Presentation is loading. Please wait.

Presentation is loading. Please wait.

Fiberglass Tank & Pipe Institute Presentation

Similar presentations


Presentation on theme: "Fiberglass Tank & Pipe Institute Presentation"— Presentation transcript:

1 Fiberglass Tank & Pipe Institute Presentation
Tank& Sump installation Session 2017 ASTSWMO May Meeting (May 23-25, 2017)

2 Introductions Greg Cirangle— Xerxes
Todd Bogenrief— Containment Solutions

3

4 Agenda Fiberglass Tank & Pipe Institute Overview
Installation Material & Training Tanks / Sumps: Instruction Manuals Critical Steps in the Installation Checklist Variance Approvals Training Programs Documentation Required Local Installation Seminars for Regulators Questions

5 Fiberglass Tank & Pipe Institute Mission Statement
The Institute's Mission is to provide a forum through which the fiberglass reinforced thermoset plastic ("RTP") industry can work together effectively toward the common goal of advancing the use of certain fiberglass products substantially used in the underground tank and piping marketplace, coordinate market studies, gather statistics and combine talents and resources to provide standard-setting organizations with superior technical data and disseminate information to the government, industry and the public. Sully Curran P.E. Executive Director 14323 Heatherfield Houston, Texas

6 Member Companies Xerxes Corporation Containment Solutions
7901 Xerxes Avenue South 333 N Rivershire Dr., Ste 190 Minneapolis, MN 55431 Conroe, TX 77304 Phone: Phone: Fax: Fax: NOV Fiber Glass Systems 17115 San Pedro Ave., Ste 200 San Antonio, TX L. F. Manufacturing Hobas Pipe USA 1413 E. Richey Road Houston, TX Phone: Fax: PO Box 578 Giddings, Texas 78942 Phone: Fax:

7 Associate Member Companies
Interplastic Corporation 421 West 67th Street Kansas City, MO Olin Corporation 1510 Eldridge Parkway Houston, TX PPG Industries 400 Guys Run Rd. Cheswick, PA Composite Polymers, Ashland Inc Blazer Parkway Dublin, OH AOC LLC 955 Highway 57 Collierville, TN 38017

8 Third Party Standards Petroleum (Tanks) UL 1316 UL Subject 2215
Petroleum (Pipe) UL 971 Water/Wastewater (Tanks) AWWA NFPA IAPMO NSF Water/Wastewater (Pipe) AWWA Factory Mutual (FM) NFPA

9 FTPI Standards Only a limited number of tank and piping manufacturers are equipped to meet recognized fabrication standards for design and construction. This list is further reduced to those manufacturers who have established Quality Control and Quality Assurance programs for their manufacturing facility, fabrication process and end product. FTPI RP Fiberglass Reinforced Thermoset Plastic Tank & Piping Standards FTPI RP Recommended Practice for the In-service Inspections of Aboveground Atmospheric Fiberglass Reinforced Plastic (FRP) Tanks and Vessels© FTPI RP Field Test Protocol for Testing the Annular Space Of Installed Underground Fiberglass Double and Triple-Wall Tanks With Dry Annular Space FTPI RP T-95-1 Remanufacturing of Fiberglass Reinforced Plastic (FRP) Underground Storage Tanks

10 White Papers General Piping
Review: Laboratory and Field Studies on the Cause of Accelerated MIC Corrosion in Petroleum and Municipal Storage Tank and Piping Systems Ethanol Compatibility with Fiberglass UST Systems Fiberglass Reinforced Thermoset Plastic Tank & Piping Standards Fiberglass Tank & Piping Fundamentals Microbial Influenced Corrosion (MIC) of Metals & Alloys in Fuel & Municipal Storage Tank and Piping Systems Static Ignition Hazards When Handling Petroleum Products Tanks Overfill Prevention of Petroleum Underground Storage Tanks Ball Float Valves & Adverse Unintended Consequences Fiberglass Underground Petroleum Storage Tanks & Piping 50+ Year History Fiberglass Underground Storage Tank Success In the USA   UST Deflection and Striker Plates Past and Present Piping Fiberglass Pipe Past, Present and Future Fire Resistant Fiberglass Pipe Piping Flow Rate Design for Retail Refueling Facilities White Papers

11 Fiberglass Tanks Installation Material & Training

12 Installation Material & Training
For Tanks Manuals, Shipping Packets & Labels Critical Steps in the Installation Checklist Variance Approvals Training Programs Documentation Required

13 Tank Labels UL 1316 requires that the Installation Instructions be laminated to each tank Various other labels and stencils are added to encourage safe practices and direct contractors throughout installation

14 Shipping Packet / Important Papers
Insert Photo of Xerxes Shipping Packet

15 FRP Tank Installation Instructions
Insert Xerxes Instructions

16 Tank Installation Checklist
Is included in the installation instructions Summarizes critical steps Should be filled out for each tank project Must be retained by the tank owner and provided to Mfr. to validate any future warranty claims.

17 Approved Variance Letter
Month XX, XXXX Mr. Joe Smith P.O. Box XXXXXX W. Tank Rd., TX XXXXX XXX-XXX-XXXX Reference: Installation Variance Approval Sue’s Marina 8’-8000 DWT dwg - Backfill Bed Variance Dear Joe, You have requested an installation variance on the backfill bed to be used under the 8’-8000 DW tank being installed at the above referenced project. The site conditions for the installation are limiting the amount of backfill bed required under the tank. You have requested that the backfill bed be reduced from 12 inches listed in our installation instructions, to 10 inches. Based on the information provided to CSI on XX/XX/XXXX this backfill bed variance is approved by Containment Solutions for the above referenced project. Please insure that the backfill bed does measure a minimum of 10 inches. et al...

18 Installation Contractor Training
Classroom / Online training conducted every 2 years Review All Key Installation Procedures via video and power point at Xerxes.com & Containmentsolutions.com Planning for Installation Handling Tanks Pre-Installation Inspection Testing During Installation Installing Tanks Post Installation Testing Piping, Venting and Containment Sumps

19 Installation Contractor Training
Written Contractor Exam Contractor Documentation Installing Contractor Must follow: Installation Guidelines Complete Installation Checklist and provide copy to tank owner

20 Contractor Training Kit

21 Contractor Training Exam

22 Confirmation of Training

23 Company Acknowledgment of Training

24 Company Acknowledgment of Training

25 Contractor Wallet Card
Front Back

26 Contractor Wallet Card
Front Back

27 Local Training for Regulators
We encourage you to use our industry resources to improve your staff’s practical tank & pipe installation skills Training seminars provided on a local basis Typically 2-3 hour time commitment Certificate of participation provided with completion of post seminar test. Use member companies Web Sites for local representative contact information.

28 Thank you Questions ?


Download ppt "Fiberglass Tank & Pipe Institute Presentation"

Similar presentations


Ads by Google