2 SEMI Global 2016 Calendar of Events
Event Name Event Details July 12-14 San Francisco, California September 7-9 Taipei, Taiwan October 25-27 Grenoble, France December 14-16 Big Sight Tokyo

3 Standards Meetings at SEMICON West 2016
Sunday Monday Tuesday Wednesday Thursday Friday Saturday 10 11 12 13 14 15 16 NARSC 3DS-IC EH&S Schedule at-a-glance Facilities & Gases HB-LED Information & Control Liquid Chemicals MEMS/NEMS Metrics Microlithography PV Materials Physical Interfaces & Carriers San Francisco Marriott Marquis Hotel Silicon Wafer Traceability

4 NA Standards Fall 2016 Meetings NA Standards Spring 2017 Meetings
Upcoming NA Meetings Event Name Event Type Date / Venue NA Standards Fall 2016 Meetings Standards Meetings November 7-10, 2016 SEMI HQ in San Jose, California NA Standards Spring 2017 Meetings April 3-6, 2017 SEMICON West 2017 July 10-13, 2017 San Francisco, California

5 2016 Critical Dates for SEMI Standards Ballots
Ballot Submission Deadline Voting Opens Voting Closes Cycle 6 July 22 Aug 1 Sep 1 Cycle 7 Aug 17 Aug 31 Sep 30 Cycle 8 Oct 17 Oct 24 Nov 23 Cycle 9 Nov 16 Nov 30 Dec 30 Fall Adjudication

6 SEMI Standards Publications
Cycle New Revised Reapproved Withdrawn March 2016 2 20 4 April 2016 8 10 May 2016 3 June 2016 Total SEMI Standards in portfolio: 964 Includes 141 Inactive Standards

7 New Requirements/Process Reminders for TC Chapter Meetings [1/2]
Standards Document Development Project Period Project period shall not exceed 3 years (Regs 8.3.2) SNARF approval to TC Chapter approval If document development activity is found to be continuing, but cannot completed with the project period, TC Chapter may grant one-year extension at a time, as many times as necessary. The TC Chapter should review the expiration dates for all applicable SNARFs at each TC Chapter meeting. (PM Note 10) SNARF Review Period A submitted SNARF for a new, or for a major revision to an existing, Standard or Safety Guideline is made available to all members of a TC Chapter’s parent global technical committee for two weeks for their review and comment. (Regs 8.2.1) If the SNARF is submitted at a TC Chapter meeting, the committee can review and approve, but the SNARF will need to be distributed for two weeks and then approved via GCS. New SNARF & TFOF Form

8 New Requirements/Process Reminders for TC Chapter Meetings [2/2]
Procedures for Correcting Nonconforming Titles of Published Standards Document (PM Appendix 4) Some Standards qualify for a special procedure where a line item change can be used to correct the titles. Otherwise, the corrective action will likely require a major revision.

9 Nonconforming Titles 5-Year Review None
Refer to Procedure Manual (PM) Appendix Table A4-1 for details on nonconforming titles 5-Year Review

10 SNARF 3-Year Status Doc. 5267, New Standard: Specification for Microfluidic Port and Pitch Dimensions SNARF was approved on 06/03/2011 Granted 1-year extension in Spring 2015 Granted an additional year in Spring 2016 Action needed by Spring 2017 TC Chapter may grant a one-year extension