Curriculum Review LOG “Performance Based Life Cycle Sustainment” Presented to the Life Cycle Logistics (LCL) Functional Integrated Product Team (FIPT) Presented by Dave Floyd, CPL Performance Learning Director Defense Acquisition University
2
Agenda Overview Status Update Schedule Issues and Concerns
Alternatives Questions & Answers
3
Overview LOG 340 replaces LOG 236 (PBL) with a two-week , 300 Level Performance-Based Course Nine case studies over the 8 ½ day course Two full day exercises/workshops (LCSP, BCA) Leverages off of LOG 236 and 304 as a baseline and point of departure Responds to , Next Generation Product Support Business Model and New DAG update Aligns with LOG 201, LOG 235 and LOG 350 Transitions from TLO/ELO construct to Competency/Proficiency construct Based on LCL, Supply, Maintenance and Deployment/Distribution/ Transportation competency sets Includes a simulation game IAW new policy emphasis Leverages CL Modules as prerequisites, read-aheads and homework Shifts from “Instructor-led” to “Instructor-facilitated”
4
Status LOG 340 Proposal submitted on 8 April, 2010
LOG 340 Task Proposal submitted on 13 April, 2010 Life Cycle Logistics Guidebook (formerly the Acquisition Logistics Guide) Contract awarded in mid May Project Management Plan delivered 21 June, 2010 Project Management Plan approved 1 July, 2010 Issues with Instructor and Student Pilot dates Correlation of LOG 340 TLOs and ELOs to DoD Core Logistics Competencies and Proficiencies delivered 15 July, 2010 Comments submitted 21 July, 2010 Comments on LOG 340 Task Proposal sent on 15 July, 2010 Award of LOG 340 Task anticipated by end of July 2010
5
LOG 340 Development Schedule
Task Number Task Title Deliverable PWS Section Reference Start Date End Date Task 3 Conduct Design Meeting and Develop Course Design Document Final Course Design Document 4.2 Course Design Document 08/23/10 09/06/10 Task 4 Develop Draft Course Materials Draft Course Materials 4.2.2 Task 2: LOG340 Course Development 09/07/10 11/24/10 Task 5 Conduct a Review and Provide Recommended Changes to the “Performance-Based Logistics: A Program Manager’s Product Support Guide” Recommended Changes to the “Performance-Based Logistics: A Program Manger’s Product Support Guide” 4.2.3 Performance Based Logistics: A Program Manager’s Product Support Guide” Review and Comment 11/18/10 12/06/10 Task 6 Conduct a Review and Provide Recommended Changes to the On-Line PBL Toolkit Recommended Changes to the On-Line PBL Toolkit 4.2.4 On-Line PBL Toolkit Review and Comment Task 7 Conduct Faculty Pilot Validation Plan 4.4 Faculty Pilot 12/07/10 12/17/10 Task 8 Support Student Pilot 4.5 Student Pilot 01/25/11 02/04/11 Task 9 Develop Final Course Materials Final Course Materials 02/07/11 02/18/11
6
Issues and Concerns LOG teaching requirements are expected to increase
Growth in Acquisition workforce Increase in student throughput quotas from USAF and DLA Additional LOG courses to be deployed Insourcing DAU is not funded to hire more Life Cycle Logistics instructors DAU classroom capacity is reaching it’s peak LOG 340 is a two-week course that will replace a one-week course The additional week of training introduces risk of exceed instructor and classroom capacity Contingency planning is needed to address these issues and concerns
7
Week One Notional Course Outline
8
Week Two Notional Course Outline
9
New One Week Notional Course Outline
Moved from first week of two-week LOG 340 course
10
Week One Course Lessons for Reapplication
Consider Merging With LOG 350 Move to One-week LOG 340 Turn highlighted lessons into one-week course On Line Course, or Classroom Convert to individual CLMs Hold for future use