Texas Department of Transportation.  Authorized under TEA-21  Discretionary Program (Fed Earmarks)  Pharr District Allocations 1.Border State Insp.

Similar presentations


Presentation on theme: "Texas Department of Transportation.  Authorized under TEA-21  Discretionary Program (Fed Earmarks)  Pharr District Allocations 1.Border State Insp."— Presentation transcript:

1 Texas Department of Transportation

2  Authorized under TEA-21  Discretionary Program (Fed Earmarks)  Pharr District Allocations 1.Border State Insp. Facilities $ 2.6 M (FY 00/01) 2.Various POE Facilities $ 4.1 “(FY 99/01/05) 3.Brownsville/Matamoros RR $ 1.3 “ (FY 00) 4.Mile 2 W $ 1.2 “ (FY 01) 5.FM 1016 $ 0.5 “ (FY 02) 6.Harlingen RR Reloc $ 3.6 “ (FY 04/05) 7.West Rail Reloc. $ 1.7 “ (FY 05) 8.Hid. Co. Loop $ 0.5 “ (FY 05) $27.2 M P HARR DISTRICT TEXAS DEPARTMENT OF TRANSPORTATION Texas Department of Transportation

3  Authorized under SAFETEA-LU  Over $800 Million over 6 yr bill nationwide  Funding distribution based on formula 1.20% based on NB commercial trucks 2.30% based on NB personal vehicles and buses 3.25% based on NB weight of cargo 4.25% based on number of land ports of entry  Texas allocation $210 million P HARR DISTRICT TEXAS DEPARTMENT OF TRANSPORTATION Texas Department of Transportation

4  Statewide consensus meeting (Div, border and adjacent districts, and MPO’s)  Consensus arrived at: 1.CBI funding distributed to 3 border districts 2.Distribution made based on federal formula 3.Projects restricted to 50 miles from border 4.Each district would coordinate with MPO for distribution. P HARR DISTRICT TEXAS DEPARTMENT OF TRANSPORTATION Texas Department of Transportation

5  Pharr District allocation (Approx. $67 M)  Distribution among all POE’s/MPO’s based on same federal formula: 1.Hidalgo/Pharr (HCMPO) : $31 M 2.Progreso (HCMPO) : $3.6 M 3.Cameron Co. (HSB & BMPO): $25 M 4.Starr/Camargo : $4.5 M 5.Roma : $ 3.4 M P HARR DISTRICT TEXAS DEPARTMENT OF TRANSPORTATION Texas Department of Transportation

6  Projects within MPO boundaries identified and approved by MPO.  Projects within rural areas coordinated with bridge owner/municipalities. P HARR DISTRICT TEXAS DEPARTMENT OF TRANSPORTATION Texas Department of Transportation

7 US 83 Bravo Extension Limits: US 83 to Roma/RGC Relief Route Description: Extend 2 lane city street CBI Funds: $3.3M

8 FM 755 Re-alignment FM 755 Re-alignment Limits: US 83 to FM 755 Description: Re-align 2 lanes on FM 755 CBI Funds: $4.3M

9 Future GSA Exist. FM 396 FM 396 Extension (Anzalduas) Limits: From US 83 to GSA facilities south of FM 1016 Description: Construct new 4 lane divided CBI Funds: $6.0M Bryan Rd Mission Future Anzalduas Int’l Bridge

10 SP 241 Limits: SP 115 to GSA Facility @ Hidalgo Int’l Bridge Description: Widen to 6 lane divided CBI Funds: $2.6M SP 241 GSA SP 115

11 FM 1016 SP 241 SP 115 Limits: FM 1016 to SP 241 @ SP 115 in Hidalgo Description: Widen to 6 lane divided CBI Funds: $8.0 M

12 Hidalgo Int’l Bridge Limits: @ Hidalgo Int’l Bridge Description: Improvements @ Hidalgo Int’l Bridge CBI Funds: $1.0M

13 Overpass @ “I” Rd/US 281 Limits: US 281 @ “I” Rd Description: Construct Overpass CBI Funds: $7.0M Overpass @ “I” Rd/US 281-Military

14 Pharr Int’l Bridge US 281-Military SP 600 Pharr Int’l Bridge Limits: @ Pharr Int’l Bridge Description: Improvements @ Pharr Int’l Bridge CBI Funds: $5.0M

15 Floodway US 281- Military FM 1015 Limits: Floodway South to US 281- Military Description: Widen to 4 lane divided CBI Funds: $2.4M

16 Progresso Int’l Bridge Limits: @ Progresso Int’l Bridge Description: Improvements @ Progresso Int’l Bridge CBI Funds: $1.0M

17 Los Indios Free Trade Int’l Bridge Limits: @ Los Indios Free Trade Int’l Bridge Description: Construct Parking Lot CBI Funds: $320,000

18 O Overpass @ FM 509/US 281 Military US 281-Military Limits: @ FM 509 Description: Construct overpass on new location @ US 281- Military & FM 509 CBI Funds: $7.0 M

19 Prop. East Loop Phase II (City) Prop. East Loop Phase I (Completed) Prop. FM 511 Freeway Brownsville 83 77 FM 511 EAST LOOP Prop. FM 511 Realignment East Loop Limits: US 77/83, East to Azucena St. Description: On new loc, construct 4 ln div CBI Funds: $5.2M East Loop Limits: Azucena St., East to FM 1419 Description: On new loc, construct 4 ln div CBI Funds: $5.2M

20 Los Tomates Int’l Bridge Limits: @ Los Tomates Int’l Bridge Description: Improvements @ Los Tomates Int’l Bridge CBI Funds: $6.25M Los Tomates Int’l Bridge

21 P HARR DISTRICT TEXAS DEPARTMENT OF TRANSPORTATION Texas Department of Transportation


Download ppt "Texas Department of Transportation.  Authorized under TEA-21  Discretionary Program (Fed Earmarks)  Pharr District Allocations 1.Border State Insp."