Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 PBN Flight Procedure Design Seminar.

Similar presentations


Presentation on theme: "The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 PBN Flight Procedure Design Seminar."— Presentation transcript:

1 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 PBN Flight Procedure Design Seminar and Capability Survey For Cambodia Phnom Penh, 17 – 19 October 2011 “Inception Report” Briefing SSCA, 09:00-09:30, Monday, 17 October

2 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1.Human resources development to having capability of design and publish the Instrument Flight Procedure (IFP) for Performance-based Navigation (PBN), which utilize Global Navigation Satellite System (GNSS), is one of the most important key factors for the Project. 2.However, Cambodia faces human resources challenges to implement adequate Flight Procedure Design (FPD) process, suffering with a shortage in human resources, not only for PBN IFP, but also for conventional IFP using ground-based navigational aids. 3.ICAO’s Universal Safety Oversight Audit Programme (USOAP) pointed out inadequacy of FPD structure. 2

3 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Mr. Sadakazu KIRIHARA Special Assistant to the Director Flight Procedure and Airspace Program Office, Air Traffic Control Division, Air Traffic Services (ATS) Department, Civil Aviation Bureau (JCAB), Ministry of Land, Infrastructure, Transport and Tourism (MLIT) 3 Air Traffic Controller at Naha Area Control Center (ACC), Kansai (Osaka) Airport, Naha Airport, Osaka Regional CAB

4 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Mr. Hidehisa YOSHIDA Deputy Manager Flight Procedure Design, Airspace Group, First Division, NTT DATA i Corporation Assist JCAB in developing instrument flight procedure design and construction. 4 Architect and Civil Engineering Airport Planning Consultant Designed more than 100 Instrument Flight Procedures in Japan

5 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1.Transfer of Basic Knowledge relating to PBN Flight Procedure Design to Cambodian Counterparts; 2.Study by JICA PBN Experts on PBN Flight Procedure Design Capability of Cambodian Counterparts; and 3.Recommendations by JICA PBN Experts to the Project with a view to improving the Project Programs. Through “the PBN Flight Procedure Design Seminar” and discussions with Cambodian Stakeholders, such as SSCA, Air Navigation Service Provider, Airlines, MLUC, the Société Concessionaire des Aéroports (SCA). 5

6 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1.Explanation and Confirmation of Inception Report (Monday) 2.Seminar on PBN Flight Procedure Design (Monday) 3.Information Survey and Assessment on FPD Structure and Standards (Tuesday & Wednesday) 4.Assessment on PBN Roadmap (Tuesday & Wednesday) 5.Recommendation for Service Provider on PBN FPD Implementation (Wednesday) 6.Recommendation on Hanoi Flight Procedure Office (FPO) * only in Vietnam 7.Preparation and Submission of On-site Work Completion Report (Wednesday) 6

7 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Conducted based on Questionnaire forwarded to SSCA on 7 October with deadline of 16 October; Necessary information collected by interview with C/P and discussions at meetings on Tuesday; Visit at office or working area where FPD process is carried out as far as possible; Visit to ATC Facilities as well; Appreciate documented data and/or materials, such as regulations, standards, manuals, and record etc. 7 Very Important, equally to the PBN Seminar, for the PBN Capability Survey.

8 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Information to be covered by Survey 1.Flight Procedure Design Structure Organization Human Resources Equipment Materials Training 2.Flight Procedure Design Standards Flight Procedure Design Standards Manuals Forms 3.Other Terrain and Obstacle Data 8

9 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Monday, 17 08:45-09:00Courtesy visit to H.E. Say Sokhan, Under-Secretary of State for SSCA at SSCA 09:00-09:30Briefing to SSCA Counterparts at SSCA Preparation for the Seminar PBN Capability Survey (Questionnaire was forwarded to SSCA on 7 October with deadline of 16 October) any relevant subjects 10:15-16:30PBN Flight Procedure Design Seminar at Project Office (CATS) Tuesday,18 09:00-16:00Discussions with Cambodian Stakeholders (SSCA, Air Navigation Service Provider, Airlines, MLUC, SCA) at Project Office (CATS) on PBN Tech/Ops issues PBN Capability Survey based on Questionnaire WGS-84 data survey plan any relevant subjects (12:00-13:30)Lunch hosted by SSCA 16:00-17:00ATC Facility Visit (Phnom Penh Airport & ACC) by JICA Experts 9

10 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Wednesday, 19 09:00-10:00Discussions with SSCA Counterparts at SSCA (if required) 10:00-12:00Summary Report to SSCA Counterparts at SSCA * Signing M/M of CJPM/7 14:00-14:30Report to JICA Office 16:30Depart from Phnom Penh to Vientiane 10

11 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Monday, 17 10:00Registration (Conference Room in CATS will be arranged) 10:30Opening Remarks by H.E. Kim Sophorn, Under-Secretary of State for SSCA Remarks by Representative of JICA Cambodia Office 10:45Session 1: Overview of Activities and Programs relating to PBN under “the Project for the Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam” (JICA Project Leader) 11:15Session 2: PBN Planning and Implementation in Japan - Roles of Civil Aviation Authority as the “Regulator” in Leading PBN Implementation (JICA Expert) 12:00Lunch at Restaurant “The Best” (hosted by JICA) 13:30Session 3: Roles of Flight Procedure Designers as the Service Provider in Flight Procedure Design in Japan- Services, Organization, Qualification/Certificate and Training (JICA Expert) 11

12 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam Monday, 17 14:00Session 4: Overview of PBN Flight Procedure Development and Implementation in Cambodia-Roles of SSCA and air navigation service providers (ANSPs), PBN Roadmap and Implementation Plan, etc (Cambodian counterparts) 14:30Session 5: PBN To Improve Flight Efficiency in Japan (JICA Expert) 15:00Coffee Break 15:15Session 6: Flight Procedure Design Implementation in Japan- Situational Awareness, Flight Procedure Design, and Quality Assurance System (JICA Expert) 15:45Session 7: Questions and Answers 16:00Summary 16:30Closing Remarks by H.E. Kim Sophorn, Under-Secretary of State for SSCA MC: Ms. Yuvattey Ngeth “KOKO” (CATS) & Hiroshi Inoguchi 12

13 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1.Cambodian Counterparts will understand the ideal Flight Procedure Design process through a PBN FPD Seminar; 2.Cambodian Counterparts will clearly recognize actual status and the issue to be challenged to achieve PBN Roadmap; 3.JICA Project will conduct succeeding training programme on PBN FPD implementation more efficiently; 4.Project Goal, transition to new CNS/ATM Systems, would be facilitated efficiently and effectively. 13

14 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 14


Download ppt "The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 PBN Flight Procedure Design Seminar."

Similar presentations


Ads by Google