Presentation is loading. Please wait.

Presentation is loading. Please wait.

ERTMS Application on Tests and Maintenance

Similar presentations


Presentation on theme: "ERTMS Application on Tests and Maintenance"— Presentation transcript:

1 ERTMS Application on Tests and Maintenance
ICT for Railways ERTMS Application on Tests and Maintenance 10/04/2014 ICT on Railway ERTMS Testing

2 ICT Applied for ERTMS Testing
Summary ICT importance on Railway ERTMS Testing: Aim: Assuring Interoperability Adding Value (making verification cost effective) ICT Technologies: Real-time data acquisition and processing: Image processing (event detection and recognition), Robot control (24h operation – remote site operation), Distributed Processing (synchronisation, automated analysis) Fields: Laboratory test of ERTMS implementations (Track, Onboard) Track validation of implementations (Real-time standard check) European Railway Network: Distributed ERTMS laboratory network for validation of corridors across Europe. ICT on Railway ERTMS Testing

3 ICT on Railway ERTMS Testing
ICT on ERTMS Testing Assuring Interoperability: Problem: Legacy systems compatibility Market protection Solution: Assure independent assessment of deployments Adding Value: Making validation cost effective: Fast and cheap enough to: - Shortcuts on systems validation Comprehensive enough to provide support for its development ICT on Railway ERTMS Testing

4 ICT Technologies: Image Processing
3D Acquisition of DMI Image stabilisation (1) 3D video acquisition (2) Hand removal. (3) (1) (2) (3) ICT on Railway ERTMS Testing

5 ICT Technologies: Robot Control
Robot Control allows: 24hs x 24hs operation Black box testing Track equipment connected with onboard equipment in different sites Requirements: Real-time operation (including image recognition) ICT on Railway ERTMS Testing

6 ICT Technologies: Distributed Processing
Validation of Corridors Implementations: Onboard equipment in 1 country Track from countries where the corridor passes through Country: A ____________________________ B C Test Bench EVC RBC IXL RBC IXL ICT on Railway ERTMS Testing

7 ICT Technologies: Results Analysis
Semi-Automatic Analysis of ERTMS results (From Interface to SRS): Integrated and synchronized, including DMI, JRU, TIU, ODO, BTM, RTM. User Customizable ICT on Railway ERTMS Testing

8 Laboratory ERTMS Equipment Tests
Onboard: EVC (Onboard): - Subset-076 (Functionality), - Subset-041 (Performance), - Reliability Track Implementations and transitions: RBC (Radio Block Center) IXL (Interlocking) Standards: ERTMS National Systems (compatibility) Operational Tests ICT on Railway ERTMS Testing

9 ICT on Track Validation/Maintenance Tests
Maintenance solutions for: Preventive Balise Failures (RF and Signal Processing), which comprises: A receiving antenna called the “SENSING LOOP” attached below the BTM antenna on the train. A Main Control Unit (MCU) and A GPS receiving antenna: The EUROBALISE ANALYZER gives an onboard automatic EUROBALISE tests tool for maintenance of on-track deployed Eurobalises. Radio Interference Detection (Radio Technology) Pantograph Fault Detection (Image Processing) EBTM SNIFFER MCU BTM BTM ANTENNA SENSING LOOP EUROBALISE ICT on Railway ERTMS Testing

10 European Railway Network Alliance Aligned with ERDF 2014-2020 Priorities
+ 40 European universities have been contacted + 17 have confirmed their interest + 11 have confirmed their participation ICT on Railway ERTMS Testing 10 10

11 An ICT/ rail / transport European Alliance
Track & board railway interoperability Rolling stock Interoperability (mechanical test solutions, maintenance, noise) TTK University of Applied Sciences Silesian University of Technology Cardiff University Poznan University of Technology Kaunas University of Technology European Railway R&D Network coordinated by Multitel Széchenyi Istvan University Technical University of Sofia University of Mons University Politehnica of Timisoara University of Ljubljana Riga Technical University Certh - HIT University of Zilina Catholic University of Louvain University of Bari University of Pardubice University of Miskolc Training center (driver,simulator) Multimodality (automotive, ship, optimization, urbain rail ICT on Railway ERTMS Testing

12 ICT on Railway ERTMS Testing
Conclusion ICT applied to testing has resulted in: Reduction of Onboard testing from 9 months to 1 month: - Due to the use of: - Image recognition - Robot Control - Support to Data Analysis up to SRS requirements Practical results: Full tests now assure full standard compliance, - Without slowing down deployment and Moreover, full tests improve ERTMS interoperability ICT on Railway ERTMS Testing

13 Thanks for your attention
Thank you Thanks for your attention ICT on Railway ERTMS Testing


Download ppt "ERTMS Application on Tests and Maintenance"

Similar presentations


Ads by Google