Download presentation
Presentation is loading. Please wait.
Published byCarmella French Modified over 7 years ago
1
What’s New in Primavera Gateway Session ID: 10750 John Pikovskiy – Director PGBU Strategy April 2016
3
Outline Primavera Gateway Conceptual Overview
What’s Planned for Primavera Gateway – this year and beyond What’s New in Primavera Gateway 16.1 Q/A
4
Primavera Gateway Standard data integration solution to streamline EPPM
Pre-packaged integration connections for variety of internal and 3rd Party applications Java application with no dependency on third party middleware provides extensible integration solution Combine financial management and asset management information with project, portfolio and resource management Simple integration framework allows customers and partners to quickly develop and adopt Primavera Gateway for integration
5
Pre-built Primavera Gateway Partner’s , Competitors
Integration Options Pre-built Primavera Gateway Partner’s , Competitors Custom WS / API SOA , ICS, Non-Oracle , Legacy 5
6
Integration Strategy Architectural Overview
Primavera Gateway Non Primavera Applications Public API / Custom Adapter Integration Synch Services Primavera EPPM Graphical User Interface Configuration; Role-based security; Ad-hoc synchronizations; Monitoring SAP Provider Integration Broker File (XML) Provider P6 Provider EBS Provider Compare Logging Sample Provider Unifier Provider Scheduling Audit VCP Provider “Prime” Provider Customizations ETrack Provider Partner Providers Industry-Specific Flows and Data Maps Routine Maintenance; Shutdown and turnaround; Capital Project 6
7
System Breakdown Technical Overview
Web Tier Business Tier Database Client Browser based (HTML, JQuery, Bootstrap, RequireJS) HTTP / HTTPS Primavera Gateway J2EE / Weblogic Integration Broker Java Interface definitions for providers, Canonical data model, Orchestration of flows, Job scheduling JDBC/ Java RMI SOAP – based Web Services EBS/VCP EBS Provider VCP Provider P6 Provider P6 JPA Eclipse link Oracle, SQL Server Oracle Oracle 7
8
Oracle Primavera Gateway
Insight Advanced UI options for meta data manipulation Extensibility of OOTB providers Efficiency Ability to copy flows, synchronizations and date mapping templates Import/export configuration between different environments Oracle Primavera Gateway Visibility Support for exporting Unifier Cost Type BPs (Change Management; Cost Management) Additional data for internal providers, including Prime, Unifier and P6 Cloud Cloud support for external providers UI for advance configuration / customization options Support for Oracle Integration Cloud Services (OICS) Collaboration File Provider: Support for comma separated file format and different XML schemas
9
Primavera Gateway Framework 16.1: What is new
March 2016 Support for shared file location FTP / SFTP support Follows Primavera Gateway canonical schema XML Provider Read-only flag in data dictionary OOTB Flows between EBS and Unifier to support Import EBS Resources into Unifier Roles; Bi-directional Project Header exchange; and ability to import EBS Project Tasks into Unifier CBS structure Usability Enhancements Flexible data mapping Advanced filtering conditions for data mapping templates Advanced Features
10
Provider Enhancements – XML (file) Provider
11
Provider Enhancements – XML (file) Provider cont.
12
Provider Enhancements – XML (file) Provider cont.
13
Provider Enhancements – XML (file) Provider cont.
14
Provider Enhancements – XML (file) Provider cont.
15
Provider Enhancements – XML (file) Provider cont.
16
Installer Updates – LDAP Configuration
17
Framework Improvements – Two Way Cross Ref in Customization XML
18
Usability Enhancements – Flexible Object Mapping
19
Usability Enhancements – Conditional Object Mapping
20
Primavera Providers for PG 16.1: What is new
March 2016 Support for project baseline SAML support Improvements to handle resource assignment dates Compatible with 16.1 release Primavera P6 Support for Project Create Support for Cost type BPs Primavera Unifier Bug fixes. Compatible with 16.1 release Oracle Primavera Prime Instantis EnterpriseTrack
21
Provider Enhancements – Baselines
22
Provider Enhancements – Baselines cont.
23
External Providers for PG 16.1: What is new
March 2016 Bug Fixes - creation of Work Centre and Material Assignment on operations in P6 to SAP flow Enhanced OOTB support with default flows and synchronizations Platform support - replaced deprecated API’s that are coming out of support SAP Security for SOA (https) ERP Project Filter (Class Category / Class Code and DFF) Multi Org Financial Periods from EBS to P6 Support for Milestone flag in import flow Ability to add new EBS Fields in Gateway UI User hooks feature at Site level on PL/SQL package for all the exposed objects EBS Bug fixes VCP
24
Oracle Confidential – Internal/Restricted/Highly Restricted
Primavera Gateway – Configuration setup By default one deployment will be available for each providers Customer can add ‘N’ number of deployments for each provider to sync the date with multiple instance EBS Connectivity through SOA web services, JDBC or RMI SOA web service with authentication type either as ‘Username Token” or “SAML Token” EBS Provider with secure connection (https) Oracle Confidential – Internal/Restricted/Highly Restricted
25
Oracle Confidential – Internal/Restricted/Highly Restricted
Primavera Gateway – Customization – Add new fields in Gateway UI Customization page helps to add a new EBS fields which is not exposed for the available objects. Oracle Confidential – Internal/Restricted/Highly Restricted
26
Oracle Confidential – Internal/Restricted/Highly Restricted
Primavera Gateway – Customization – Import/Export Users can Export or Import the Field Mapping Templates to easily configure in different instance using the following options, Export Field Mapping Templates Import Files and Field Mapping Templates Oracle Confidential – Internal/Restricted/Highly Restricted
27
Oracle Confidential – Internal/Restricted/Highly Restricted
Primavera Gateway – Business Flow setup Gateway supports the following business flow types, Master Data and Project Data Oracle Confidential – Internal/Restricted/Highly Restricted
28
Oracle Confidential – Internal/Restricted/Highly Restricted
Primavera Gateway – Customization – Add new field mapping template Customization page helps to create a new field mapping templates or to modify the existing field mapping templates for each objects for each providers using Field Mapping Templates. Oracle Confidential – Internal/Restricted/Highly Restricted
29
Oracle Confidential – Internal/Restricted/Highly Restricted
Project Data Sync – ERP Project Filter ERP Project Filter parameter supports to filter the project from EBS using, Project Number DFF Name DFF Value Class Category Class Code Oracle Confidential – Internal/Restricted/Highly Restricted
30
Oracle Confidential – Internal/Restricted/Highly Restricted
Project Data Sync – Project Plan EBS Project Plan parameter supports to sync the project structure, Work Plan and Financial Plan Oracle Confidential – Internal/Restricted/Highly Restricted
31
Oracle Confidential – Internal/Restricted/Highly Restricted
Project Data Sync – Plan Versions EBS Plan Versions parameter supports to sync the data from the following versions, Current Working Current Baselined Original Oracle Confidential – Internal/Restricted/Highly Restricted
32
Oracle Confidential – Internal/Restricted/Highly Restricted
Primavera Gateway – Synchronizations Synchronization page helps to run the business flows to interface the data between the applications. Synchronizations types: Manual (Run) / Run with Review Run on Event and Schedule (Recurrence) Oracle Confidential – Internal/Restricted/Highly Restricted
33
Oracle Confidential – Internal/Restricted/Highly Restricted
Primavera Gateway – Monitoring Monitoring page helps to check to see that it is working properly by finding the synchronization on the Monitoring page Oracle Confidential – Internal/Restricted/Highly Restricted
34
Q&A
35
Pre-built integrations in 16.1
Internal Unifier / P6 P6 / P6 Prime / P6 External SAP / P6 EBS / P6 VCP / P6 EBS / Etrack EBS / Unifier
36
P6 – P6 Global Data Flow Project Data Flow EPS Location
Financial Period Currency Expense Category WBS Category Baseline Type Calendar Cost Account Role Role Rate Resource Resource Rate Project Code / Type Resource Code / Type Activity Code / Type UDF Type Notebook Topic Resource Curve Resource Role Role Limit Unit Of Measure Project Data Flow Activity Activity Code / Type Activity Expense Activity Risk CBS Calendar Project and Project Baseline Project Resource Relationship Resource Resource Assignment Role WBS Risk Risk Matrix Risk Matrix Score Risk Matrix Threshold Risk Impact Risk Response Risk Response Action Risk Response Action Impact Risk Response Plan Risk Threshold Risk Threshold Level
37
P6 – Unifier Summary Sheet Supports 3 standard use cases:
Duration based schedules which will result in only dates being sent to Unifier. Resource based schedule that can be costed within Unifier in order to provide both the units, costs and dates. Cost based schedules that will provide units, costs and dates from P6. P6 Project summarized by CBS. Use of new Unifier Summary Sheets P6 project and up to 11 baselines Unifier Summary Sheets can be used as sources for the Cost Sheet, Cash Flow and Earned Value. Activity Sheet Unifier Enhancements: Activity Picker in Unifier New Shell Attributes Activity Form Attribute Activity Picker Log Project Filter Auto and Reverse Population to link Activity Sheet with any BP
38
EBS Projects – Unifier : Global Data Synchronization
One way only – EBS PRL to Unifier Roles PRL in Oracle EBS Roles in Unifier Yes Resource Master Data initiation is only from Oracle E-Business Suite Master / Global data includes Resources, Roles, Resource Rates, Role Rates, Expenditure Category and Financial Periods. Resource and Role Rates Currency Conversion based on System Date Create a Planning Resource Lists (PRL) and assign all type of resources such as People, Jobs, Equipment and Material Items. Global Resources in Oracle EBS synchronized to P6 EPPM Global Resource Catalog as – People as ‘Labor’, Jobs as ‘Roles’, Equipment as ‘Non-Labor’ and Material Items as ‘Material’ Global Resource and Role Rates in Oracle EBS synchronized to P6 EPPM Global Resource Catalog at Resource Price/Unit Multiple Rates synchronized for Resources to P6 EPPM and for Roles only the latest Rate synchronized Expense Categories initiated and assigned to the PRL in Oracle EBS and Resource Class as ‘Financial Elements’ Financial Elements (Expense Categories) in Oracle EBS synchronized to P6 EPPM Enterprise Data as ‘Expense Category’ PA Periods initiated in Oracle EBS PA Periods in Oracle EBS synchronized to P6 EPPM Enterprise Data as ‘Financial Periods’ No
39
EBS Projects – Unifier : Project Header
Project initiated in EBS and synch to Unifier or visa versa; Yes Project initiated in EBS and synch to P6 EPPM ; Leaf Level Task in EBS as Activity in P6 EPPM ; Resource Assignments at Leaf level task in EBS as Resource Assignments at Activity level in P6 EPPM ; Dependencies between leaf level task in EBS as Dependencies between Activities in P6 EPPM; Primary Resource in P6 EPPM as Task Manager in EBS Yes
40
EBS Projects – Unifier : Project Structure Synchronization
One way only – EBS non-leaf tasks to Unifier CBS Yes Project initiated in EBS and synch to P6 EPPM ; Leaf Level Task in EBS as Activity in P6 EPPM ; Resource Assignments at Leaf level task in EBS as Resource Assignments at Activity level in P6 EPPM ; Dependencies between leaf level task in EBS as Dependencies between Activities in P6 EPPM; Primary Resource in P6 EPPM as Task Manager in EBS No
41
EBS – P6: EBS Projects Overview
Major use-cases: High-level Scope Outline 1. EBS to P6 : Synch Global Data 2. EBS to P6 : Project , High Level WBS and Budget Creation 3. P6 to EBS : Detailed Work Plan and Activity level resource assignments 4. EBS to P6 : Summarized Resource Assignments 5. EBS to P6 : Budget Updates 6. P6 to EBS : Progress at Summarized Resource or Task Level 7. EBS to P6 : Actual Cost Updates EBS owns the financial aspects of all projects. Project execution occurs in P6.
42
VCP ASCP Overview Major use-cases: High-level Scope Outline
1. VCP to P6 : “Supply” flow: bring BOM with planned delivery dates 2. P6 to VCP : “Demand” flow: send material requirements to VCP for production planning
43
SAP - P6 : Asset Management
Oracle Primavera
44
SAP - P6 : Project Management
Oracle Primavera
45
Supported Versions and Platforms
Primavera Gateway 16.1 OS Software Comments Database Oracle Linux 7.x x64 Oracle 11g R2 v4 Oracle 12c R1 v2 Oracle Linux 6.7 x64 MS Win 2012 R2 x64 Solaris SPARC 11 x 64 Application Oracle Weblogic 12c (12.1.3) Sun JDK Client MS Win 7 SP1 x32,x64, MS Win 8.1 x32, x64 MS Win 10 Mac OSX (El Capitan) Any platform running supported browser IE11 Supported Languages: English, German, French, Simpl. Chinese, Japanese, Russian, Spanish, Trad. Chinese, Brazilian Portuguese, Italian, Korean, Dutch Chrome 45+ Firefox 38.x+ Safari 9.x Edge Authentication LDAP:OID 11g( and ), ODS 11g, AD 2012R2, OUD 11g ( ) SSO: OAM 11g R2 ( and ), OIF 11g ( and ), ODS 11g
46
Supported Versions and Platforms
Applications Primavera P6 EPPM 16.1 Requires adapter for Web Services SAP ECC 6.0+ ; All Enhancement Packs up to version 7 Oracle Primavera Prime 16.1 EnterpriseTrack 15.2 Oracle E-Business Suite PM 12.x; Requires custom adapter(available as part of EBS Provider package) to be deployed to EBS instance. Oracle Value-Chain Planning ; Latest Patch Unifier
47
Q&A
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.