Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC
2
The LIU Project The LHC Injectors Upgrade should plan for delivering reliably to the LHC the beams required for reaching the goals of the HL-LHC. This includes LINAC4, the PS booster, the PS, the SPS, as well as the heavy ion chain. 06/09/2011TE-EPC - Serge Pittet2 TEEPC D. NisbetD. Nisbet (inj.) S. Pittet Project leader R. Garoby Linac4 M. Vretnar PSB K. Hanke PS S. Gilardoni SPS B. Goddard Deputy M. Meddahi
3
LIU Project status RCS option studied and rejected. LIU project approved in the 24 th of august LMC. Official date for project start on 1 st of September 2011. TDR to be completed by the end of 2011. Startup of upgraded machines at the end of LS2 (2017?). Some budget codes already funded. WBS and WUs will soon be transferred in APT. 06/09/2011TE-EPC - Serge Pittet3 TEEPC
4
Provisional planning 06/09/2011TE-EPC - Serge Pittet4 TEEPC
5
Manpower request overview 06/09/2011TE-EPC - Serge Pittet5 TEEPC
6
LIU-PSB 5.2 - Booster MPS Civil engineering included. To be done in LS1 as far as possible. 06/09/2011TE-EPC - Serge Pittet6 TEEPC Provide Booster MPS Trims Holderkarsten.kahle@cern.ch Budget code99327 (not active yet) Budget700kCHF unit(s)3 DeadlineLS2 Provide Booster MPS Holderkarsten.kahle@cern.ch Budget code99327 (not active yet) Budget15MCHF unit(s)1 DeadlineLS2
7
POPS based Baseline 06/09/2011TE-EPC - Serge Pittet7 TEEPC Benefits Overall voltage available increases and would allow a reduction of the RMS current using a faster ramping. The capacitor bank totally absorbs the peak power on the 18kV network. Meyrin SVC would then become optional. Spare sharing between MPS A and B and eventually with POPS. Only a few new cables needed between the reference magnet (BCER) and the MPS. New B-field regulation to minimize eddy currents and saturation effects impact at higher current and acceleration rate. Drawbacks Cost estimation 14MCHF using POPS module. Reference magnet Ring 2&3 GND MPS B 2500V 5500A QFO 600V 450A QDE 600V 450A GND MPS A 2500V 5500A 64 BHZ Rings 1&4 128 QFO Rings 1,2,3&4 64 QDE Rings 1,2,3&4 64 BHZ Rings 2&3 Reference magnet Ring 1&4 Ring 1 B-filed measurement Ring 2 B-filed measurement
8
Layout of MPS new building 06/09/2011TE-EPC - Serge Pittet8 TEEPC New MPSB (2 GeV) (26m x 16m) TT6 420m 2 required, only 190m 2 available in bdg. 271 ground floor. Only 200kg/m 2 allowed in bdg. 271 first floor. No space left in bdg. 361. With this new building: We can install and commission during Booster operation. We have a backup power supply during the first years. Easy connection to existing cables and cooling services.
9
LIU-PSB 5.2 – ALG1&2 The linear stage can handle the new rated current. The capacitor bank size needs to be increased. 06/09/2011TE-EPC - Serge Pittet9 TEEPC Perform ALG1&2 upgrade Holderdavid.nisbet@cern.ch Budget code99327 (not active yet) Budget200kCHF unit(s)4 DeadlineLS2
10
LIU-PSB 5.2 - Mididiscaps Design and production from Linac 4 project. 06/09/2011TE-EPC - Serge Pittet10 TEEPC Provide Mididiscaps Holderdavid.nisbet@cern.ch Budget code99327 (not active yet) Budget50kCHF unit(s)5 DeadlineLS2
11
LIU-PSB 5.2 – Beam Transfer Optimization still need to be done: pulsing converters and keep existing magnets, BT.BHZ10 magnet design, 2GeV quadrupoles optic, reuse of some converters or spares 06/09/2011TE-EPC - Serge Pittet11 TEEPC Provide Transfer Bendings Holdergilles.le.godec@cern.ch Budget code99327 (not active yet) Budget3.2MCHF unit(s)About 13 (+15 for Isolde?) DeadlineLS2
12
LIU-PS 5 – CBE Specification under study with OP. ACAPULCO power design with FGC3 and RegFGC3. 06/09/2011TE-EPC - Serge Pittet12 TEEPC DHZ&DVT Power Converters Holderserge.pittet@cern.ch Budget code99263 PS Upgrade: Converters Budget560kCHF unit(s)75 DeadlineLS1 QN&QSK Power Converters Holderserge.pittet@cern.ch Budget code99263 PS Upgrade: Converters Budget740kCHF unit(s)85 DeadlineLS1
13
LIU-PS 5 – PI.SMH42 2 aimants en série R bobinage: 2·0.08mOhms 0.2 mOhms L aimant: 2·0.9uH 2uH Inom: 31kA Forme: Demi sinus+ 3 ème harmonique + filtre actif Largeur pulse demi sinus: 3ms 06/09/2011TE-EPC - Serge Pittet13 TEEPC Manufacture and commission PI.SMH42 Power Converter Holderdavid.nisbet@cern.ch Budget code99263 PS Upgrade: Converters Budget400kCHF unit(s)2 DeadlineLS2
14
LIU-PS 5 – PI.BSM42 R bobinage: 0.5 mOhms L aimant: 1uH Inom: 28kA Forme: Demi sinus + 3 ème harmonique + filtre actif Largeur pulse demi sinus: 0.8ms Temps de descente du courant: 0.4ms Pas de faisceau sur la portion de montée en courant. La descente en courant des 4 bumpers doit être aussi proche que possible. 06/09/2011TE-EPC - Serge Pittet14 TEEPC Manufacture and commission PI.BSM42 Power Converter Holderdavid.nisbet@cern.ch Budget code99263 PS Upgrade: Converters Budget300kCHF unit(s)2 DeadlineLS2
15
LIU-PS 5 – PI.BSM40, 43 & 44 R bobinage: 0.41 mOhms (20 tours) L aimant: 0.5mH Inom: 1.1kA Largeur pulse demi sinus: 0.8ms Temps de descente du courant: 0.4ms Le nombre de tour peut encore être modifié (Dominique.Bodart@cern.ch) Pas de faisceau sur la portion de montée en courant. La descente en courant des 4 bumpers doit être aussi proche que possible. 06/09/2011TE-EPC - Serge Pittet15 TEEPC Upgrade and commission PI.BSM40, 43 & 44 Power Converters Holderdavid.nisbet@cern.ch Budget code99263 PS Upgrade: Converters Budget360kCHF unit(s)4 DeadlineLS2
16
Related consolidation 06/09/2011TE-EPC - Serge Pittet16 TEEPC Some consolidation items which are essential for the LIU project have been pushed/advanced. They have not been transferred and stay in S.Baird project. statuscode 2011 kCHF 2012 kCHF 2013 kCHF 2014 kCHF 2015 kCHF 2016 kCHF started68215PS Main Ring started68217PS Gamma Transition started68251PSB Multipole/Dipole1692 Approv.EPC.04SVC Meyrin Filter647 Approv.EPC.03Canada, BI.QNO, BIX.QNO1118 Approv.EPC.05PS Septum 16 & 26527 Approv.EPC.16East area647 Approv.EPC.06TT23835
17
Organization Bi-weekly LIU PSB project meetings followed by linkman. Bi-weekly LIU PS project meetings followed by linkman. EPC LIU project meetings in January, May and September with a shot presentation by each WU holder. WU specific meetings when needed. 06/09/2011TE-EPC - Serge Pittet17 TEEPC
18
Documentation Detailed information still available on TE-EPC-LPC website: http://te-epc-lpc.web.cern.ch/te-epc-lpc/general.stm 06/09/2011TE-EPC - Serge Pittet18 TEEPC
19
LIU-PSB Work Units 06/09/2011TE-EPC - Serge Pittet19 TEEPC
20
LIU-PS Work Units 06/09/2011TE-EPC - Serge Pittet20 TEEPC