Presentation is loading. Please wait.

Presentation is loading. Please wait.

An early success story of people for the people

Similar presentations


Presentation on theme: "An early success story of people for the people"— Presentation transcript:

1 An early success story of people for the people
Intercommunity Development Association I.D.A Molivisu An early success story of people for the people

2 Owner: I.D.A. Molivisu Partner: Energy Services Group
PROJECT: CREATION OF GENERAL AND SPECIFIC INFRASTRUCTURE FOR TOURISM ACTIVITIES IN THE CLIMATE AREA GHITU-MOLIVISU, AREFU VILLAGE, ARGES COUNTY Owner: I.D.A. Molivisu Partner: Energy Services Group No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/ ,

3 Who may be interested Avid nature lovers who dream of a landscape of stunning beauty : Molivisu sunny glade surrounded by imposing massive Ghitu Ghitu Peak area 30,4 ha Molivisu Glade Area 62,5 ha Ghitu Peak area 365 ha No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/ 3

4 WHAT CAN BE INTERESTING
Of the two contrasting “mountain-glade”, has emerged the idea of a resort: Molivisu Resort No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/

5 Future Resort Molivisu
It will be located at 167 km from Bucharest and only 67 km from Pitesti Arefu village development strategy aims to transform Ghitu sight in a tourist resort of national interest, in accordance with EU standards and placed on thematic tours. The Urban Area Plan have been the foundation for implementing the tourism infrastructure of the future resort. Development zones (A, B, C, D, E, F, H), due to the infrastructure of tourism, will be the result of the current infrastructure project implementation. No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/

6 The proposed project: Creation of general and specific infrastructure for tourism activities in the climate area Ghitu-Molivisu, Arefu Village, Arges county Specific objectives: Development of infrastructure and utilities: water, sewer, electricity, road Creating and camping equipment platforms, including specific utilities (toilets, running water, lighting, garbage collection points) Construction of swimming pools, beaches, pools Sports building Ski slope construction Construction / development practice runs for other winter sports Building cycling tracks No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/

7 Objectives that will form the basic infrastructure of the resort Molivisu
Ski slope A1 Features: Length 1048,62 m Degree of difficulty - Medium Equipment: air lifts, artificial snow production equipment the car to beat the snow, night lighting installation No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/

8 Ski slope A2 Features:: Length 342,67 m Degree of difficulty– low
Equipment: treadmill, installation of night lighting No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/

9 Recreational infrastructure on the A1 bottom area ski slope
Features: Pool Multi Sport Field Children Playground Pavilion for the arts Campground Access paths No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/

10 Planning for inprovment the natural deposit of peat land for valorification in tourist purpose (Molivişu Peat) Features: alley access for visitors recreation location ecologic al ornamental lighting No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/

11 TOURISTIC OBSERVATORY
Features: built area = 154 sqm area held = 462 sqm sniper central equipment placed under glass pavilion situated on the 2nd floor rear windows on the perimeter of the building shooting and projection rooms shooting exhibition space elevators, toilets No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040)21/

12 Recovery of tourist resources in renewable energy - SHP(small hydropower plant)
Number of small hydro-power plant– 3 Number of micro hydro units– 7 Installed power– 47,5 kW estimated annual energy production– 214 MWh

13 Infrastructure and utilities
Development of 6 km length communal road, with 6 m width of the carriageway, pavement and cycling track Drinking water network of 12 km in length, with five households of water (catchment, treatment, pumping) Implementation of sewerage network in the length of 17 km, with five treatment plants Grid achievement length 9.24 km, 11 stations in different power transformer to provide electricity to all areas of development No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040)21/

14 Project indicators Estimated value of investment : lei/ euro Land area occupied by the project : 44 ha Estimated annual income : lei No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040)21/ 14

15 INDICATORS on investment objects
Investment objects Investment value [lei] 1 Ski slope medium difficulty 2 Ski slope low difficulty 3 Touristic observatory in Ghiţu Peak 4 Recreational infrastructure including associated utilities on the bottom area ski slope 5 Planning for improvement the natural deposit of peat land for valorification in tourist purpose in Molivisu Glade 6 Recovery of tourist resources in renewable energy 7 Communal road 8 Electric distribution networks for electricity supply 9 Capture, treatment and distribution plant for potable water 10 Wastewater sewer system Total No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040)21/


Download ppt "An early success story of people for the people"

Similar presentations


Ads by Google