1 SARMa Emilia-Romagna & Parma Activity report End of June, 2010 Budapest, June, 28th

2 WP1 - Partner Project Management (of project relevance) ANPAR withdrawal – ER acquisition of activities and budget ANPAR activities revision WP2: international meeting at ECOMONDO, Rimini, Nov. 2010 WP3: 2 new pilot sites in ER territory, best definition of LCA manual output WP4: Best integration of Recycling in WP4.2 (ER task leader) in term of Sustainable Supply, Planning, GIS Proposal under valuation by JTS New partnership agreement under signing ANPAR budget revision

3 WPCOMPLETEDIN PROGRESSNEXT STEPS OPEN PROBLEMS WP 2.2 Parma (Nov 2009) SARMa presentation Local Bologna (Dec 2010) WP3 – Pilot sites, GIS Regional\national Parma (May 2011) WP4 – Model sites, GIS, SSM Regional\national - WP 2.3 Bologna (Jun 2009) Project Kick-off Rimini (Nov 2010) Ecomondo WP3.3, 3.4 Recycling International -- WP2 – Meetings directly managed by ER+Parma

4 WPCOMPLETEDIN PROGRESSNEXT STEPSOPEN PROBLEMS WP3.1 pilot site quarry restoration SDB, BSR, PSR--- WP3.2 pilot site Illegal quarrying SDB, BSR, PSR PSR update final results of LIDAr remote-sensing experimentation -- WP3.3 coord. (See Blengini report for details) -  Coordination BSR-R, SDB-R  LCA document,  C&DW document  Ecomondo Nov 2010  C&DW manual will be presented  a draft of the LCA guidelines will be provided Several documents by other partners are still missing: see Blengini report WP3.3 pilot sites recycling - SDB-R, BSR-R for the new pilot sites “Madregolo” and “Castellarano” - Some problems in collecting required information at “Castellarano” WP3.4 synthesisSQSQ-R- In Italy data are difficult to gather at national/regional scale (provincial scale may be the best) WP3 – 3.3 Task coordination (dark colors); 3.1, 3.2, 3.4 contributions

5

6

7 WP ACTIVITIESCOMPLETEDIN PROGRESSNEXT STEPSOPEN PROBLEMS WP4.1 SQ SQ4.1 (some details are under revision of translation) - How about the SSM opinion pool by Tamas ? (for which stakeholders? In national language?) WP4.2 coordination Preparation of SQ4.2; GIS activities workplan Definition and preparation of BSR for 3 Model Site (MS) 4.2  Collecting SQ4.2;  Sinthesis Report 4.2 (+statistical synthesis from web questionnary ) Synthesis Report 4.2: 3 boxes Model Sites: Pella (???), Trebbia (natural area), Styria (economy) 1 box GIS-ER  GIS activities require contributions of Deborah and Fotini (Nikos); no contribution from Pella for Model Site WP4.2 SQ Model site (MS) quarrying in natural area SQ4.2 draft; Model Site Report (MSR) draft SQ4.2 MSR - WP4/5--  Contr. to Recommendations for GIS;  Contributions to WP4+5 final reports about “Planning for sustainability” - WP5.3- Contribution for WP4+5 manual: Best Practices for post- quarrying restoration - WP4/5 – 4.2 Task coordination (dark colors); 4.1, 5.3 contributions

8

9 WP ACTIVITIESCOMPLETEDIN PROGRESSNEXT STEPSOPEN PROBLEMS WP 2.2 Meeting Parma SARMa presentation (11/09) Meeting Bologna WP3 (12/10)Meeting Parma WP4 (05/11)- WP 2.3KOM Bologna (6/09)Ecomondo WP3.3, 3.4 (11/10)-- WP 3.1 (Lanca dei Francesi) SDB, BSR, PSR--- WP 3.2 (Taro River) Required: SDB, BSR, PSR* Indirect: LIDAr survey of the Taro river alluvial fan Integration to PSR (addendum including the final results of LIDAr remote-sensing sperimentation,). -- WP 3.3- SDB-R, BSR-R for pilot sites “Madregolo” and “Castellarano”. - Some problems in collecting required information at “Castellarano” site. WP 3.3 coordination-  Coordination BSR-R, SDB-R  LCA document,  C&DW document  Meeting Rimini (Ecomondo): 3-6 Nov 2010  C&DW manual will be presented  a draft of the LCA guidelines will be provided Several documents are still missing: see note below WP 3.4SQSQ-R- Some data are difficult to gather at national/regional scale, whereas at provincial scale may be easier. WP 4.1SQ4.1*- SSM opinion pool Tamas ??? (for stakeholders? national language?) WP 4.2-SQ4.2 (final draft); PSR Trebbia (final draft)Box GIS-ER in Sinthesis Report 4.2- WP 4.2 coordination  Preparation of SQ4.2;  GIS activities workplan  Preparation of BSR for pilote site 4.2  Collecting SQ4.2;  Sinthesis Report 4.2 (+statistical synthesis from web questionnary ) 3 Boxes pilot-sites 4.2: Pella (???), Trebbia (natural area), Styria (economy) in Sinthesis Report 4.2  GIS activities require contributions of Deborah and Fotini (Nikos);  no contribution from Pella for Pilot Site. WP 4/5--  Contr. to Recommendations for GIS;  Contributions to WP4+5 final reports about “Planning for sustainability” - WP 5.3-- Contribution for WP4+5 manual: Best Practices for post-quarrying restoration - ER+Parma Technical report (June, 2010) - summary table Dark colors for activities at Project coordination level – ER task leader


Download ppt "SARMa Emilia-Romagna & Parma Activity report End of June, 2010 Budapest, June, 28th."