Presentation is loading. Please wait.

Presentation is loading. Please wait.

Key facts PLEEC Funded by Partnership Duration

Similar presentations


Presentation on theme: "Key facts PLEEC Funded by Partnership Duration"— Presentation transcript:

1

2 Key facts PLEEC Funded by Partnership Duration
„Planning for energy efficient cities“ PLEEC European Union Seventh Framework Programme Funded by 18 partners from 13 European countries 6 mid-sized cities, 9 universities, 3 industry partners Partnership 36 months April March 2016 Duration

3 Aim: Improving energy efficiency
Background EU´s goals Aim: Improving energy efficiency by 20% in 2020

4 Background Current problems:
Deficit of holistic knowledge about energy efficiency potentials in cities Variety of inidividual strategies tackling separate city key aspects No strategic energy efficiency planning in European cities

5 PLEEC approach Coordinating strategies Combining best practices Sharing energy efficiency recommendations PLEEC project uses integrative approach Aim: To develop a general model for energy efficiency and sustainable city planning

6 Specific objectives To assess the energy-saving solutions and potentials for a comprehensive city planning To identify the future research agenda on the issue of energy-smart cities To develop a synergized model for energy efficiency planning considering city key aspects To create Action Plans to be presented to decision-makers in the cities To demonstrate how integrative planning is more efficient than separate measures

7 Work Packages

8 Santiago de Compostela (ES)
Methodology (1) Six mid-sized PLEEC cities: Eskilstuna (SE) Stoke-on-Trent (UK) Turku (FI) Tartu (EE) Santiago de Compostela (ES) Jyäskylä (FI)

9 Methodology (2) WP 2: Elaboration of energy smart city profiles
Month : Work Package 2 Analysis of performance of participating cities within city key aspects Month : Three parallel Work Packages 3, 4, 5: Elaboration of energy efficiency recommendations from three key perspectives WP 3: Technology- driven energy efficiency WP 4: Structure-driven energy efficiency WP 5: Behaviour-driven energy efficiency

10 Methodology (3) Action Plan for Energy Smart City
Month : Work Package 6 Integration of results from WP 2, 3, 4 and 5 in Action Plan for Energy Smart City Model of sustainable city planning Summary of best matching recommendations

11 Dissemination of the project´s results at local,
Methodology (4) Month : Work Package 7 Dissemination of the project´s results at local, national and EU levels Project website Events, conferences Promotion material Social media Press relations

12 Partnership

13 Contact www.pleecproject.eu http://pleec.blogspot.de/
Lead coordinator: Mikael Kullman Eskilstuna Energy and Environment Kungsgatan 86 SE Eskilstuna Sweden Phone: Mobile: Find us on: Facebook: Twitter: Blog:


Download ppt "Key facts PLEEC Funded by Partnership Duration"

Similar presentations


Ads by Google