Presentation is loading. Please wait.

Presentation is loading. Please wait.

KALINDEE RAIL NIRMAN (ENGINEERS) LTD. Founded as a partnership firm for execution of Signaling contracts. Became a Public Limited Company. Diversified.

Similar presentations


Presentation on theme: "KALINDEE RAIL NIRMAN (ENGINEERS) LTD. Founded as a partnership firm for execution of Signaling contracts. Became a Public Limited Company. Diversified."— Presentation transcript:

1 KALINDEE RAIL NIRMAN (ENGINEERS) LTD

2 Founded as a partnership firm for execution of Signaling contracts. Became a Public Limited Company. Diversified in execution of Ballasted Trackwork. Diversified in execution of Optic Fiber Communication. Diversified in execution of Automatic Fare Collection System for Metro. Diversified in execution of Ballastless Trackwork for Metro. Diversified in the field of Electronic Interlocking.

3 First Signalling work on contract in India. First Indian Company to Install Longest OFC Network of 1000 Kms. First Indian company to achieve Highest Speed of Track Construction (2Km per day). First Indian Company to achieve Highest Test Speed of track (130 Kmph. on the very first trial day). First Indian Company to execute successfully largest Signalling contract of 54 Stations. First Private Company to do Turnkey Rail Facility Work. First Indian Company to install Contact Less Automatic Fare Collection System for Delhi Metro. First Indian Company to install Ballast Less Track for Underground Section of Delhi Metro.

4 Design Preparation of Engineering Drawings Commissioning Documentation Training Maintenance & Warranty Services Supply of all Materials & Equipments Installation Testing

5 RailwayMetroPrivate Siding BALLASTED TRACK BALLASTLESS TRACK  SIGNALLING  TELECOM  AUTOMATIC FARE COLLECTION SYSTEM  Note: -Civil work related to track work like Earthwork, Bridge work, Buildings etc is also executed by us.

6 Gauge Conversion New Line & Siding Line Installations of Points & Crossings Yard Remodeling Ballast Less Track 1400 Kms 742 Kms 1300 Nos 125 Kms 150 Kms

7 Major Bridges Minor Bridges/Culverts Building Earthwork 35 Nos 400 Nos 30 Nos 5 Million Cum

8 Conventional Signalling Panel Interlocking Color Light Signalling Level Crossing Interlocking 260 Stations 362 Stations 340 Stations 256 Nos Axle Counters Audio Frequency Track Circuits 225 Nos 115 Nos

9 Token Less Block Systems Multi Aspect Signalling 215 Stations 58 Stations Solid State Interlocking Signaling for 25 KV AC Traction 106 Stations 59 Stations Major Yard Signalling Route Relay Interlocking 38 Nos 40 Stations Electronic Interlocking 44 Stations

10 Under Ground Copper Cables Under Ground OFC Systems 8490 Kms 3084 Kms Over Head Lines Mobile Train Radio 400 Kms 220 Cabs OFC Equipment Installation Wireless Network (GSM) 112 Stations 60 Kms Microwave / UHF Radio Towers 32 Nos MSO & EBTS 4 Nos

11 Automatic Fare Collection Gates Ticket Office Machines 1382 Gates 644 Nos Electrical Distribution Cabinets Ticket Readers / AVM 720 Nos 368 Nos OCC / SDC Networking Equipments 7 Nos 478 Nos Ticket Vending Machine 178 Nos

12

13

14

15

16

17

18

19

20

21 Track Work : 127.14Kms. Work Value: US $15.09 Million COMPOSITE WORK (TRACK AND S&T) IN NORTH CENTRAL RAILWAY. Track Work : 89 Kms. Work Value: US $ 30.94 Million DOUBLING PROJECT IN WEST CENTRAL RAILWAY. Track Work : 59.5 Kms. Work Value: US $18.57 Million COMPOSITE WORK (CIVIL, S&T AND TRACK) IN NORTH WESTERN RAILWAY.

22 Track Work:106.92 Kms. Work Value: US $ 24.26 Million TRACK AND S&T WORK IN DIVISION OF NORTH EASTERN RAILWAY, UTTAR PRADESH. Track Work: 25 Km Work Value: US $18.74 Million TRACK WORK AND INSTALLATION OF THIRD RAIL IN KOLKATA METRO RAIL. No.of Stations: 8 Stations Work Value: US $ 5.35 Million TRACK AND RAILWAY AUTOMATION WORK IN JAIPUR METRO.

23 Track Work: 64 Kms. Work Value: US $ 20.21 Million TRACK AND S&T WORK IN DIVISION OF SOUTH CENTRAL RAILWAY, ANDHRA PRADESH Track Work: 92 Km Work Value: US $44.16 Million BALLASTED AND BALLASTLESS TRACK WORK FOR DELHI MRTS PROJECT PHASE -III.

24 Track Work : 92 Kms. Work Value: US $ 30.17 Million TRACK AND SIGNALLING WORK OF NORTH CENTRAL RAILWAY. Track Work : 40Kms. Work Value: US $ 5.5 Million TRACK WORK FOR DELHI METRO CORRIDOR PHASE-I. Track Work : 70 Kms. Work Value: US $ 2.24 Million TRACK WORK FOR DELHI METRO CORRIDOR PHASE II.

25 Track Work : 8 Km Work Value: US $ 1.89 Million TRACK WORK FOR RAPID METRO RAIL, GURGAON. Track Work : 150 Kms. Work Value: US $ 40.45 Million GAUGE CONVERSION IN SOUTHERN RAILWAY. Track Work : 50Kms. Work Value : US $16.12 Million TRACK WORK FOR DELHI METRO AIRPORT LINE.

26 Biggest Signalling Project Undertaken (54 Stations Panel Interlocking) Biggest Telecom Project (OFC System 1000 Km) B.G.Track in Deep Cuttings 60 Kms. Highest Quality standards maintained. On Time Completion. Work won all round appreciation. Konkan Railway

27 COMPANYCOUNTRYPROJECTS SiemensGermany For various Signalling Projects in Indian Railways. AnsaldoItaly For various Signalling Projects in Indian Railways. Signalling Equipments Track & Civil COMPANYCOUNTRYPROJECTS TSOFrance Track Work For Delhi Metro Corridor Phase-I. PandrolUK Track work For Kolkata Metro Rail Corporation. Railway Automation COMPANYCOUNTRYPROJECTS Samsung SDSKorea Delhi Metro AFC Work For Phase I & Phase II Jaipur Metro AFC Work For Phase I. Bangalore Metro AFC Work For Phase I.

28 1.Eastern Railway Signalling and Telecommunication work in Sealdah Division of Eastern Railway. 2.North Eastern Railway Composite work in Lucknow division of North Eastern Railway. 3.South Eastern Railway Construction of 3 rd Line between Rajkharswan-Sini section of South Eastern Railway. 4.Northeast Western Railway Electronic Interlocking in Rewari-Sadalpur-Hisar section of Bikaner division of North Western Railway. 5.Rail Vikas Nigam Limited Composite work in Kota & Bhopal Division of West Central Railway. 1 3245

29 1 32 45 1.Delhi Metro Rail Corporation Total Ballastless Track of 73.69 TKM. Total Ballasted Track of 33.47 TKM. 2.Bangalore Metro Rail CorporationTotal Ballastless Track work of 18 TKM. 3.Jaipur Metro Rail Corporation Total Ballastless Track of 26.51 TKM. Total Ballasted Track of 3.38 TKM. 4.Kolkata Metro Rail Corporation Total Ballastless Track of 29.10 TKM. Total Ballasted Track of 4.25 TKM. 5.Rapid Metro, Gurgaon HaryanaTotal Ballastless Track work of 8 TKM.

30 13245 1. National Thermal Power Corporation Limited Signalling and Telecommunication work along with associated electrical work for NTPC Kahalgaon. 2. Aravali Power Company Private Limited (India) Railway siding including Earthwork, Civil and Ballast supply for MGR Yard in APCL Plant, Jhajjar Haryana. 3.Bharat Oman Refineries Signalling work including supplies of material, designing, testing, commissioning at BORL in-plant Yard at Bina in Bhopal Division. 4. Hindustan Petroleum Corporation Ltd. Railway Siding for Hindustan Petroleum at Somnathpur, Balasore, Odisha 5.Mumbai Port Trust Remodelling & Upgradation of Railway Yard, includes Track Linking, Ballast Supply at Wadala, Mumbai.

31 1.Vedanta Railway Siding and Linkage for Power Plant of 1215 MW capacity at Jharsuda, Odisha.. 2.Adani Ports Track Laying and Linking for Gujrat Adni Port Limited, Mundra. 3.Indian Oil Tanking Composite work at Jasai-Chirle Yard of Central Railway as per requirement of Indian Oiltanking Ltd., Navghar Mumbai. 4.Reliance Energy Railway Siding in 2x300 MW DCR Thermal Power Project, Yamuna Nagar, Haryana. 13 2 4

32 Kalindee Rail Nirman (Engineers) Ltd. 2nd Floor, Building No: 9A, Cyber City, DLF Phase-III, Gurgaon, Haryana www.kalindee.net | bd@kalindee.net | 0124-4674800


Download ppt "KALINDEE RAIL NIRMAN (ENGINEERS) LTD. Founded as a partnership firm for execution of Signaling contracts. Became a Public Limited Company. Diversified."

Similar presentations


Ads by Google