IFU Management Meeting LAM – 15/10/04. Introduction (olf)

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Test readiness review ESA ’s prototype BLANC P-E LAMLyon October 2003 Mechanical test plan.
IRSIS : Preliminary Fiber bundle design Original datas : Fiber focal plane of F/5,5 telescope primary focal plane - TBC Telescope FOV : 15’x15’
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
The NIRSpec Critical Design Review Oct 8th Dec 11th 2008 T. Beck (& M. Stiavelli)
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
W. Aalders FPU CDR 1-3 July 2003 HIFI 1 FPU CDR MCS HIFI MECHANISMS 1.Focal Plane Chopper (FPC) 2.Diplexer Rooftop Mirror Translator (DRT) 3.Pivot development.
EMIS Chapter 6. EMIS Chapter 6 EMIS Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an.
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
KMOS Instrument Science Team Review Instrument overview.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
From Research Prototype to Production
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
NIRSPEC-IFU Management Meeting LAM – ESA – ASD 15/10/04.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
PACS IBDR 27/28 Feb 2002 Optical System Design1 N. Geis MPE.
DL – IFU (Prieto/Taylor) Slicer: –25mas sampling … 0.9mm slices ~f/250 (assuming no anamorphism) Detector = 2k array of 18um pixels –Slit subtends 1-pixel.
D.GuilhemITER IR/VIS Diagnostic -- April 4th Cadarache Euratom 1/22 ITER wide-angle viewing thermographic and visible system Y.Corre, S.Droineau,
Integral Field Spectrograph Anne EALET CNRS (IN2P3) FRANCE, Instrument Scientist Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
Test Readiness Review 23 October 2003 CRAL - LYON.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA MIRI VM2 Testing Scott Friedman and the MIRI Test Team (special thanks to Paul Eccleston, Alistair.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
NIRSpec IFU Eric Prieto Final Presentation Definition Phase May, 11th – ESTEC.
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
Wide field telescope using spherical mirrors Jim Burge and Roger Angel University of Arizona Tucson, AZ Jim
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
SNAP spectrograph demonstrator : AIT/AIV Cedric CERNA CNRS (IN2P3,INSU) FRANCE,
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
Integral Field Spectrograph Eric Prieto LAM. How to do 3D spectroscopy.
Status of the SWAP instrument
Jim Fast Pacific Northwest National Laboratory
Double Star: Experiment Activities
PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues
30-Nov-2006 Jean-Marc Defise - CSL
IR Detector - Test cryostat : Machining
Slicer development Eric Prieto LAM.
The SNAP Integral Field Spectrograph Overview of the project
Spectrophotometric calibration of the IFU spectrograph
Vertex Detector Mechanical R&D Design Questions and Issues
PHI Status Report SO Cleanliness Working Group #24
SNAP spectrograph demonstrator : Test Plan
An IFU slicer spectrometer for SNAP
Peer Review Agenda (Suggested).
Integration, Test, and Verification
Lockheed Martin Canada’s SMB Mentoring Program
First Stage Cryogenic IF Amplifier
Poster ID: FIP/P7-26: Preventive measures to avoid electrical arcing incidences in SST-1 PF current leads As a preventive measure to mitigate arcing inside.
Presentation transcript:

IFU Management Meeting LAM – 15/10/04

Introduction (olf)

Recall of the development History (Olf) Pour info – coût prototype: Pour info – coût prototype: ~6 my : 360k€ ~6 my : 360k€ Vacuum chambers; vibration tools: ??? Vacuum chambers; vibration tools: ??? ~150k€ hardware ~150k€ hardware Test equipment: ~30k€ Test equipment: ~30k€ Travel: ? Travel: ? Total: ~600k€ (ESA funding : ~300k€) Total: ~600k€ (ESA funding : ~300k€)

Lessons Learned from the prototype development R&T development spirit of LAM Team where the contract was more fly hardware delivery type ( ESA did not refocus during the study) R&T development spirit of LAM Team where the contract was more fly hardware delivery type ( ESA did not refocus during the study) Small experience in structural dynamic analysis Small experience in structural dynamic analysis CNRS difficulties to manage industrial kind of contract CNRS difficulties to manage industrial kind of contract Laboratory has no autonomy Laboratory has no autonomy  The prototype is finished and the core technology is validated

How to move for the NIRSPEC-IFU development Needs of phase B/C/D industrial management type Needs of phase B/C/D industrial management type Needs of high level reference support for dynamical analysis study Needs of high level reference support for dynamical analysis study CNRS administration constraint not adapted for industrial sub-contract CNRS administration constraint not adapted for industrial sub-contract  Refocusing on our core activities

Slicer Principle 1.Field divided by slicing mirrors in subfields telescope pupil on the pupil mirrors 2.Aligned pupil mirrors 3.Sub-field imaged along an entrance slit How to rearrange 2D field to enter spectrograph slit: Courtesy: JR Allington Smith

Entrance Pupil Slicer mirror Pupil mirrors Slit Mirrors Slicer unit optical design for the IFS

Radius of curvature: ~ 150 mm Tilt in Y: +/- 3.7° Tilt in X: from 3.3 to 9° Thickness: 900 µm Width: 27 mm Slicer unit optical design for the IFS

300µm Pupil mirror pitch: mm Pupil oversizing in spectrograph: <2 Tilt Y: +/- 3.7° Tilt X: 3.65° –> 6° Curvature Radius: ~24.5mm Slicer unit optical design for the IFS: pupil mirror

500µm Pitch: mm Curv. radius: 26.5 mm Tilt Y: 0° Tilt X: 6.5° Slicer unit optical design for the IFS: slit mirror

Design Overview Active Stack Heel Stack support Steering mirror Pupil mirror array Slit mirror array Main structure Substructure Thrust cylinders Dummy Stack

The prototype as built

Slicer Stack Clamps 18 dummy slices 10 Active slices 2 Dummy slices Clamp

Mirrors lines

Tests

Results Highlights

Manufacture and integration

Ensquared energy

Crosstalk +/-40µm relative for a specification of +/- 120µm

Slits separation Plots of the intensity profiles in the regions between the pseudo-slits. Lowest contour in the plots corresponds roughly to ~1% of the peak intensity (50 for a peak intensity of ~3000).

Lessons

Prototype critical points Critical point Validation Fabrication of optical subsystem (slices, assembly, specifications) YES Vibration compliance of the sub-system YES Thermal compliance (+cycling) of sub-system YES

Prototype critical points Optical performances (PSF, Alignement, slit function,…) YES (alignement not checked after vibration) Mouting and alignment at operating temperature YES Vibration Compliance of the system Survival (Opto-mechanical defect) Thermal compliance (+cycling) of sub-system YES

ESA ASTRIUM concern ESA and Astrium presentation ESA and Astrium presentation

Technical Baseline (PeB/PD/JLB)

Industrial Team (Olf)

WBS (ASTRIUM)

Share of work and responsibilities

Related Experience (Olf)

LAM Project Team (Olf)

Design & development approach Phase B: Phase B: Design Design Analysis (optical performance, stray light analysis, structural static and dynamic, thermal) Analysis (optical performance, stray light analysis, structural static and dynamic, thermal) Test Plan preparation Test Plan preparation Technological development: Technological development: 30+3 optical bonding release (for statistical approach) 30+3 optical bonding release (for statistical approach) 30+3 Hydroxil bonding release 30+3 Hydroxil bonding release 40 slices stack with optical bonding (vibration, thermal, shock) 40 slices stack with optical bonding (vibration, thermal, shock) 40 slices stack with Hydroxil bonding (“”) 40 slices stack with Hydroxil bonding (“”) Opto-mechanical mount for pupil lines (thermal, vibration, shock) Opto-mechanical mount for pupil lines (thermal, vibration, shock) Opto-mechanical mount for flat folding mirror (thermal, vibration, shock) Opto-mechanical mount for flat folding mirror (thermal, vibration, shock)

Design & development approach Phase C/D: Phase C/D: STM: for dynamical model calibration, opto-mechanical demonstrator verification, and delivery at Astrium STM: for dynamical model calibration, opto-mechanical demonstrator verification, and delivery at Astrium EQM: end to end optically functional for 9 channels, structural fully representative, interface representative; qualification in vibration, optical performance at operating temperature, thermal cycling, and shock EQM: end to end optically functional for 9 channels, structural fully representative, interface representative; qualification in vibration, optical performance at operating temperature, thermal cycling, and shock FM: Environmental tests at acceptance level, acceptance optical test at operation temperature, characterization at operating temperature FM: Environmental tests at acceptance level, acceptance optical test at operation temperature, characterization at operating temperature

Model Philosophy

Technology development plan 33 samples of pupil mirrors optical bonded: 33 samples of pupil mirrors optical bonded: 33 acceptance tests 33 acceptance tests 33 cryo cycling (22°K) 33 cryo cycling (22°K) 30 tests up to release at atmosphere pressure 30 tests up to release at atmosphere pressure 3 tests up to release in vacuum 3 tests up to release in vacuum 33 samples of pupil mirrors hydroxil bonded: 33 samples of pupil mirrors hydroxil bonded: 33 acceptance tests 33 acceptance tests 33 cryo cycling (22°K) 33 cryo cycling (22°K) 30 tests up to release at atmosphere pressure 30 tests up to release at atmosphere pressure 3 tests up to release in vacuum 3 tests up to release in vacuum

Technology development plan 40 slices stack optical bonded: 40 slices stack optical bonded: 15 thermal cycling (survival - IFU-284) 15 thermal cycling (survival - IFU-284) Vibration qualification tests (survival - specification?) Vibration qualification tests (survival - specification?) Shock tests (survival - specifications?) Shock tests (survival - specifications?) 40 slices stack hydroxil bonded: 40 slices stack hydroxil bonded: 15 thermal cycling (survival - IFU-284) 15 thermal cycling (survival - IFU-284) Vibration qualification tests (survival - specification?) Vibration qualification tests (survival - specification?) Shock tests (survival - specifications?) Shock tests (survival - specifications?)

Technology development plan Opto mechanical mount of pupil mirror lines on INVAR: Opto mechanical mount of pupil mirror lines on INVAR: Representative zerodur support (similar mass than support plus pupil mirror) Representative zerodur support (similar mass than support plus pupil mirror) Opto-mechanical mount (representative) Opto-mechanical mount (representative) Vibration test (survival - specifications?) Vibration test (survival - specifications?) Thermal cycling (survival - IFU-284) Thermal cycling (survival - IFU-284) Shock test (survival - specifications?) Shock test (survival - specifications?) Opto mechanical mount of folding mirror: Opto mechanical mount of folding mirror: Representative element Representative element Opto-mechanical mount (representative) Opto-mechanical mount (representative) Vibration test (survival - specifications?) Vibration test (survival - specifications?) Thermal cycling (survival - IFU-284) Thermal cycling (survival - IFU-284) Shock test (survival - specifications?) Shock test (survival - specifications?)

Product Breakdown / procurement approach Image slicer: Image slicer: Slicer unit + pupil line + slit line Slicer unit + pupil line + slit line No opto-mechanical mount No opto-mechanical mount Test structure for Test structure for Folding mirror: Folding mirror: Mirror plus opto-mechanical mount Mirror plus opto-mechanical mount Test Test Toroidal mirrors: Toroidal mirrors: Two mirrors together Two mirrors together Optomechanical mount Optomechanical mount Test structure for Test structure for Structure: Structure: STM: refurbishing after tests STM: refurbishing after tests EQM + FM + Spare: to the same company EQM + FM + Spare: to the same company

Verification approach Sub system acceptance: Sub system acceptance: Slicer, mirror lines: vibration (level?) + thermal cycling Slicer, mirror lines: vibration (level?) + thermal cycling Folding mirror + mount: vibration (level?) + thermal cycling + Folding mirror + mount: vibration (level?) + thermal cycling + Toroidal mirrors: optical performances mounted Toroidal mirrors: optical performances mounted Slicer + pupil +slit: optical performance Slicer + pupil +slit: optical performance

Verification approach EQM: EQM:

Verification approach FM: FM:

Planning KO: Nov 30th KO: Nov 30th PDR: Sept 05 PDR: Sept 05 … a remplir avec le SOW que j’ai pas… michel? … a remplir avec le SOW que j’ai pas… michel?