Presentation is loading. Please wait.

Presentation is loading. Please wait.

Author: NG ETR team Last Updated: 30-Oct-2014 (V0.2)

Similar presentations


Presentation on theme: "Author: NG ETR team Last Updated: 30-Oct-2014 (V0.2)"— Presentation transcript:

1 Author: NG ETR team Last Updated: 30-Oct-2014 (V0.2)
European Transparency Regulation (ETR / ERGEG) – Industry briefing (30-Oct-2014 session) – tcon Author: NG ETR team Last Updated: 30-Oct-2014 (V0.2) ETR Industry briefing v0.2 (30-Oct-14)

2 ETR Industry briefing v0.2 (30-Oct-14)
Some ground rules Login to the “live meeting” session as “name (company)”. For example: Melanie (NG) Do not use the “live meeting” audio. Please dial in separately using the conference details in the appointment. When you have a query, use the dialog box to raise your hand. The presenter will stop at the appropriate moment and ask the person to speak. When speaking, please announce yourself “name (company)”. Sorry for this. Due to the expected large number of attendees, it is essential to follow this. ETR Industry briefing v0.2 (30-Oct-14) ETR Industry briefing v0.2 (30-Oct-14)

3 ETR Industry briefing v0.2 (30-Oct-14)
Agenda Stats on MP submission methods Proposed MODIS Design Change on Ack/Nack discussion Testing update Update on key MP queries Looking ahead Any other business ETR Industry briefing v0.2 (30-Oct-14)

4 Stats on MP submission methods (as at 29-Oct-14)
Access method Number of EIC Parties chosen the method sFTP 24 Login to submit report or to enter data 6 Web services over internet 2 Web services over leased lines 4 Unknown / NA / Not responded 21 Notes: Total of 53 EIC parties. 1 EIC party has selected “all methods”. 1 EIC party has selected 2 separate methods. Some EIC parties selected “web services over leased lines” method have also indicated their preferred alternative methods of either “sFTP” or “Login”. This is not included in the above stats. ETR Industry briefing v0.2 (30-Oct-14)

5 Proposed Design change for Ack/Nack (return messages)
NG assessment completed. Proposal attached below: In summary: Propose that MPs to fetch Ack/NAck (return) message from NG. Due to short notice of the change, NG will provide support to send Ack/NAck to MPs post ETR go-live until the end of February 2015. ETR Industry briefing v0.2 (30-Oct-14)

6 ETR Industry briefing v0.1b (30-Oct-14)
Testing update MODIS being tested internally Network for sFTP is ready and currently being tested by early adopter MPs MP sample files are being processed manually ELEXON providing support for sample file testing ETR Industry briefing v0.1b (30-Oct-14) 6

7 Update on key MP queries so far (1)
Taking note of the recent feedback, Isaac Wilks has been appointed as the ETR project Communication officer. The contact address to use is Responsibilities: Be the single point of contact for external stakeholders. Monitor ETR project for queries via the box Log, assign, chase and close out queries Bring common queries (and associated response) to MP t-cons to share Note: All ETR testing related queries will now go to the ETR project , but can be copied to the ETR Test ETR Industry briefing v0.2 (30-Oct-14)

8 Update on key MP queries so far (2)
Stats gathered since inception (20-Oct-14) as at 28-Oct-14: 11 queries raised, 5 closed. Key queries and responses: Which of my EDT lines can I use to submit data down? For those with multiple EDT lines with NG, technically any line. However, we need to know the specific IP address you intend to use so that we can ensure data traffic can come through to MODIS. What is the Registered Capacity of my BMUs for the purpose of ETR reporting? If you need this, then please send request to NG ETR box . What is the status of the sample files that I sent you? ETR Industry briefing v0.2 (30-Oct-14)

9 ETR Industry briefing v0.2 (30-Oct-14)
Looking ahead Due to additional technical issues at the current time the “web services” interface is unlikely to be ready for ETR go-live A separate development has initiated a contingency solution. This solution requires MPs to: Send their reports to NG via the sFTP route ETR Industry briefing v0.2 (30-Oct-14)

10 ETR Industry briefing v0.2 (30-Oct-14)
Looking ahead Continuing: Process MP sample reports onto ENTSOe platform via Elexon and provide feedback to MPs. TBC: Release of MODIS to allow external user access. w/c 01/12/14 (was 18/11): MODIS system rollout to Production. Note that Elexon system will not be available in the first 2 weeks of December 2014 to prepare for system go-live on 16/12/14. 16/12/14 to 04/01/15: Day 1 data load period to be organised in batches. Key risk(s) and issue(s): Risk: Unable to provide external users access to MODIS due to technical difficulties in integrating NG security layer with the MODIS application Mitigation: Alternative method being investigated. Initial testing expected Friday (31/10). Risk: Unable to provide feedback on MP sample reports Mitigation: Use of manual flow (via ) to NG Teat team. This is now possible since 17/10 when the pre-reg Master config file was successfully loaded in EMFIP (data used is aligned with LIO spreadsheet with a few exceptions). Risk: MODIS not ready in time for go-live Mitigation: Contingency plan being drawn up. Contingency solution requires MPs to submit reports via sFTP route. ETR Industry briefing v0.2 (30-Oct-14)

11 Updates on key actions:
1) Day 1 data preparation – When to submit the pre-reg Master config file relating to Company and BMUs? 23/10 Update: EMFIP indicated that pre-reg Master config data will be copied from current EMFIP Test platform. 2) Day 1 data preparation – When to submit the 3 years worth of data? 23/10 Update: Regulation seems to indicate “upto to 3 years of data”. Need to confirm this understanding amongst GB industry. Need to understand how much data the MP is planning to submit prior to go-live. 3) Confirm MODIS Design change on method of delivery of Ack/Nack messages to MPs. ETR Industry briefing v0.2 (30-Oct-14)

12 End Last slide


Download ppt "Author: NG ETR team Last Updated: 30-Oct-2014 (V0.2)"

Similar presentations


Ads by Google