Presentation is loading. Please wait.

Presentation is loading. Please wait.

IMT-Advanced Closing Report

Similar presentations


Presentation on theme: "IMT-Advanced Closing Report"— Presentation transcript:

1 IMT-Advanced Closing Report
November 2007 doc.: IEEE /2788r2 November 2007 IMT-Advanced Closing Report Date: Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Darwin Engwer Nortel Networks 4655 Great America Pkwy, Santa Clara CA 95054 408 495 2588 Bruce Kraemer (Marvell); Darwin Engwer(Nortel) Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

2 November Session Goals
WG11 Finalize WG 11 suggested changes to IMT.TECH Finalize WG 11 suggested changes to IMT.EVAL Accept/Negotiate suggested changes from other WGs WG11 approval of output document to ITU (Friday) 802 ExCom approval of output document to ITU (Friday) Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

3 Document References November 2007
The document submitted to ITU-R WP8F was, as requested by WP8F, a markup of the WP8F template A second clean version was also produced that was easier to read A summary of results of the Kyoto meeting has been posted: Along with a more in depth report which will presented during the Tuesday evening meeting of : Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

4 IMT Document References –
November 2007 IMT Document References – Conference Call Material - Sep - November ‘07 Nov Minutes Nov r1 Minutes Oct r1 Agenda r2 Minutes Oct Minutes Oct Minutes Oct Minutes Sep Minutes Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

5 WG 18 Document References – Nov ‘07
November 2007 WG 18 Document References – Nov ‘07 The latest version of the composite 802 versions of the documents are stored in the WG18 server Index of /18/Meeting_documents/2007_Nov 04-Nov : _IMT-Advanced_Reqrmnt_2_d1.doc 05-Nov : _IMT-Advanced_Eval_d0.doc 05-Nov : Draft_RR-TAG_Agenda_Nov07.xls 12-Nov : _Update_ on_ _IMT_Advanced.ppt 12-Nov : _Update_ on ITU-R Activities.ppt 14-Nov : d0_ITU-R_WP-5_Proposed_Org.doc Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

6 Output documents 18-07-0084-00_IMT-Advanced_Eval_d5.doc
November 2007 Output documents _IMT-Advanced_Eval_d5.doc _IMT-Advanced_Reqrmnt_2_d5.doc Bruce Kraemer (Marvell); Darwin Engwer(Nortel)

7 Motion Move to approve documents
November 2007 Motion Move to approve documents _IMT-Advanced_Eval_d5.doc _IMT-Advanced_Reqrmnt_2_d5.doc and report our acceptance to WG18. Bruce Kraemer (Marvell); Darwin Engwer(Nortel)


Download ppt "IMT-Advanced Closing Report"

Similar presentations


Ads by Google