. 27, 2007 Established TK Shipbuilding Co., Ltd. Oct. 25, 2007 Started to Construct Dry Dock. Jun. 03, 2009 Received the permit for usage of Dry Dock from Yeonggwang Provincial Office. Jun. 09, 2010 Delivered Hull No. H0001. Oct. 01, 2010 Delivered Hull No. H0002. Nov. 08, 2011 Completed the reclamation to the No. 2 & No.3 section. Jun. 01, 2013 Haedong Yeonggwang Dockyard CO., LTD. take over TK Shipyard. 3 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

4 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
2. Vision and Strategy Management Goals Productivity Quality Delivery Cost Differentiated Shipbuilding Policy Maximize Productivity Settle the Management System Management with core ability Achieve Management Goals and Maximize Profits Simplify and Upstream production, Maximize Pre-outfitting Grand Block Assembly, Minimize the Erroneous and Corrective Rework Advanced Shipbuilding Technology., Maximize turn over rate On-Time supply of Materials Optimize Material Cost (Pre-Nesting, High Material Usage and Recycling of Leftover Materials, etc.) Optimize Labor Cost (Enhance Shipbuilding Tech.) Elimination of the Waste Achieve competitive Quality Simplify and Upstream Policy Stabilization of Design and Production Work Shorten the Building Period On-Time Delivery World Competitive Medium-sized Dockyard on Cutting Edge Technology In Shipbuilding Vision Strategy HAEDONG YEONGGWANG DOCKYARD CO., LTD. 4

5 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
3. Vision and Strategy – Cont. Establishing the Core Production Infrastructure Pre-Nesting, Maximize Usage of Steel Materials Design Optimization Establish Integrated Management System in design/material/production with ERP System Optimize Material Cost Innovate Production Technology Minimize the Erroneous and Corrective Rework thru Optimal Design Saving Labor Cost (Enhance the productivity by process improvement) Cost Saving Grand Block Assembly Maximize Pre-Outfitting Module Unit for Outfitting Maximize Dock turn over rate Cost Saving 5 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

6 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
4. Dockyard Location and Layout Location of TK Dockyard : 137,Gamami-ro, Hongnong-eup,Yeonggwang-gun, Jeollanam-do, Korea TK Dockyard TK Dockyard 6 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

7 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
4. Dockyard Location and Layout-Cont. Dockyard Layout Completion of 1st construction stage Area : 148,676 m2 - Land Area : 60,122 m2 - surface of the water : 88,554 m2 Surface of the water LAND Area HAEDONG YEONGGWANG DOCKYARD CO., LTD. 7

8 Dimension and Specification
5. Major Production Facilities and Capability Equipment Dimension and Specification Total Area (Phase 1) 148,676 m2 - In Land Area : 60,122 m2 - Reclamation : 88,554 m2 Dry Dock Length 220 m x Wide 70 m x Height m Goliath Crane 600 Ton x 1 LLC (Jib Crane) 40 Ton x 1 Outfitting Quay 550 m Mobile Crane Painting equipment Welding Equipment Electric Power Production Capacity for a year 8 vessels Steel Work Capacity for 64,000 Ton Estimated Sales for a year 320 Million USD 8 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

9 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
6. Breakdown of Facility Investment Item Amount(USD) Remark Dry Dock 32,700,000 Building Construction 2,600,000 Electrical Engineering 7,500,000 Aux. Facilities 3,300,000 Land Purchase 6,600,000 Permit and Detailed Design 1,600,000 600 Tons Goliath Crane 13,800,000 40 Tons LLC Crane 3,600,000 Dock Pumps 2,700,000 Dock Gate 4,500,000 N0.2 Section Reclamation 16,900,000 No.3 Section Reclamation 8,800,000 Total 104,600,000 HAEDONG YEONGGWANG DOCKYARD CO., LTD. 9

10 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
View of Dockyard (Feb. 22, 2010) 10 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

11 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
View of Dockyard (Apr. 16, 2010) 11 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

12 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
View of Dockyard (Jul. 10, 2010) 12 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

13 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
View of Dockyard (Aug. 20, 2010) 13 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

14 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
Launching Block 14 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

15 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
Launching Block 15 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

16 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
Launching Main Engine 16 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

17 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
Launching Deck House 17 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

18 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
Complete Construction of the Ship 18 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

19 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
Before Dock Out 19 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

20 Approaching Floating Crane
Launching Deck House Approaching Floating Crane Lifting Deck House Launching Deck House Locating Deck House 20 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

21 HAEDONG YEONGGWANG DOCKYARD CO., LTD.
Outfitting & Sea Trial 21 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

22 Thank you! 22 HAEDONG YEONGGWANG DOCKYARD CO., LTD.