FNAL Hybrid Testing Status

Similar presentations


Presentation on theme: "FNAL Hybrid Testing Status"— Presentation transcript:

1 FNAL Hybrid Testing Status
Week of 4/12-4/18

2 FNAL Hybrid Testing Status
Weekly Cumulative Hybrid ID Rec’ed Pass Fail %Pass PLL (%) R2S R2D R5S R5D R6U L56p 233 230 3 98.71 78 (33.48) L34p&L12pu 267 91 4 256 11 95.88 89 (33.33) L12pd L12su L12sd Total 500 486 14 97.20 167 (33.40) 86 hybrids received last week not included

3 Fermilab Hybrid Testing Failures
This Week 1 with Shorts in PA 2 all chips noisy & shorted 1 2 open, 3 noisy channels (may pass if eliminate edge channels) Cumulative 5 with Shorts in PA 7 Noisy channels-usually entire chip or chips 1 a few open and noisy channels

4 FNAL PLL Statistics No obvious correlation

5 Fermilab Hybrid Testing Issues
Running 7_2 ARCS code (original) Need the version (6.1) on new PC working I would like to try a few things to shorten run time Run takes 55 minutes! Noisy edge channels —> re-testing, raised noise cut from 1.3 to 1.6 ADC counts Cooling to –17, using mid-range temp sensor shortened time