J. Valls, CMS L2-L3 Meeting, Sept 20021 ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.

Similar presentations


Presentation on theme: "J. Valls, CMS L2-L3 Meeting, Sept 20021 ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment."— Presentation transcript:

1 J. Valls, CMS L2-L3 Meeting, Sept 20021 ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment Requirements Document  http://cern.ch/valls

2 J. Valls, CMS L2-L3 Meeting, Sept 2002 2 Goals To fully assemble, test and characterize a total of ~ 700 RODs …by the end 2004

3 J. Valls, CMS L2-L3 Meeting, Sept 2002 3 ROD Assembly Sequence  Mechanical ROD (ROD frames + pipes)  Electrical ROD (+ IC bus + IC boards + AOH)  Full ROD (+ Silicon)

4 J. Valls, CMS L2-L3 Meeting, Sept 2002 4 ROD Flow During Production ROD electrical integration ROD mechanical integration  IC bus and IC boards integration  Optoelectronics integration  CCUM, connectors, and cable assembly  Electrical tests with FE hybrids  Electrical RODs packaged and sent to FNAL and UCSB FNAL/UCSB ROD final qualification  Basic ROD operation Digital tests and readout errors Bad channel identification OH scans Total gain and offset scans Operational bias voltage  X-Y -source scans  Cosmic ray runs ROD silicon integration ROD qualification Helsinki Goal: Ready by March 2003 CERN

5 J. Valls, CMS L2-L3 Meeting, Sept 2002 5 ROD Flow at CERN CERN Spare Modules Storage Bin CERN Single Module Test Setup CERN -Source X-Y Scan Table CERN Single ROD Test Setup FNAL & USBC Modules and ROD CERN ROD Storage Bin CERN ROD Cosmic Rack ROD OK ROD Failure ROD OK Module OK

6 J. Valls, CMS L2-L3 Meeting, Sept 2002 6  -Source X-Y Scan Table Patch panel with connectors (HV, LV, controls, cooling) X-Y movement arms 3 RODS (any type) Rigid cover

7 J. Valls, CMS L2-L3 Meeting, Sept 2002 7 Delivery Schedule for Electrical RODs Testing Capability Rate (4 RODs/day) Wheel integration

8 J. Valls, CMS L2-L3 Meeting, Sept 2002 8 ROD Testing Areas  Building 598 ROD System Tests (prototypes SS, DS) Equipment Procurement and Quality Test Definitions for Production  Building 596 Electrical ROD Assembly and Tests  Building 186 ROD Production and Qualification Tests Tracker Assembly and Integration

9 J. Valls, CMS L2-L3 Meeting, Sept 2002 9 Building 186

10 J. Valls, CMS L2-L3 Meeting, Sept 2002 10 Building 186 (TOB Area) PS x-y Table Rod Hospital Cosmic Rack Cooling unit Cold room PS PS racks Rod storage PS racks Module Air cond 0.8 m 17.8 m 7.1 m Total Testing Area: 126 m 2 Tracker Assembly Hall Tracker Assembly Area 300 ROD capacity Goal: Ready by early 2003 Siemens 1 kW @ +5 0 C/32 0 C 5 kW @ +25 0 C (~400 W for 12 RODs)

11 J. Valls, CMS L2-L3 Meeting, Sept 2002 11 Infrastructure for 186  Gas Contact CERN gas working group  Grounding Contact TIS (?)  TIS Permissions  Conditioning Work Cleaning Furniture procurement Pipe work Etc. Goal: Ready by Dec 2002

12 J. Valls, CMS L2-L3 Meeting, Sept 2002 12 Equipment Needed for Production  DAQ Hardware 4 PC computers DAQ cards 1 ARC single module setup  High Voltage CAEN SY-127 Mainframe (10 boards A343, 2 kV, 200 A) CAEN SY-1527 Mainframe (6 boards A1511, 2 kV, 10 A-1 mA) Current Monitoring (CERN MSGC picoAmmeters) Controls (CAENET V288 VME)  Low Voltage DELPHI switching LV PS (redesigned) 3 LV control PS (testbench)  Cooling Units (and interlocks) Siemens Uniphase Cooling Unit (C 6 F 14 ), 1 kW @ +5 0 C / +32 0 C Refrigeration Unit at Build. 186 (C 6 F 14 ), 5 kW @ +25 0 C  DAQ Software XDAQ (beam-test program) XROD (system test)  Qualification and Acceptance Criteria Software  Integration into DB

13 J. Valls, CMS L2-L3 Meeting, Sept 2002 13 DAQ Test Setups at CERN  Single electrical ROD setup (Build. 596)  Single ROD setup (Build. 186)  X-Y table setup (3 RODS) (Build. 186) Max. APVs OEC Channels OEC Boards MUX Cards PMC-FED TSC/FEC Cards 48242311 / 1 Max. APVs OEC Channels OEC Boards MUX Cards PMC-FED TSC/FEC Cards 144726811 / 1 Max. APVs OEC Channels OEC Boards MUX Cards PMC-FED TSC/FEC Cards 48242311 / 1 120101433 / 3 Total: 121032 / 2 Available: (Build. 598)

14 J. Valls, CMS L2-L3 Meeting, Sept 2002 14 ROD Types  L1, L2  Double Sided RODs (DS) 12 modules, 4 APV  24 fibers  L3, L4  Single Sided RODs (SS4) 6 modules, 4 APV  12 fibers  L5, L6  Single Sided RODs (SS6) 6 modules, 6 APV  18 fibers


Download ppt "J. Valls, CMS L2-L3 Meeting, Sept 20021 ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment."