STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.

Similar presentations


Presentation on theme: "STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN."— Presentation transcript:

1 STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN

2 OrganizationOrganization Progress in 2011 Plan for 2012 and 2013 Plan beyond LS1 Resources Open issues

3 R.G. 3 LIU status - 6/03/2012 LIU-PSB coordination team K.Hanke – Activity leader B.Mikulec – Deputy V.Raginel – Scientific secretary https://espace.cern.ch /liu-project/liu-psb/ LIU- PS coordination team S.Gilardoni – Activity Leader H. Damerau– Deputy and Scientific secretary https://espace.cern.c h/liu-project/liu-ps/ LIU-SPS coordination team B.Goddard E.Shaposhnikova – Deputy G.Rumulo – Scientific secretary https://espace.cern.ch/ liu-project/liu- sps/default.aspx LIU-Project Safety coordination L. Ponce Director of Accelerators and technology - Steve Myers LIU Project team Roland Garoby (Project Leader) - Malika Meddahi (Deputy) - Brennan Goddard (LIU-SPS machine coordinator) - Simone Gilardoni (LIU-PS machine coordinator) - Klaus Hanke (LIU-PSB machine coordinator) - Maurizio Vretenar (Linac4 Project Leader)- Laurette Ponce (Project Safety Officer)-Django Manglunki (LIU-Ion chain coordinator) Linac4 Project M.Vretenar http://linac4- project.web.c ern.ch/linac4- project/ LIU Administrative Support: Cécile Noels. Project Support: Pierre Bonnal, Sylvain Weisz, Tadeusz Kurtyka - EVM coordinators: De Jonghe, Benoît Daudin Project Organization Breakdown Structure

4 Organization Progress in 2011Progress in 2011 Plan for 2012 and 2013 Plan beyond LS1 Resources Additional issues

5 R.G. 5 LIU status - 6/03/2012 Achievements in 2011 Formal organization of the LIU project: Nomination of additional members of the project team (Project Safety Officer and responsible for ions) Adjustment of project scope with transfer of activities from Linac4 (H - injection the PSB and all PSB-related tasks) and Consolidation Definition of Work Breakdown Structure, most of Work Units, budget codes and budget needs. Scientific/technical achievements: Analysis of injectors’ potential using MDs and simulations Refinement of the required actions on equipment (upgrades and replacement) with reviews (e-cloud, 160 MeV injection, beam instrumentation…) Workshop with HL-LHC project in view of converging on beam characteristics.

6 Organization Progress in 2011 Plan for 2012 and LS1Plan for 2012 and LS1 Plan beyond LS1 Resources Additional issues

7 R.G. 7 LIU status - 6/03/2012 Goals for 2012 and 2013 Scientific/technical goals: Analysis of injectors’ potential using MDs and simulations in view of stating the final project goals in agreement with HL-LHC at the end of 2012. Specification of actions on equipment (upgrades and replacement) with reviews (e-cloud, …) Publication of Design Report in 2013, Preparation of future upgrades during LS1.5(?) and LS2. Management goals: EVM follow-up of the PSB upgrade. Specification of cost to completion at the beginning of 2013. Start of EVM follow-up of PS and SPS upgrades in 2013.

8 R.G. 8 LIU status - 6/03/2012 Main work on the accelerators during LS1 PSB: Construction of H - injection equipment (magnets, pulsers, vacuum chambers and valves…) Cabling for H - injection equipment Replacement of beam dump and crane Preparation for new main power converter (new building) Upgrade of beam instrumentation (new orbit measurement system and devices for H - injection) New LLRF and prototype RF cavity PS: Radiation shielding on Road Goward and above septum 16 Finemet-based longitudinal damper New beam instrumentation (fast BLMs, study of IPMs) Design/order of power converters for low energy correctors SPS: Preparation for upgrade of 200 MHz RF system Installation of aC coated vacuum chambers in 2-4 half-cells Upgrade of transverse damper Installation of wide band transverse feedback Beam instrumentation (BFCT upgrade, BGI development, new diamond BLMs, prototype mechanics for new wire scanner) Cabling! Cabling of fibre optic backbone and one LSS + some coaxial cables!

9 Organization Progress in 2011 Plan for 2012 and 2013 Plan beyond LS1Plan beyond LS1 Resources Additional issues

10 R.G. 10 LIU status - 6/03/2012 Overall Plan Linac4PS injector, PS and SPSBeam characteristics at LHC injection 2011 - 2012 Continuation of construction… Beam studies § simulations Investigation of RCS option Hardware prototyping Test of new beam gymnastics Design § construction of equipment TDR 25 ns, 1.2 10 11 p/b, ~3 mm.mrad 50 ns, 1.7 10 11 p/b,  2 mm.mrad 2013 – 2014 (Long Shutdown 1) Linac4 beam commissioning Modifications and installation of some prototypes in PSB, PS and SPS Design § construction of equipment 2015 - 2017 Progressive increase of Linac4 beam current Implementation of new PS beam gymnastics… PSB modification and connection to Linac4 during extentended winter shutdown If/when Linac4 connected: progressive increase of PSB brightness with benefits for PS and SPS. Equipment design § construction for PSB, PS and SPS Beam studies Possibly smaller emittance (25 ns) with new PS beam gymnastics… Limited gain from Linac4 proper (pending PSB, PS and SPS hardware upgrades) 2018 (Long Shutdown 2) Extensive installations in PSB, PS and SPS Hardware commissioning 2019 –2021 Beam commissioningAfter ~1 year of operation: beam characteristics for HL-LHC…

11 Organization Progress in 2011 Plan for 2012 and 2013 Plan beyond LS1 ResourcesResources Additional issues

12 R.G. 12 LIU status - 6/03/2012 Material budget (kCHF) Comment: planning after 2014 to be redone after the update of the LTP (dates of LS2)

13 R.G. 13 LIU status - 6/03/2012 Staff (from APT on March 5, 2012) Comment: amounts in 2009 and 2010 + «bump» in 2013 result from inclusion in LIU of the PSB H - injection system and of miscellaneous consolidation items. 200920102011201220132014201520162017Grand Total BE PBU-PRJ 0.71.93.916.29.45.86.36.250.4 PSU-PRJ 0.71.24.33.93.03.1 19.1 SPU-PRJ1.52.86.19.417.914.712.214.113.692.2 IUM-PRJ 0.4 0.2 2.2 BE Total1.53.59.114.838.828.421.423.622.9163.8 EN PBU-PRJ 0.82.12.41.41.0 8.7 PSU-PRJ 0.10.40.60.40.2 1.8 SPU-PRJ0.30.70.92.03.73.30.6 12.0 EN Total0.30.71.84.56.75.11.8 22.5 TE PBU-PRJ6.27.67.08.613.411.013.012.62.681.8 PSU-PRJ 1.11.60.90.0 3.6 SPU-PRJ0.4 0.61.82.60.2 6.0 TE Total6.67.6 11.617.612.113.212.82.691.5 Grand Total8.311.718.530.863.045.636.438.125.5277.8

14 Organization Progress in 2011 Plan for 2012 and 2013 Plan beyond LS1 Resources Additional issuesAdditional issues

15 R.G. 15 LIU status - 6/03/2012 Additional issues (1/2) Will there be an LS1.5 at ~end of 2016? Very useful for (1) making use of the investment in Linac4, (2) reducing risk (stop of Linac2) and (3) minimizing workload and time/risks for commissioning after LS2 (staging of the upgrades) Necessitates resources for work on the PSB during LS1 and preparation of cabling with Linac4. Need for planning LS2: at least 12 months for hardware installation + n months for hardware and beam commissioning. => no beam from the injectors during ~18 months.

16 R.G. 16 LIU status - 6/03/2012 Additional issues (2/2) Letter of support to the DOE for continuation of the development by US-LARP of a wideband transverse sytem in the SPS. Organization of publications in the Accelerator Sector Present situation is not satisfying (no easy means to identify the publications on LIU at least) Little progress from my side (lack of time) except for a draft proposal prepared with Malika. Suggestion to put someone in charge from the Project Support Office for refining a proposal, proposing it to the ATSMB and following its implementation


Download ppt "STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN."