Presentation is loading. Please wait.

Presentation is loading. Please wait.

Nancy McCrimmon – 32 Soft Inc.

Similar presentations


Presentation on theme: "Nancy McCrimmon – 32 Soft Inc."— Presentation transcript:

1 Nancy McCrimmon – 32 Soft Inc.
Shatter the Pain Chain Presented by Judy Gardner – Walbro Don Lindsey – CESI Nancy McCrimmon – 32 Soft Inc. March 20, 2018

2 Agenda 32 Soft Session Objectives Introduction of Speakers CESI WALBRO
Q&A

3 About 32 SOFT Assisting QAD users since 2001: Enhance QAD performance
Collaborate with clients Provide expert consultation Develop unique solutions Empower end users Free up IT resources

4 Objective Review and assess case studies: Life Science Company
Global Manufacturer of Small Engine Components

5 Introductions Today’s Team: Nancy McCrimmon – 32 Soft
Don Lindsey – CESI Judy Gardner – Walbro

6 CESI - ERP Evolution 1995 - Navision 2000 - Great Plains
Implemented QAD Add SSM and GRS Functionality Upgrade from .NET 1.1 to .NET 2.9 Upgrade from SE to EE Eagle Bar Coding Install 32 Soft PO Requisition System Internationalization thru Multiple Domains 2015 – QAD Fixed Asset Module EMT Requisition Plus 2018 – Upgrade to QAD EE 2018

7 CESI - Volumes Department Users Facilities 3 Finance 10 IT 8
Operations 18 QC 4 R&D 79 Sales 6 Supply 8 Total:

8 Walbro - ERP Evolution 1997 QAD 6.5 1999 QAD 7.1 2005 QAD eB.2
2007 QAD 2007 eB.2.1 Multi domain 2011 QAD 2010 SE Soft Intro – Simulated Cost Set 2013 Supplier/Customer Data Loaders 2014 Purchased 12 Loaders 2016 EMT Between Walbro Sites 2017 QAD 2014 SE

9 WALBrO - Volumes

10 Data Loaders – Consistency!
Get familiar with one… Enter CSV List of Items, Prod Line, Work Order, etc. Import files to pre-populate Online Applications Ease of Use

11 Item Planning

12 Set up

13 Login

14 Selection Criteria

15 download

16 Qad before

17 Change data

18 Upload data

19 Upload successful

20 Qad after

21 CESI - Cycle Count Issues
Weekly cycle count process Multiple sites Laborious process for manually entering data Both Initial and Recounts

22 CESI - Solution: Data Loaders
Data Loader for – Cycle Count Worksheet Print

23 CESI - Master Data - Defining Items
Issues: New End Products – must create many System of Record = Master Control Process is laborious: to manually enter 83 Item Master fields, 20 Item – Site Inventory fields and 48 Item – Site Planning fields, and enter data Items BOM’s, Routing And maintain over time Complex DNA Lots Batches, Size UoM People with knowledge needed

24 CESI - Solution: data loaders
Data Loaders for Master Data Item Master Maintenance Item-Site Inventory Data Maint Item-Site Planning Maintenance

25 CESI - Product Structure
Issues: 4,752 New BOMS for New Products in 2017 System of Record = Master Control Previously maintained a Picture of in Master Control as Control Now we use Soft Loader Very complicated structures and processes for manually entering data .NET entry, Desktop entry Costing New 13.5 and 15.5 – BOM Report – Formula Report

26 CESI - Solution: Data Loaders
Data Loaders for Master Data Product Structure Maintenance Formula Maintenance Formula Code Maintenance Controlled Document in Master Control. People collaborate on changes. Then, we approve and upload to QAD.

27 CESI - Installed Base Issues:
Voluminous and Transactions between Domains and Sites Laborious Process for Manually entering data Typical of SSM – 35 Fields in , 9 fields in R-Parts – Refurbished and Repaired Parts Software – Manifest Log Report, output from the instrument with Serial #’s Xml and txt Records in Installed Base = 8,291 Records in Installed Base Configuration = 21,652

28 CESI - Solution: Data Loaders
Data Loaders for Installed Base Installed Base Item Maintenance Installed Configuration Maint Add – Move – Update

29 CESI - Purchase Requisitions
Issues: High Daily Volumes of Memo Type Requisitions 43,000 since 2016 Sox Issues Approval Process Attachments Arduous Process for Manually entering data into Requisition Maintenance

30 CESI - Solution: Data Loaders &…
Online Application for Requisition Plus Attachments Approvers

31 Walbro - EMT/Inter-Company Transfer
Issues: Transactions between domains and sites Voluminous PO and SO Burdensome Process for Manually entering data

32 challenges Time zones between plants
Languages (Japanese, Chinese, Spanish) Time constraints (not enough time for daily manual entry) Plant communication issues Air shipments between plants causing lost revenue Purchases from internal suppliers: • 60% Thailand • 20% China • 40% Mexico

33 Walbro - Solution: EMT Data Loader for EMT

34 Walbro - Work Order Buffer
Issues: How to Manage Work Orders Changes What Work Orders are “hot” Communication between Departments Communication between Shifts

35 Walbro - Solution: WORK ORDER BUFFER

36 Walbro - Cost Simulation thru BOM
Issues: Having Time restraints To customer BOM “Mock up” Pricing issues Number of customer request New Product – how to cost

37 Walbro – BOM COST SIMULATION

38 Walbro - MSW/PSW Work Order
Issues: Part Shortages for Work Orders QAD’s MSW/PSW Difficult Challenging to see demand scheduled to production Issues with capacity What “if” scenarios

39 Walbro – MSW/PSW wo Judy to do Work Orders/Scheduling/Production Planning

40 conclusion Real partner Dedicated support Measurable success 40

41 You, too, can shatter the pain chain!
prediction You, too, can shatter the pain chain!

42 Questions? Q A


Download ppt "Nancy McCrimmon – 32 Soft Inc."

Similar presentations


Ads by Google