SR 417 Extension Sketch-Level Traffic & Revenue Evaluation

Similar presentations


Presentation on theme: "SR 417 Extension Sketch-Level Traffic & Revenue Evaluation"— Presentation transcript:

1 SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
Florida Department of TRANSPORTATION SR 417 Extension Sketch-Level Traffic & Revenue Evaluation August 26, 2015

2 Sketch-Level T&R Evaluation
Update to 2003 Study Higher-Level, Conceptual Effort Using Existing Data and Inputs Evaluate Key Inputs What Has Changed Over Past 12 Years? Impact on Traffic? Impact on Revenue? Identify New Alternatives for Consideration Update Project Costs Reassess Revenue/Cost Differential Florida Department of Transportation

3 Project Overview Extension of SR 417 in Seminole County to I-95 in Southeast Volusia County New, Four-Lane, Limited-Access Toll Facility Approximately 30 Miles Long Alternative for Trips from Volusia to Orlando Includes New St. Johns River Crossing Crosses Environmentally Sensitive Areas Florida Department of Transportation

4 Study Area Florida Department of Transportation

5 Corridor Alternative 1 Florida Department of Transportation

6 Corridor Alternative 2 Florida Department of Transportation

7 Corridor Alternative 3 Florida Department of Transportation

8 2003 T&R Study Results Florida Department of Transportation

9 2003 T&R Study Results 2003 T&R Study Conclusion: Project shortfall of $620 to $780 million Florida Department of Transportation

10 Sketch-Level T&R Update
Population Data Network Access Locations Developments within Study Area New Opening Year (2025) Updated Project Costs Florida Department of Transportation

11 Population Data - Comparison
County 2003 BEBR Medium Population Estimate 2015 BEBR (PS 171) Medium Population Estimate % Change in Population Estimate 2010 2030 2010* Volusia 515,100 645,200 494,593 563,900 -4.0% -12.6% Brevard 551,300 685,800 543,376 631,100 -1.4% -8.0% Seminole 450,300 598,700 422,718 522,300 -6.1% -12.8% Total 1,518,710 1,931,730 1,462,697 1,719,330 -3.7% -11.0% *2010 Census Population Florida Department of Transportation

12 Network SR 415 SR 44 I - 4 I – 95 Lake Mary Blvd
2-Lanes 4-Lanes Florida Department of Transportation

13 Network - SR 415 Historical Traffic
Florida Department of Transportation

14 Access Locations 2003 Study Access Additional Access I-95 I-95
Maytown Rd Maytown Rd SR 46 SR 46 Lake Mary Blvd / International Airport Lake Mary Blvd / International Airport SR 417 SR 417 New Access Florida Department of Transportation

15 Developments within the Study Area
Restoration DRI 8,500 Residential Units 3,825 SF Units 4,675 MF Units 3,300,000 Non-Residential Square footage 1,904,442 sq ft. Office 1,395,557 sq ft. Retail 74% of total land area (3,872 ac.) planned for conservation Farmton MDRI 23,100 Residential Units : 4,692 Units : 18,408 Units 4,700,000 Non-Residential Square footage : ,217 sq. ft. : 4,700,000 sq. ft. RESTORATION FARMTON Access Locations Florida Department of Transportation

16 Net Present Value (NPV) in $Millions
Base Case Same Toll Rate Same Access Points Updated Land Use and Model Network 2025 Opening vs Opening Year Indexed Toll Rates vs. Toll Increases Every 10 Years Alternatives Net Present Value (NPV) in $Millions 2003 T&R Study $196 M 2015 Sketch-Level T&R Evaluation $260 M Change From 2003 Study +$64 M (+32%) Florida Department of Transportation

17 Net Present Value (NPV) in $Millions
2015 Study Build Alternatives Alternatives (Higher Toll Rate) Net Present Value (NPV) in $Millions Change from 2003 NPV $196 M Same Access Locations as 2003 Study $364 M + 85% Additional Access Locations At SR 46 and Lake Mary Blvd $402 M + 105 % Higher Land Use Related to Restoration and Farmton $497 M + 153 % Florida Department of Transportation

18 Updated Project Costs Corridor 1 $887 M $1.5 B + 69% Corridor 2 $851 M
Change in Cost Corridor 1 $887 M $1.5 B + 69% Corridor 2 $851 M $1.4 B + 65% Corridor 3 $824 M $1.3 B + 58% *Project unit costs were updated, however, ROW and mitigation costs were not updated in this effort. Additional costs related with the addition of new access points was not included in the cost estimates. Florida Department of Transportation

19 Revenue/Cost Differential
Alternatives NPV Cost* Difference in Millions Base Case $260 $1,300 -$1,040 Higher Toll Rate Access $364 -$936 Higher Toll Rate - Additional Access $402 -$898 Higher Toll Rate - Higher Land Use $497 -$803 *Costs shown for Corridor #3 and do not include updates to ROW and Mitigation, or the cost for the additional access points. Florida Department of Transportation

20 Conclusion Project Assumptions Evaluated and Updated
Additional Alternatives with a Higher Toll Rate Additional Access Higher Land Use from Developments Updated Project Costs R/W and Mitigation Costs Still Need to be Updated Project Still Has Significant Shortfall ($803 M to $936 M) Florida Department of Transportation

21 Conclusion QUESTIONS? Florida Department of Transportation