Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Welcome to our Design Consultancy, Project & Construction Site Management Profile F INISHED R ESULT L TD. Celer et Certus.

Similar presentations


Presentation on theme: "1 Welcome to our Design Consultancy, Project & Construction Site Management Profile F INISHED R ESULT L TD. Celer et Certus."— Presentation transcript:

1 1 Welcome to our Design Consultancy, Project & Construction Site Management Profile F INISHED R ESULT L TD. Celer et Certus

2 CONTENTS Page  Client’s Logo 03  Introduction 04-05  Project References06-09  Project Photographs 10-127  Inspection128-132  Project Control Procedures 133  Contact Details 134 2 F INISHED R ESULT L TD. Celer et Certus

3 3 AMANDA FOODS (VN) CLIENT’s LOGO F INISHED R ESULT L TD. Celer et Certus

4 Safety - Quality - Efficiency 4 Since the commencement of Vietnam’s “Open Door” policy, many private companies have sprung up to service the Construction Industry. This has created problems for overseas investors who have difficulty in assessing the competence of companies which have had a short operational life in comparison with western standards. In many cases the standards of local companies have fallen well short of investors expectations, particularly in the field of construction. Finished Result Ltd, since the companies inception in 1994, has pursued a vigorous policy of working to the highest standards and ensuring those companies under our control fulfill their Contracted obligations. This policy has resulted in our company being chosen as the Construction Managers for Allied Domecq (3 times), Swire Cold Storage (4 times), Amanda Sea Foods (2 times), Bitexco (2 times), Olam VN (6 times): Coffee (2 times), Cashew nut (2 times), Spices(2 times). Introduction F INISHED R ESULT L TD. Celer et Certus

5 Safety - Quality - Efficiency 5 Finished Result Management teams, depending upon the needs of the Project, are made up of International and locally recruited Engineers. A balance is maintained between youthful dynamism, seasoned talent and expertise in the local market. Local expertise is a vital factor in the Management of the Project and has resulted in FRC saving Clients millions of recorded and documented US Dollars. Due to the competence of our Management teams, fees and construction costs on all contracts have been kept within budget and nearly a 100% record for completion on schedule. The honest and straight forward way we work with our clients has helped earn our company repeat orders. This mainly pictorial Presentation will give some idea of our Companies projects in Vietnam. F INISHED R ESULT L TD. Celer et Certus

6 Project & Construction Management Services Project ClientDetails Project value (USD) Year Completed Allied Domecq Ho Chi Minh City 3,500m 2 Wines & Spirits production & bottling facility Designed and Project Managed 2,000,000 1995 Allied Domecq Ninh Thuan Province 3,500m 2 Winery complete with Rotary Fermenter and Production Bottling facility Designed and Project Managed 1,500,000 1996 Allied Domecq China 6,500m 2 Wines & Spirits manufacture with Production Bottling facility Designed and Project Managed 6,000,000 1996 Nidec Tosok Ho Chi Minh City 10,000m 2 Computer Components Production Facility complete with Clean Room Planned and Construction Managed 6,000,000 1998 Unilever - Cu Chi - Vietnam Song Than 1 IP, Binh Duong Province 2,500m 2 Tea Blending Factory Planned and Construction Managed 1,200,000 1999 Proctor & Gamble Song Than 1 IP, Binh Duong Province 2,000,000 Liter Water Storage Tank Construction Managed 1,000,000 1999 6 Celer et Certus

7 Project & Construction Management Services (cont.) Project ClientDetails Project value (USD) Year Completed Swire Cold Storage - Stage 02 Song Than 1 IP, Binh Duong Province 3,500m 2 Cold Storage facility -25 o Centigrade Construction Managed 1,800,000 2000 Foster's Tien Giang Ltd. My Tho IZ, Tien Giang Province Anaerobic Waste Water Treatment Facility Construction Managed 650,000 2001 Swire Cold Storage - Stage 03 Song Than 1 IZ, Binh Duong Province 3,500m 2 Cold Storage facility -25 o Centigrade Construction Managed 2,800,000 2002 Bitexco Office Building Ho Chi Minh City 20 Storey 5 Star Office Complex Construction Managed 6,000,000 2003 Amanda Foods (Vietnam) Ltd. - Stage 01 Bien Hoa IZ, Dong Nai Province, VN 8,000m 2 Sea Food Preparation & -25 o Centigrade Cold Storage facility Construction Managed 7,000,000 2003 Amanda Foods (Vietnam) Ltd. - Stage 02 Bien Hoa IZ, Dong Nai Province, VN 2,200m 2 Sea Food Preparation & -25 o Centigrade Cold Storage facility Construction Managed 1,000,000 2004 7 Celer et Certus

8 Project & Construction Management Services (cont.) Project ClientDetails Project value (USD) Year Completed White Sand Resort Phan Thiet, Binh Thuan 2 Hectare, 4 Star Resort Complex with Restaurant, Gym, Jacuzzi, Sauna, Steam bath, Swimming Pool & Spa etc..., Project and Construction Management 1,000,0002004 Swire Cold Storage - Stage 04 Song Than 1 IP, Binh Duong Prov. 3,500m 2 Cold Storage facility -25 o Centigrade - Project and Construction Management 2,000,0002005 Bitexco Office Building District 1, Ho Chi Minh City 45 million Dollar 30 storey 5 Star Office, Shopping Mall and Apartment Complex Construction Managed 35,000,0002005 Swire Cold Storage - Stage 05 Song Than 1 IP, Binh Duong Prov. 7,500m 2 Cold Storage facility -25 o Centigrade - Project and Construction Management. 10,000,0002007 White Sand Resort Phan Thiet, Binh Thuan 1 st Sea Wall in Vietnam - Project and Construction Management 150,0002007 Huyck.Wangner - Vietnam My Phuoc 1 IP, Binh Duong Prov. 18,000m 2 Floor Area of Factory & Office - Specialize in producing paper machine clothing - Project and Construction Management 8,000,0002009 Antara Vietnam Co Ltd. Nguyen Van Quy Str., District 7, HCMC 22,000m 2 Cold Storage facility -25 o Centigrade - Project and Construction Management 30,000,0002010 8 Celer et Certus

9 Project & Construction Management Services (cont.) Project ClientDetails Project value (USD) Year Completed International School District 2, HCMC Administration Building - Project and Construction Management 700,0002009 Olam - Cafe Outspan Vietnam - Phase 01, KCN Nhut Chanh, Long An “State of the Art Freeze Dried Coffee Manufacturing Plant” : 40,000,000 2009 - Cold Storage minus 30 0 C and Cold Chambers minus 50 0 C - Stainless Steel Platform 20m high - Electrical Network and CIP System - Civil and Structural Project - Stainless Steel Tanks 36 total. Utility Pipework. - Spent Ground Silo and Conveyor 12,000,000 Olam Vietnam-Cashew Nut Bien Hoa II IZ, Dong Nai 15,600 m 2 Loose kernel processing 2,200,000 2010 Fabrication Technology Tan Uyen, Binh Duong Province 10,800 m 2 Producing, processing metal work product for Construction, Architect & mould mechanical product - Project and Construction Management 2,000,0002011 SATRA Cold Storage Binh Dien Trading Center D.8, HCMC 11,300 m 2 Cold Storage facility -25 0 Centigrade - Project and Construction Management 14,000,0002013 9 Celer et Certus

10 Project & Construction Management Services (cont.) Project ClientDetails Project value (USD) Year Completed Olam - Cafe Outspan Vietnam - Phase 02, KCN Nhut Chanh, Long An Expansion of Coffee processing factory from 4,000 tons to 12,000 tons per year with New Roaster, Spray Dryer, Freeze Dryer and its Utility system -Project and Construction management for civil and M&E work (Spray dryer tower, Warehouse, WWTP, Boiler, Utility area) - Process MEP installation management 38,000,0002012 Olam Vietnam- Spice factory – Long Binh IZ, Dong Nai Renovation and expansion of 25,000m2 Spice factory. Project and construction management for Civil, structure, MEP and machinery installation 5,000,000 2013 Olam Vietnam – Song May coffee warehouse – Song May IP – Dong Nai Design, Project and construction management for concrete yard, pump house, water tank and the fire protection& alarm system 500,0002012 Dao Heuang Coffee – Pakse- Laos PDR Project and construction management for -50oC Freeze Dryer cold chamber insulation panel installation 300,0002012 V.A.P - Moc Hoa, Long An -102,000 m2 Parboiled rice milling plant: Project and Construction management - Office building and staff quarter: Design Consultancy 15,000,000 To be Completed in 2013 SATRA Trading Center Extension Project – Stage 2A Project and construction management for: - 20,000 m2 Vegetable Market. - 2,000 m Asphalt Road - 2,000m2 Flower Market 12,000,000 To be complete in 2014 10 Celer et Certus

11 PROJECT Photographs 11 F INISHED R ESULT L TD. Celer et Certus

12 12 Allied Domecp – Binh Tay Co. Ltd. Wines & Spirits preparation and bottling facility Production & Office areas : 3,500 m 2 To the right is the original building prior to redesign by Finished Result Ltd.

13 13 Existing building to the left and redesign by FRC below Wall coatings were chosen for durability and protection in this Tropical Climate Allied Domecp – Binh Tay Co. Ltd.

14 14 Interior of building during ‘strip out’ or ‘gutting’ phase Project Management Team Left to right D. Evans - Process Engineer Clive Webb - Project Manager S. Robinson Civil Engineer Valerie Secretary Allied Domecp – Binh Tay Co. Ltd.

15 15 Ninh Thuan Province Vietnam Architectural design by FRC Allied Domecp – Winery

16 16 Notice the attention to detail in all aspects of the finishing works, all as designed by Finished Result Ltd. The bas-relief arches are representative of the local Cham Towers. Allied Domecp – Winery

17 17 Above is an example of ‘opportunistic’ construction, the Tarmacadam road specified was replaced with locally produced granite ‘setts’, much cheaper, easy to repair and of course practically everlasting. Allied Domecp – Winery

18 18 Insulated fermentation vessels Allied Domecp – Winery

19 19 From the foregoing photographs it can be seen that factories can be made attractive with a few small inexpensive designs and good colour schemes Allied Domecp – Winery

20 20 Factory for the manufacture of computer components complete with very high grade ‘clean room’ and sophisticated air control system. NIDEC TOSOK (Vietnam)

21 21 Construction Planned & Programmed by C. Webb NIDEC TOSOK (Vietnam)

22 22 International standard clean room NIDEC TOSOK (Vietnam)

23 23 Programmed and Construction managed by FRC Tea Blending Factory at Cu Chi

24 24 Pergola to the right for enjoyment of the staff Tea Blending Factory at Cu Chi

25 25 Internal doors

26 Procter & Gamble 26 To the right an internal view of the reinforced concrete water storage tank To the left an external view of the Water storage Tank

27 Procter & Gamble 27 Water storage facility under construction showing scaffolding support system for the concrete form work and walkways Clive Webb above conducting an inspection

28 Procter & Gamble 28 Stainless steel man access hatch viewed from inside the water tank

29 Swire Cold Storage VN – Stage 02 29 Hawkins Construction the Main Contractors and CM requested the assistance of Finished Result to get this Project ‘back on track’, this was eventually achieved. Local knowledge is imperative for working in Vietnam View of the completed Stage 02 facility at SCS. From left to right Clive Webb-Construction Manager Neil Martin-Project Manager Mr. Nghia-Director of Tan Viet Tin the Main Contractor

30 Swire Cold Storage VN – Stage 02 30 Above is a view of a ‘Penthouse’

31 Foster’s Tien Giang - WWTP 31 Pile Driving Rig & Reinforced Concrete Piles to the left Pile Driving in Operation to the right using a diesel percussion driver

32 Foster’s Tien Giang - WWTP 32 Pile Testing in Operation to the right to ensure load bearing is sufficient to support the Facility Pile Testing Rig being erected to the left

33 Foster’s Tien Giang - WWTP 33 To the left, steel reinforcing bar being installed for the concrete base To the right steel reinforcing bar being tied in position ready for installation of the formwork and subsequent placement of the pumped ready mixed concrete

34 Steel ‘R’ bar and formwork being erected for reinforced concrete walls of the WWTP 34 Foster’s Tien Giang - WWTP

35 35 Foster’s Tien Giang - WWTP Fully automated primary waste water treatment ; anaerobic stage

36 Foster’s Tien Giang Anaerobic Waste Water Treatment Plant 36 View shows plant room at ground level and Control room at first landing of the Galvanized stairway which also accesses the top of the Waste Water Treatment Plant

37 Foster’s Tien Giang Anaerobic Waste Water Treatment Plant 37 Overview

38 Swire Cold Storage VN – Stage 03 38 To the left can be seen ‘R’ bar being installed for the concrete slab Mounting steel frame on Stage 02 to increase the height of Stage 03 Cold Storage

39 Swire Cold Storage VN – Stage 03 39 Installing the insulation panel walls of the Cold store rooms

40 Swire Cold Storage VN – Stage 03 40 Above are cold room insulation panels being prepared for installation To the right is the completed gable end of Stage 03

41 BITEXCO Office Building – Ho Chi Minh City 41 Completed facade of profiled glass and Italian marble cladding

42 BITEXCO Office Building – Ho Chi Minh City 42 This Project was 6 months into Construction when Finished Result was called in to get the project ‘back on track’ this was no easy task but it was eventually accomplished Completed concrete structure of the office building with construction Hoist still in position, this is prior to ‘fitting out’ operations

43 Amanda Foods (Vietnam) Ltd. – Stage 1 43 ‘Cúng tế’ to the right ‘Lễ Khởi Công’ Ground Breaking Ceremony preparations underway

44 Amanda Foods (Vietnam) Ltd. – Stage 1 44 Plastic ‘curing’ sheets in position after placement of concrete bases Concrete Boom pumps in operation to the left

45 Amanda Foods (Vietnam) Ltd. – Stage 1 45 Installation of plastic ‘Vent’ pipes

46 Amanda Foods (Vietnam) Ltd. – Stage 1 46 Above are plastic wrapped concrete columns undergoing the essential ‘curing’ process. To the right drainage pipe having backfill compacted

47 Amanda Foods (Vietnam) Ltd. – Stage 1 47 Completed office for Amanda Sea Food processing and cold storage facility

48 Amanda Foods (Vietnam) Ltd. – Stage 1 48 To the right another view of the Refrigeration plant room with Condensers mounted on the concrete roof To the left a view of the Refrigeration Plant room, end view of the office and in the middle a partial view of the cold store

49 Amanda Foods (Vietnam) Ltd. – Stage 2 49 Various phases in the construction

50 White Sands Resort – Phan Thiet, Binh Thuan 50 External views of the Resort Landscape design by FRC

51 White Sands Resort – Phan Thiet, Binh Thuan 51 Swimming pool area

52 White Sands Resort – Phan Thiet, Binh Thuan 52 Leaded stained glass windows designed by FRC Top middle - fishing boat scene Left - ethnic costumed ladies at the market Right - boys on Buffalo with traditional ‘thằng bờm’ haircuts

53 White Sands Resort – Phan Thiet, Binh Thuan 53 Family BungalowGarden views

54 White Sands Resort – Phan Thiet, Binh Thuan 54 To the right the Swimming Pool in the final phases of construction Completed swimming pool, with underground automatic filtration and chemical dosing system Water used on the site is from underground ‘French drain’ systems designed by FRC, being sand filtered it is chrystal clear, clean and drinkable as attested by Pasteur Institute of HCM

55 White Sands Resort – Phan Thiet, Binh Thuan 55 Pool Bar to the left with local polished red granite top by FRC with ethnic mosaic designs in relief Beach Bar with local polished black granite top to the right by FRC

56 White Sands Resort – Phan Thiet, Binh Thuan 56 Kitchen layout by FRC

57 White Sands Resort – Phan Thiet, Binh Thuan 57 Furniture by FRC, the tables are designed to twist and allow all 4 legs to sit firmly on the floor, ‘leg room’ is a particular feature

58 White Sands Resort – Phan Thiet, Binh Thuan 58 Shopping Store Jaccuzi pool underwater scenes decorating the walls by FRC

59 White Sands resort – Phan Thiet, Binh Thuan 59 Furniture and mosquito drape designed by FRC

60 Swire Cold Storage VN – Stages 01, 02, 03 60 Completed Stage 01, 02 & 03

61 Swire Cold Storage VN – Stage 04 61 To the left ‘cast in’ items ready for concrete floor being placed. Below is steelwork being installed

62 The Manor Building – Ho Chi Minh City 62 Finished Result were commissioned to pull this prestigious Project ‘back on track’ as the structural construction activities had gone out of sequence and control. Three months after undertaking this arduous task the FRC team had the project ‘back on track’ ; thus do we demonstrate our Professionalism

63 The Manor Building – Ho Chi Minh City 63 After completion of our mission the Project was handed back to the owners for their ‘fit out’ teams to undertake their works. This building has a 2 storeys basement for car parking and services, there are approximately 6,000 rooms.

64 Swire Cold Storage VN – Stage 04 & 5 64 Completed Stage 04 Newly installed Swire sign – Stage 5

65 65 Swire Cold Storage VN – Stage 05 View of the completed Stage 05 facility at SCS Overview Swire Stage 5

66 Swire Cold Storage VN – Stage 05 66 View of west endView on entrance to office Overview of Plant roomJunction of Stage 05 & 04

67 Swire Cold Storage VN – Stage 05 67 High Stage Compressors: 2 & 1 and LTA & MTA Applying Vacuum to the Refrigeration pipework Ammonia Condensers on Plant room roofOverview in Plant room

68 Swire Cold Storage VN – Stage 05 68 Install the second evaporator at freezer room N Standing column in room NView down the Annexe Refrigeration Control cabinet room

69 69 Overview Sea Wall White Sands Resort – Sea Wall – Phan Thiet

70 70 White Sands Resort – Sea Wall – Phan Thiet Finishing on wall arm Cleaned Surface

71 71 White Sands Resort – Sea Wall – Phan Thiet Over view from the resort Finishing on wall arm

72 72 White Sands Resort – Sea Wall – Phan Thiet Over view Sea wall with full of sand

73 73 HUYCK.WANGNER VIET NAM – My Phuoc 1 IP Shovelling Protocol Playing drum & Lions dances

74 74 HUYCK.WANGNER VIET NAM – My Phuoc 1 IP, BD Overview to rear side Dat Vi Phu Compacting on bottom of VH2 support foundation

75 75 HUYCK.WANGNER VIET NAM – My Phuoc 1 IP Installing on 200mm fire protection pipe Lean concrete to F14a

76 76 HUYCK.WANGNER VIET NAM – My Phuoc 1 IP

77 77 PFS / ANTARA COLD STORAGE VIETNAM

78 78 78 PFS / ANTARA COLD STORAGE VIETNAM Checking bolt tension Grid line P from P2 conerBolt tension adjust area Adjusting bracing bolt tension

79 79 79 PFS / ANTARA COLD STORAGE VIETNAM Loading Dock Freezer Valve group Insulating work on Freezer Valve group 3

80 80 80 PFS / ANTARA COLD STORAGE VIETNAM Top end lifted by crane, bottom end moves on trolley Panel is installed

81 81 81 PFS / ANTARA COLD STORAGE VIETNAM Evaporative CondenserElectrical room

82 82 82 PFS / ANTARA COLD STORAGE VIETNAM Freezing Status Plant Room

83 83 83 PFS / ANTARA COLD STORAGE VIETNAM Loading Docks.

84 84 84 PFS / ANTARA COLD STORAGE VIETNAM Antara Overview Office Compound

85 85 INTERNATIONAL SHOOL - District 2 HCMC – ADMIN. BUILDING – Front view

86 86 INTERNATIONAL SHOOL - District 2 HCMC – ADMIN. BUILDING – Back View

87 87 Front view OLAM VIETNAM – Café Outspan – Nhut Chanh IZ, Long An

88 88 Back view OLAM VIETNAM – Café Outspan – Nhut Chanh IZ, Long An

89 89 Overview from IP Road OLAM VIETNAM – Café Outspan – Nhut Chanh IZ, Long An

90 90 Work Shop (close) and WT & WWT Plants (further)

91 91 Boiler House & Coal Warehouse from Spent grain Silo OLAM VIETNAM – Café Outspan – Nhut Chanh IZ, Long An

92 92 OLAM VIETNAM – Cashew nut – Bien Hoa, DN

93 93 OLAM VIETNAM – Cashew nut – Bien Hoa

94 94 OLAM VIETNAM – Cashew nut – Bien Hoa

95 95 OLAM VIETNAM – Cashew nut – Bien Hoa

96 96 OLAM VIETNAM – Cashew nut – Bien Hoa Front View Front Yard

97 97 OLAM VIETNAM – Cashew nut – Bien Hoa Office Area Olam Logo in Reception Room cleaned

98 98 OLAM VIETNAM – Cashew nut – Bien Hoa Car Park Bike Shed

99 99 OLAM VIETNAM – Cashew nut – Bien Hoa Overview on ground floor I.C Stores Fumigation Room Nr. 6 to Nr. 1 with new gaskets and more clips

100 100 OLAM VIETNAM – Cashew nut – Bien Hoa Ex-loading Flag poles

101 Gallery between IC & FC OLAM VIETNAM – Cashew nut – Bien Hoa Corridor between IC and FC

102 102 OLAM VIETNAM – Cashew nut – Bien Hoa Installing Lighting System 2nd floor F.C Stores with new gaskets and more clips

103 103 OLAM VIETNAM – Cashew nut – Bien Hoa From Loading Dock to Office Grass along grid line N

104 104 OLAM VIETNAM – Cashew nut – Bien Hoa Safety Fence just been installed to Transformer Area Pipes in Pump House

105 105 FAB TEK – Tan Uyen, Binh Duong

106 106 FAB TEK – Tan Uyen, Binh Duong Fab Tek Office Front view

107 107 FAB TEK – Tan Uyen, Binh Duong Bungalow Fence being installedInstalling fence to Soccer Pitch Down spouts from Lobby to Bath Room areaDown Spouts installed along grid line J

108 108 FAB TEK – Tan Uyen, Binh Duong Fab Tek Fence and Road Fab Tek Lobby

109 109 FAB TEK – Tan Uyen, Binh Duong From Pump House Front side of BungalowFront Soffit Soccer Pitch

110 110 FAB TEK – Tan Uyen, Binh Duong Columns and Rafters Dining HallDining Room Inside of Factory roof

111 111 FAB TEK – Tan Uyen, Binh Duong Fence to Bike Shed - Side viewWorkshop floor from grid line 4 to 1 cured Security Post and Slide GateSwimming pool

112 112 SATRA – Binh Dien Trading Center, District 8

113 113 SATRA – Binh Dien Trading Center, District 8

114 114 SATRA – Binh Dien Trading Center, District 8

115 115 SATRA – Binh Dien Trading Center, District 8 Overviewed in operation

116 116 SATRA – Binh Dien Trading Center, District 8 Front view

117 117 SATRA – Binh Dien Trading Center, District 8 Front view in operation

118 118 SATRA – Binh Dien Trading Center, District 8 Office Building of SATRA Cold Store

119 119 SATRA – Binh Dien Trading Center, District 8 Adjust element to position Team 1, 2 & 3 driving piles

120 120 SATRA – Binh Dien Trading Center, District 8 Pile Refusal Recording Driving piles

121 121 SATRA – Binh Dien Trading Center, District 8 Static Load Test

122 122 SATRA – Binh Dien Trading Center, District 8 Refrigeration System

123 123 SATRA – Binh Dien Trading Center, District 8 Installing Column box

124 124 SATRA – Binh Dien Trading Center, District 8 Install the 1 st board of Partition wallInstall Partition wall

125 125 SATRA – Binh Dien Trading Center, District 8 Install Ceiling Panel

126 126 SATRA – Binh Dien Trading Center, District 8 Racking at Annex area

127 127 SATRA – Binh Dien Trading Center, District 8 Racking installation

128 128 SATRA – Binh Dien Trading Center, District 8 Racking overview

129 129 OLAM SPICES EXPANSION – Long Binh Tech. Park 3D Front view

130 130 OLAM SPICES EXPANSION – Long Binh Tech. Park 3D Overview

131 131 OLAM SPICES EXPANSION – Long Binh Tech. Park Block A – Foundation for machine FG warehouse constructionNutmeg Factory with Nitrogen tank Access ramp to Lot B

132 132 OLAM SPICES EXPANSION – Long Binh Tech. Park Steel structure installationCheck painting at steel workshop Curing concrete floorSaw cut for floor

133 133 Milling machine installation Cryo blending machine Installation New Cleaning line CP Ventilation duct installation OLAM SPICES EXPANSION – Long Binh Tech. Park

134 134 CAFÉ OUTSPANT Phase 2 – Nhut Chanh IP. Generator building and Freeze Dried Tower in finishing View to Extraction building

135 135 CAFÉ OUTSPANT Phase 2 – Nhut Chanh IP. Piling for new FG warehouse1,250m 3 WWTP Concrete for WWTP tankPU floor for process area

136 CAFÉ OUTSPANT Phase 2 – Nhut Chanh IP. New Boiler 25 tons installation New Spray dryer installation New Chiller installation Freezer Dryer Conrad installation

137 CAFÉ OUTSPANT Phase 2 – Nhut Chanh IP. 50m 3 DO tank installation Coffee Process Valve stationCoffee extract tank installation AHU installation

138 CAFÉ OUTSPANT Phase 2 – Nhut Chanh IP. Generator 2,500 kVA installation Cooling tower and piping installationCoffee Roaster installation Spent ground conveyor

139 Dao Heuang Coffee - Laos -50oC Freeze Dryer Cold Chamber Dao Heuang Coffee - Laos -50oC Freeze Dryer Cold Chamber Coffee factory overview Coffee Factory completion

140 Dao Heuang Coffee - Laos -50oC Freeze Dryer Cold Chamber Dao Heuang Coffee - Laos -50oC Freeze Dryer Cold Chamber 3D drawing for panel installation Erection of Insulation panel 250mm thick Vapour barrier installationFloor heating mat installation

141 Dao Heuang Coffee - Laos -50oC Freeze Dryer Cold Chamber Dao Heuang Coffee - Laos -50oC Freeze Dryer Cold Chamber Floor insulation installationCeiling panel pulled closely together Cold room door and Pressure relief valveTesting the Floor heating mat

142 142 Overview on roof space with 38m high building Warehouse and road VAP - Rice Parboiled Milling Plant – Moc Hoa, Long An

143 Piling for main office Steel structure installation Rebar Steel work installation VAP - Rice Parboiled Milling Plant – Moc Hoa, Long An

144 144 VAP Rice Parboiled Milling Plant – Moc Hoa, Long An Storage silo installationParboiling line installation New 5 tons rice hulk fire boiler 3,500 KVA transformer station

145 145 SATRA Flower Market Binh Dien Trading Center – D.8, HCMC Completed Flower market after 7 weeks construction

146 146 SATRA Flower Market Binh Dien Trading Center – D.8, HCMC Completed Flower market after 7 weeks construction

147 147 SATRA Flower Market Binh Dien Trading Center– D.8, HCMC Galvanized profile for internal shop structure RAN-BUILD Steel structure for flower market

148 148 SATRA Flower Market Binh Dien Trading Center – D.8, HCMC Fire pump installation in progressPressure testing for fire pipe Electrical lighting and DB for shopSignage and protection for u/g cable

149 149 SATRA 2A – Road construction Binh Dien Trading Center, D.8, HCMC Road A and the river embankment - completed Road M in front of Cold storage - Completed

150 150 SATRA 2A – Road construction Binh Dien Trading Center, D.8, HCMC Road A – Asphalt placing and compaction Core drill to test the Asphalt

151 151 SATRA 2A – Vegetable Market Binh Dien Trading Center, D.8, HCMC 3D view of Vegetable Market

152 152 SATRA 2A – Vegetable Market Binh Dien Trading Center, D.8, HCMC 3D view of Vegetable Market

153 153 SATRA 2A – Vegetable Market Binh Dien Trading Center, D.8, HCMC Completed the piling work Compaction for yard

154 154 SATRA 2A – Vegetable Market Binh Dien Trading Center, D.8, HCMC Brick work Overview of vegetable building in progress

155 Some on site activities 155 Concrete ‘Boom’ pump in position ready to receive delivery of concrete Ready mixed concrete from the delivery truck being prepared for a ‘slump’ test

156 Inspection 156 To the left the steel ‘Cone’ pulled clear to allow the ready mixed concrete to ‘slump’ Measuring the concrete ‘Slump’, in this case about 160mm (this is a workability check)

157 Some of the many Inspection techniques required on a modern Construction site 157 Above: Ultrasonic test on the weld of a fabricated steel member Right is a ground compaction test underway

158 Flexural testing pile 158 Deflection gauge Hydraulic jack to testing

159 Flexural testing pile No cracks appeared on the body of pile 159 Deflection of 100% loading test

160 Civil and Structural testing Dry film thickness testing 160 Magnetic testing on welded element Soil compaction testingPaint adhesive strength testing

161 Civil and Structural testing Concrete cube for testing 161 Strength test of concrete cube sample Anchor bolt strength testInternal road compaction test

162 MEP TESTING Cable Insulation test 162 Refrigeration system pressure test Pressure testing of water pipe Earth resistance test for Lightning protection system

163 Safety - Quality - Efficiency 163 Project Control Client projects are controlled by our computer generated programmes using the latest version of Microsoft Project Manager; a flexible system that allows any changes to the Project to be incorporated and a prediction made as to the effects on the program. Our Clients can study the progress of the project by site visits, digital photographic record and site reports. Co-ordination meetings with our Clients are followed up with a set of minutes normally available within a maximum of 48 hours. Our on site project team have quality control systems for incoming materials, such as ready mixed concrete, where Slump and Strength tests are made and documented. At the projects completion our Client is provided with a full set of filed and enumerated documentations, e.g. ‘as built’ drawings, test reports on all equipment for such as elevators and cranes, installation and commissioning documents, guarantees, manuals etc. F INISHED R ESULT L TD. Celer et Certus

164 164  Finished Result Vietnam Co., Ltd. (FRC) Mr. Richard Clive Webb ; M: +84 903 881 650  Operations office: Business address 40/38, Calmette Street, Nguyen Thai Binh Ward, District 1, Ho Chi Minh City, Vietnam.  Tel : + 84 8 3915 1240 / 60  Email: finished_result@hcm.fpt.vn / administration@frc.com.vn Safety - Quality - Efficiency Design Consultancy, Project & Construction Management Services F INISHED R ESULT L TD. Celer et Certus Contact Us

165 Thank you very much for your interest! 165 F INISHED R ESULT L TD. Celer et Certus


Download ppt "1 Welcome to our Design Consultancy, Project & Construction Site Management Profile F INISHED R ESULT L TD. Celer et Certus."

Similar presentations


Ads by Google