Modification of the 11T Dipole impregnation mould Impact on impregnation parameters Remy Gauthier, 19.05.2015.

Slides:



Advertisements
Similar presentations
Processes contd Filament Winding Processes contd Dry Lay-up bafore infusion.
Advertisements

Laddomat 21 For accumulation when using a wood-fired boiler Picture 1
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
Rene Herrmann  RTM process (resin transfer moulding) is the most used process for composite mass manufacturing.  For biocomposites the basic idea.
NCSX Peer Review Mold & VPI Process for Modular Coils Presented by: James H. Chrzanowski January 15, 2003.
Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
HQ Coil 18 Test Impregnation LARP Video Meeting November 21, 2013 Dan Cheng.
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
Packing the mold with acrylic resin and Processing acrylic resin
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Module Gas Leak Chiho Wang Duke University.
Raúl Morón Ballester TE-MSC-LMF
Effect of vibrations on void content in composite materials Jelena Muric-Nesic Supervisors: P.Compston, N.Noble, Z.Stachurski DERF June 2008.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
M3D - LMEA Coles. Aim To achieve a greater understanding and appreciation of HMS Lancaster’s Pall Rochem Reverse Osmosis Plants.
Hydronic Mechanical Controls
2-Stage Heat Pump Defrost Options Defrost options: –30, 60, 90, 120 or Auto (Infinity/Evolution only) Defrost initiate temp: 32° F Defrost terminate temp:
Fuel Tank Inerting Joint Airbus/FAA, A320 Flight Tests
Automated Tooth Paste Dispenser By: Cameron Bauer.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS HAZARDS IDENTIFICATION Prepared by: Miss Hairul Nazirah Abdul Halim.
NCSX May 12, 2005 ACC Review- Station 5 J.H. Chrzanowski - 1 ACC Review Of Modular Coil Manufacturing Facility Station No. 5 [VPI] the NCSX Manufacturing.
Mechanical Engineering Department Advanced Composites Dr. Talal Mandourah 1 Lecture 11 & 12 Processing Routes Molding Compound -Short fibers, preimpregnated.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Pseudo CCV System System Diagram Bracket Diagram 50hr oil and carryover add procedure Observations and Background.
Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014.
EMAS Stirling Cooler Operations June 29, 2011 Mike Watson.
Reser- Voir Turbo Pump 1 Five- Fold Turbo Pump 2 Scroll Pump1 Scroll Pump2 Tgt. Cham- ber N2N2 H2H2 P2 P1 P3 P4 P5 P6 Panel Tgt. Cell V2V1 V3 V0 E0 E1.
Summary of Winding Pack Thermal Results K. Freudenberg
Mechanical Engineering Department Advanced Composites Dr. Talal Mandourah 1 Lecture 9 & 10 Processing Routes Hot-melt Impregnation system Step 1 Preparation.
C1 inspection results T. Meighan. C1 Lead Block Area Upper chill plates bowed upwards from side pressure (?) Top fingers pulled away from winding pack.
Reporter:Chen-Kun Lin Adviser:Cheng-Chien Wang
To complete installation on electronic models run one wash cycle then click the DIP switch setting no.4 to the on position DIP switch settings.
He3 dilution refrigerator
Diego BRITEZ Marie JOLLY Ahmad Muheeb MOHAMMAD. I. Monitoring Techniques  Flow Progression: Acoustic Sensors  Curing: Dielectric Analysis II. Control.
OILGEAR PVV PUMPS PVV 200 Performance Curves.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
Epoxy Infusion System – Hardener SIN B17 Polynt’s SIN B17 is the world’s first Epoxy resin hardener based on anhydride chemistrythat has been specially.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
AD ops. - NUMI July 7, 2006 Jim Hylen/FNAL Page 1 Had been having problem with water collecting in tank under horn 1, instead of coming back to surge tank,
Cleanrooms Keith Middleman. Particulates and Clean rooms What is a particulate? Small discrete mass of solid or liquid. Human hair is microns in.
Two-beam module layout
The BioTector B7000i TOC analyzer with integrated oxygen concentrator
POLYMER MANUFACTURING PROCESSES
Processing Of The Denture (Flasking)
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
in a Controlled Chamber
R1 Fundamentals of Refrigeration
Cryogenic behavior of the cryogenic system
HQ Coil 19 Test Impregnation
Curing of acrylic resin denture base
Internal review of the 11T dipole reaction fixture and impregnation mould Outcome of the meeting F. Savary 19 October CERN.
Jason Link University of Hawaii
R1 Fundamentals of Refrigeration
입자유동가공기 Abrasive Flow Machine
November technical stop activities:
PATENTED FIVE-STAGE AUTOMATIC BLENDER CLEANING!
Engineering Materials
LEARNING TARGET: I can design a more efficient solar energy collector.
Analysis of impregnation process
Presentation transcript:

Modification of the 11T Dipole impregnation mould Impact on impregnation parameters Remy Gauthier,

Impregnation procedure 11 Tesla coils

Mold preparation Resin CTD 101K Mold installation in the Telstar impregnation system. Mold preparation before closing the tank Impregnation Curing

Comparison impregnation parameters Impregnation Mould tightness test Bakeout (outgassing)Agitated Degas Time to recover atm press Temp. mould Time Press. chamber Temp. reservoir Time Press. reservoir [s][°C][h][mbar][°C][h][mbar] #109 tool ~40 60min 48~ ~7.5x10 -2 # tool <10 60min 48~ ~7.5x10 -2 Impregnation VPI Feed Method Temp Resin across mould Total TimePress. chamberPress. mouldPress. reservoir [°C][h][min][mbar] #109 tool PP 60 ~3~7 ~10 -3 ~8.9x10 -1 atm press # tool PP 60 ~1~2.5 ~10 -3 ~1.7x

Impregnation procedure 11 Tesla coils We prepare the 11 Tesla coils into is impregnation mould and we make all the connection tight. We make the vacuum into the mould and monitor it. The vacuum lost after 15 minutes should be under 300mbar to avoid lick of resin.

Impregnation procedure 11 Tesla coils Resin CTD 101K It is anhydride cured epoxy system with excellent performance at cryogenic temperature and excellent radiation resistance. It is formulated with very long pot life. The mold is impregnated at 60 C Temperature C Pot Life H Viscosity mPa/s Curing T – cycle Cure 110 C. Post cure C

Impregnation procedure 11 Tesla coils The mold is place on the tray of the Telstar machine over thermal isolated support. The tray is lift up 12 degree to give a slope to the mold. The mold is purged with nitrogen during 3 hours

Impregnation procedure 11 Tesla coils The mold is place into the tank, there are 4 couples of heating cartridges control by 4 sensor of temperature. We added a filter just before the injection point of the mold to avoid problem in case there is particle drain by the resin. We place a Pirani sensor on the channel of injection tube to measure the vacuum level into mold before the injection of the resin. We observed a difference of factor 10 or 100 on the vacuum level of the mold and the chamber. (chamber 1*10-3mbar mold 1*10-1mbar).

Impregnation procedure 11 Tesla coils The mixture of resin is heated at 60 C under agitation and degas into the mixing tank. We degas the resin until we obtain a vacuum level 8-5*10-2mbar that level of vacuum is achieved only if we stopped the agitator into the mixing tank. We stop the vacuum pump and increase the pressure into the mixing tank at 500mbar to allow the resin to flow through the flowmeter. At the end of the impregnation we increase the pressure to 1 bar into the mixing tank to force the resin into the mold that could help the resin going in some void if there is some. We break the vacuum cut the injection tube and restart the vacuum during 4 hours to allow some time to the resin to impregnate every void.

Impregnation procedure 11 Tesla coils At the end of the impregnation we break the vacuum and start the cycle of polymerization for the resin. The temperature increase from 60C to 110C we added a stage at 90C during one hour to avoid the over shoot of the mold in a reason there is some delay between the heating cartridges power and the information from the sensor. The polymerization cycle is 6 hours at 110C and 16 hours at 125C has recommended by CTD company. At the end when the power is cut off we live the mold into the tank until it reached a temperature around 50C before taking it out of the tank.