Presentation is loading. Please wait.

Presentation is loading. Please wait.

Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8.

Similar presentations


Presentation on theme: "Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8."— Presentation transcript:

1 Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

2 Slide 5-89 R Street Sprinkler/StandpipeConnection Side A Walk-around 100 R Street Command Sequence # 8

3 Slide 5-90 Side B Side A Sides A and B Walk-around 100 R Street Command Sequence # 8

4 Slide 5-91 Side C Walk-around 100 R Street Command Sequence # 8

5 Slide 5-92 Side DSide A Sides A and D Exposure D1 Exposure D2 Sprinkler/StandpipeConnection Walk-around 100 R Street Command Sequence # 8

6 Slide 5-93 Interior of Outlet Store Heavy Fire Load Walk-around 100 R Street Command Sequence # 8 Sprinkler Piping Heavy Timber Mill Construction

7 Slide 5-94 Walk-around 100 R Street Command Sequence # 8 Interior of Outlet Store Heavy Fire Load Sprinkler Piping Heavy Timber Mill Construction

8 Slide 5-95 COMMAND SEQUENCE # 8 1ST ALARM RESOURCES Engine 1Engine 1 Engine 2Engine 2 Engine 3Engine 3 Truck 1Truck 1 Squad 1Squad 1 Battalion Chief 1Battalion Chief 1 – All companies staffed with four firefighters – Battalion Chief 1: 30-minute response

9 Slide 5-96 Heavy fire, four windows second floor, Side A. Medium smoke upper floors. Occupants have been removed. Building contains sprinklers and standpipes. Side B Side A 100 R Street Command Sequence # 8 Saturday March 2 Wind out of the South 15 MPH Temperature 25°F

10 Slide 5-97 N Rail Road Right of Way Perth Street 4-Story Building Outlet Warehouse 6-Story 4 Bay Loading Dock – 1 story Row houses 2-1/2 Story Row houses 3-Story Parking Lot R Street 16th S T R E T A B C D Sprinkler/Stand- pipe Connection

11 Slide 5-98 WHAT IS THE SITUATION? (SIZEUP) On location at 100 R Street, six-story building, 75' x 300', mill construction, occupied as outlet stores.On location at 100 R Street, six-story building, 75' x 300', mill construction, occupied as outlet stores. Heavy fire and smoke windows showing from four windows, second floor Side A.Heavy fire and smoke windows showing from four windows, second floor Side A. All occupants have been removed.All occupants have been removed. Exposures Side A are three-story occupied dwellings separated by a 20 foot street.Exposures Side A are three-story occupied dwellings separated by a 20 foot street. Exposure D1 is a one-story loading dock, directly attached.Exposure D1 is a one-story loading dock, directly attached. Exposure D2 is 2-1/2-story occupied dwelling 25 feet from building.Exposure D2 is 2-1/2-story occupied dwelling 25 feet from building. No other immediate exposures.No other immediate exposures. Engine 1 is establishing R Street Command.Engine 1 is establishing R Street Command. Sizeup report example:

12 Slide 5-99 WATER SUPPLY FIXED SYSTEMS ACTION PLAN

13 Slide 5-100 WHAT CAN BE ACCOMPLISHED? INCIDENT OBJECTIVES Contain and control fire in room/ building of origin.

14 Slide 5-101 WHAT NEEDS TO BE DONE? INCIDENT STRATEGY(IES) Exposure protectionExposure protection Confinement/ExtinguishmentConfinement/Extinguishment Special equipmentSpecial equipment VentilationVentilation

15 Slide 5-102 HOW ARE YOU GOING TO DO IT? INCIDENT TACTICS Exposure protection Exposure protection – Deploy large-diameter hoseline for water supply – Deploy one 2-1/2-inch hoseline to Side A second floor for interior exposure protection – Deploy one 1-3/4-inch hoseline to Side A third floor for exposure protection Confinement/Extinguishment Confinement/Extinguishment Deploy two 2-1/2-inch hoselines to second floor Side A for confinement/extinguishment Special equipment Special equipment Deploy two 2-1/2-inch hoselines to sprinkler/standpipe connection Side A Ventilation Ventilation – Vent roof apertures of fire building – Horizontal ventilation all floors of fire building

16 Slide 5-103 IMPLEMENT THE WATER SUPPLY FIXED SYSTEMS ACTION PLAN Communicate assignments clearly to all resources operating on the incident.

17 Slide 5-104 EVALUATE THE WATER SUPPLY FIXED SYSTEMS ACTION PLAN Evaluate progress every 10 minutes.Evaluate progress every 10 minutes. Obtain feedback reports from resources operating on the incident.Obtain feedback reports from resources operating on the incident.

18 Slide 5-105 100 R Street Command Sequence # 8 Side B Side A Heavy fire, four windows second floor, Side A. Medium smoke upper floors. Occupants have been removed.

19 Slide 5-106 SALVAGE OPERATIONS

20 Slide 5-107 SALVAGE The tactical operation of protecting property from damage.

21 Slide 5-108 PRINCIPLES OF SALVAGE To minimize damage to building and contentsTo minimize damage to building and contents To protect building from structural damage due to weight of waterTo protect building from structural damage due to weight of water

22 Slide 5-109 SALVAGE TACTICS Protect building contents In placeIn place By removalBy removal Control water flow within buildingControl water flow within building Remove water from buildingRemove water from building

23 Slide 5-110 SALVAGE TACTICS (cont'd) Ventilate to remove smoke and heatVentilate to remove smoke and heat Remove debris from buildingRemove debris from building Cover building openings to protect from weatherCover building openings to protect from weather

24 Slide 5-111 COORDINATION AND PLANNING Rapid extinguishment reduces loss.Rapid extinguishment reduces loss. Conserve water during firefighting operations.Conserve water during firefighting operations. Ventilate early.Ventilate early.

25 Slide 5-112 WATER SUPPLY, FIXED SYSTEMS, SALVAGE 700 29th STREET: Command Sequence # 9 WATER SUPPLY, FIXED SYSTEMS, SALVAGE 700 29th STREET: Command Sequence # 9

26 Slide 5-113 REVIEW SIZEUP REPORT OF FIREGROUND CONDITIONS

27 Slide 5-114 COMMAND SEQUENCE # 9 WALK-AROUND PLOT PLAN

28 Slide 5-115 SIZEUP REPORT OF FIREGROUND CONDITIONS Initial reportInitial report To be given immediately upon arrival on location Exact location and conditions as observedExact location and conditions as observed – Nothing showing – Size of structure--stories and dimensions--type of construction--occupied or vacant – Smoke/Fire--location and density – Status of occupants--if known – Exposures---Sides A, B, C, D, or other – Engine __ is establishing ___ Street Command.

29 Slide 5-116 SIZEUP REPORT OF FIREGROUND CONDITIONS (cont'd) Subsequent reportSubsequent report Information not immediately reported and/or information developed upon investigation. To be given ASAP or within 5 minutes. Progress reportProgress report To be given by the IC every 10 minutes until fire is under control.

30 Slide 5-117 COMMAND SEQUENCE WATER SUPPLY, FIXED SYSTEMS, SALVAGE ACTION PLAN Command Sequence # 9

31 Slide 5-118 Side A Walk-around 700 29th Street Command Sequence # 9 13-story high- rise building, 75' x 75', fire-resistive construction, fire-resistive construction, occupied as medical laboratory/ offices. Standpipe connections located in fire towers. N

32 Slide 5-119 Walk-around 700 29th Street Command Sequence # 9 Side A Side B

33 Slide 5-120 Side B Walk-around 700 29th Street Command Sequence # 9 StandpipeConnection

34 Slide 5-121 Walk-around 700 29th Street Command Sequence # 9 Side C Side B

35 Slide 5-122 Walk-around 700 29th Street Command Sequence # 9 Side C

36 Slide 5-123 Side D Walk-around 700 29th Street Command Sequence # 9

37 Slide 5-124 COMMAND SEQUENCE # 9 1ST ALARM RESOURCES Engine 1Engine 1 Engine 2Engine 2 Engine 3Engine 3 Truck 1Truck 1 Squad 1Squad 1 Battalion Chief 1Battalion Chief 1 – All companies staffed with four firefighters – Battalion Chief 1: 30-minute response

38 Slide 5-125 13-story high- rise, 75' x 75', fire-resistive construction, occupied as a medical laboratory/ office building. Heavy fire, one window, sixth floor, Side A. Medium smoke upper floors. All occupants have been removed. Activity 700 29th Street Command Sequence # 9 Side B Side A StandpipeConnection N

39 Slide 5-126 700 29th St. Medical Laboratory Tower 13 Stories: 75' x 75' Jones St. Fire Tower Fire Tower Elevator N Parking Lot Side A Side B Side C Side D Standpipe Connection 700 20th St. Sixth Floor

40 Slide 5-127 WHAT IS THE SITUATION? (SIZEUP) Sizeup report example: On location at 700 29th Street, 13-story highrise building 75' x 75', fire-resistive construction, occupied as medical laboratory/office building.On location at 700 29th Street, 13-story highrise building 75' x 75', fire-resistive construction, occupied as medical laboratory/office building. Heavy fire and smoke from one window, sixth floor Side A, light to medium smoke upper floors.Heavy fire and smoke from one window, sixth floor Side A, light to medium smoke upper floors. All occupants have been removed.All occupants have been removed. No other immediate exposures.No other immediate exposures. Engine 1 is establishing 29th Street command.Engine 1 is establishing 29th Street command.

41 Slide 5-128 WATER SUPPLY, FIXED SYSTEMS, SALVAGE ACTION PLAN

42 Slide 5-129 WHAT CAN BE ACCOMPLISHED? INCIDENT OBJECTIVES Contain and control fire to room/ building of origin.

43 Slide 5-130 WHAT NEEDS TO BE DONE? INCIDENT STRATEGY(IES) Exposure protectionExposure protection Confinement/ExtinguishmentConfinement/Extinguishment Special equipmentSpecial equipment VentilationVentilation SalvageSalvage

44 Slide 5-131 HOW ARE YOU GOING TO DO IT? INCIDENT TACTICS Exposure protectionExposure protection – Deploy large diameter hoseline for water supply – Deploy one 1-3/4-inch hoseline from seventh floor standpipe to seventh floor for exposure protection Confinement/ExtinguishmentConfinement/Extinguishment – Deploy one 2-1/2-inch hoseline from sixth floor standpipe for confinement/extinguishment – Deploy one 1-3/4-inch hoseline from fifth floor standpipe to sixth floor for backup line support Special equipmentSpecial equipment – Stretch two 2-1/2-inch hoselines to standpipe connection – Deploy water-absorbent materials to reduce water damage on sixth floor

45 Slide 5-132 HOW ARE YOU GOING TO DO IT? INCIDENT TACTICS (cont'd) VentilationVentilation – Vent stairwells to roof. – Horizontal cross ventilation all floors SalvageSalvage – Provide salvage cover protection to floors and equipment below fire – Divert runoff water to prevent contamination

46 Slide 5-133 IMPLEMENT THE WATER SUPPLY FIXED SYSTEMS SALVAGE ACTION PLAN Communicate assignments clearly to all resources operating on the incident.

47 Slide 5-134 IMPLEMENT THE WATER SUPPLY FIXED SYSTEMS SALVAGE ACTION PLAN (cont'd) Evaluate progress every 10 minutes.Evaluate progress every 10 minutes. Obtain feedback reports from resources operating on the incident.Obtain feedback reports from resources operating on the incident.

48 Slide 5-135 Side A Side B 13-story high- rise, 75' x 75', fire-resistive construction, occupied as a medical laboratory/ office building. Heavy fire, one window, sixth floor, Side A. Medium smoke upper floors. All occupants have been removed. Activity 700 29th Street Command Sequence # 9 StandpipeConnection

49 Slide 5-136 Activity 5.2 Scenario 1 Salvage 122 M Street

50 Slide 5-137 Sides A and D Side A 122 M Street Side D Walk-around 122 M Street Activity 5.2 Scenario 1

51 Slide 5-138 Side B Walk-around 122 M Street Activity 5.2 Scenario 1

52 Slide 5-139 Side C Walk-around 122 M Street Activity 5.2 Scenario 1

53 Slide 5-140 Side C Exposure C1 Walk-around 122 M Street Activity 5.2 Scenario 1

54 Slide 5-141 Side D Exposure C2 Walk-around 122 M Street Activity 5.2 Scenario 1

55 Slide 5-142 ACTIVITY 5.2 SCENARIO 1 1ST ALARM RESOURCES Engine 1Engine 1 Engine 2Engine 2 Engine 3Engine 3 Truck 1Truck 1 Squad 1Squad 1 Battalion Chief 1Battalion Chief 1 – All companies staffed with four firefighters – Battalion Chief 1: 30-minute response

56 Slide 5-143 Heavy fire and smoke third floor, Side C. All occupants have been removed. Second-floor occupancy directly below has an expensive art collection. Side C Walk-around 122 M Street Activity 5.2 Scenario 1

57 Slide 5-144 N Exposure C1 Exposure C2 Parking Side A Side B Side C Side D 122 M St.

58 Slide 5-145 LR BR Ba K 45' 25' Side A Third Floor Side B Side C Side D 122 M St.

59 Slide 5-146 Activity 5.2 Scenario 2 Salvage 246 10th Street

60 Slide 5-147 Sides A and B Side B Side A Walk-around 246 10th Street Activity 5.2 Scenario 2

61 Slide 5-148 Side B Side A Sides A and B Walk-around 246 10th Street Activity 5.2 Scenario 2

62 Slide 5-149 Side C Walk-around 246 10th Street Activity 5.2 Scenario 2

63 Slide 5-150 Sides A and D Side A Side D Walk-around 246 10th Street Activity 5.2 Scenario 2

64 Slide 5-151 ACTIVITY 5.2 SCENARIO 2 1ST ALARM RESOURCES Engine 1Engine 1 Engine 2Engine 2 Engine 3Engine 3 Truck 1Truck 1 Squad 1Squad 1 Battalion Chief 1Battalion Chief 1 – All companies staffed with four firefighters – Battalion Chief 1: 30-minute response

65 Slide 5-152 Side B Side A Sides A and B 246 10th Street Activity 5.1 Scenario 2 Medium smoke second and third floors Side A and B. All occupants have been removed. First-floor occupancy uses various acids for mixing.

66 Slide 5-153 Activity 5.2 Scenario 2 246 10th Street Heavy smoke second and third floors, Sides A and D. Medium smoke Side C. All occupants have been removed. Sides A and D Side A Side D

67 Slide 5-154 2-story Warehouse 1-story E 3-story Office 3-story Warehouse E 50' Fire on Second Floor N 75' E Side A Side B Side C 246 10th St. Side D

68 Slide 5-155 Activity 5.3 Large Exercise 3 Three-Story Bank/Office BuildingThree-Story Bank/Office Building 900 16th Street900 16th Street

69 Slide 5-156 Side A Walk-around Large Exercise 3 900 16th Street Three-story bank building, 125' x 175', noncombustible construction, building is sprinklered and contains standpipe connections in stairways, occupied by 250 employees. N

70 Slide 5-157 Side A Walk-around Large Exercise 3 900 16th Street

71 Slide 5-158 Sides A and B Walk-around Large Exercise 3 900 16th Street Side A Sprinkler/Standpipe Connection Side B Side B

72 Slide 5-159 Side B Walk-around Large Exercise 3 900 16th Street

73 Slide 5-160 Side C Sides B and C Walk-around Large Exercise 3 900 16th Street Side B

74 Slide 5-161 Side C Walk-around Large Exercise 3 900 16th Street

75 Slide 5-162 Side C Walk-around Large Exercise 3 900 16th Street

76 Slide 5-163 Side C Sides C and D Walk-around Large Exercise 3 900 16th Street Side D

77 Slide 5-164 Side D Walk-around Large Exercise 3 900 16th Street

78 Slide 5-165 Side D Sides A and D Side A Walk-around Large Exercise 3 900 16th Street

79 Slide 5-166 Side A Side D Sides A and D Walk-around Large Exercise 3 900 16th Street

80 Slide 5-167 Side A Walk-around Large Exercise 3 900 16th Street

81 Slide 5-168 LARGE EXERCISE 3 1ST ALARM RESOURCES Engine 1Engine 1 Engine 2Engine 2 Engine 3Engine 3 Truck 1Truck 1 Squad 1Squad 1 Battalion Chief 1Battalion Chief 1 – All companies staffed with four firefighters – Battalion Chief 1: 30-minute response

82 Slide 5-169 Side C Large Exercise 3 900 16th Street Conditions upon arrival: Friday 2 p.m. Heavy fire three windows, third floor, Side C. Report of occupants trapped on the third floor. Second floor is the main computer floor, National Bank.

83 Slide 5-170 3rd Floor Offset Interior Elevator Shafts Elevator Shafts N Drive-Through Teller Parking Sprinkler/Standpipe connection Side A Side B Side D Side C 900 16th St. Covered Truckway Stairs

84 Slide 5-171 Large Exercise 3 900 16th Street Conditions 15 minutes after arrival. Side C

85 Slide 5-172 Conditions 30 minutes after arrival. Side C Large Exercise 3 900 16th Street

86 Slide 5-173 Large Exercise 3 900 16th Street Side C Conditions 40 minutes after arrival.

87 Slide 5-174 TRANSFER OF COMMAND REPORT PROCEDURE Location and extent of fireLocation and extent of fire Control effortsControl efforts Deployment of resourcesDeployment of resources Need for additional resourcesNeed for additional resources To be delivered to the next commanding officer arriving at an incident


Download ppt "Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8."

Similar presentations


Ads by Google