Purchasing supplies at CERN Procurement Rules Someone FP-PI.

Slides:



Advertisements
Similar presentations
Best Value For Money adjudications for Industrial Services C. Lara/CERN 14 November 2013.
Advertisements

Co-funded by the European Community eContentplus programme WP1 – Project Management Reporting and financial issues Milva Carbonaro GISIG.
Procuring supplies at CERN Presentation for EN
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
Module 10 Organizing Procurement Session 10.7 Procurement of Goods:
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
Contratación en los Organismos Internacionales de Propiedad Industrial Ignacio de Medrano Caballero Director Adjunto Área de Recursos Humanos 25/10/2011.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
How the United Nations does Business Procurement Orientation in China 19 September 2003 Procurement Division United Nations Loida Madrigal.
Section 5: Purchasing Rules
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
TEMPUS ME-TEMPUS-JPHES “IMPROVEMENT OF PARTNERSHIP WITH ENTERPISES BY ENHENCEMENT OF A REGIONAL QUALITY MANAGEMENT POTENTIALS IN WBC” Project.
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions: Management and Financial Issues NATURAL HISTORY MUSEUM – UNIV. OF CRETE (NHMC) Project.
TENDERING PROCEDURE IT- 3927/EN
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4123/EN Supply, Replacement and Repair of Crane Rails.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
Doing business with CERN Anders Unnervik 3 November 2014.
1 An introduction to Project Cycle Management PCM DAY 3 Gori, 31/3 – 3/4/2015.
Purchasing supplies at CERN Procurement Strategy Dante Gregorio FP-PI.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Report on TTonT By: Jan Rozema. Contents Historical overview Status (at PFAC-02) Terms of Reference How to go onward.
Doing business with CERN Anders Unnervik Ankara 5 October 2015.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF HEATING, VENTILATION AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE PS ACCELERATOR INFRASTRUCTURE TENDERING.
Procuring a PV system Community Energy Warwickshire’s approach Phase 1: Partner registration to create a panel of potential tenderers Phase 2: Tendering.
Office of Procurement Services.  Vendor Application Website: 
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
Doing business with CERN Anders Unnervik 20 May 2014.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
PURCHASING 101 SECTION 1 - How to Begin. Is the purchase available from your agency or from other state agencies? ⋆ State Surplus Property ⋆ State Fleet.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the.
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
CERN Procurement Procedures Rome, 28 th June 2016 Adam Horridge.
2016 Floris Bonthond 31 May Agenda – Procurement at CERN 2 What does CERN buy? Procurement budget Industrial Return and Return Coefficients.
Doing business with CERN Anders Unnervik
Agenda Procurement organization and budget What does CERN buy?
Doing business with CERN Anders Unnervik
Doing business with CERN Dante Gregorio (dante.
Purchasing supplies at CERN
Content of Tender Dossier - Instructions to Tenderers - Tenders
INVITATION TO TENDER PROCEDURE IT-4344/EP Design, Supply, Installation, Testing and Commissioning of a Cleanroom extension for the integration of ATLAS.
Purchasing supplies at CERN
Invitation To Tender Procedure
Contract Award Procedures
Invitation To Tender Procedure IT – 4327/SMB Technical specification for the civil Engineering works for the construction of the new building.
Purchasing supplies at CERN
IT-4130/EN Bidders conference
Cooperation between CERN and Ukrainian Industries 2017
TENDERING PROCEDURE IT-3981/EN
Ways to industry participation in CLIC 24th October, 2017
CERN-ITER Workshop CERN Procurement Anders Unnervik 16 Jan 2017
ALIGNMENT RULE PROCEDURE
IT-4328/EN Bidders conference
History Dec 2015, FC Discussion about contract splitting
INTERREG IPA CBC “GREECE ALBANIA ”
GDPR – Practical Implementation Managing contracts, procurement and relationships with suppliers Terry Brewer Chief Executive.
ALIGNMENT RULE PROCEDURE
IT-4464/EN Bidders conference
Presentation transcript:

Purchasing supplies at CERN Procurement Rules Someone FP-PI

Definition Supply contracts: Contracts for supplies of equipment including R&D contracts, electricity, telecommunications and insurance contracts as well as maintenance and leasing contracts covering data processing, printing and telecommunication equipment. CERN — 15/08/11 Purchasing Supplies — Procurement Rules 2

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 3 Procedure = ƒ( Price estimate )

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 4

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 5

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 6 Accessing Procurement Lifecycles

1 Requirements below 10’000 CHF Range: 0 CHF – 1000 CHF Range: 1000 CHF – 5000 CHF Range: 5000 CHF – 10’000 CHF

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 8

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 9 Range: 0 CHF – 5000 CHF Only one written bid is necessary Simplified template available Below 1000 CHF: orders sent by fax Firms from CERN’s Member States If possible, firms from very poorly balanced Member States (IRC < 0.30) Range: 0 CHF – 5000 CHF Only one written bid is necessary Simplified template available Below 1000 CHF: orders sent by fax Firms from CERN’s Member States If possible, firms from very poorly balanced Member States (IRC < 0.30)

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 10 Range: 5000 CHF – 10’000 CHF Bids can be requested by Technical Officer provided CERN Procurement Rules are followed: At least 3 written bids to be sought Simplified template available If < 3 firms contacted  single tender procedure Handled by FP-PI’s Centrale d’Achats Firms from CERN’s Member States If possible, firms from very poorly balanced Member States. Range: 5000 CHF – 10’000 CHF Bids can be requested by Technical Officer provided CERN Procurement Rules are followed: At least 3 written bids to be sought Simplified template available If < 3 firms contacted  single tender procedure Handled by FP-PI’s Centrale d’Achats Firms from CERN’s Member States If possible, firms from very poorly balanced Member States.

2 Requirements ranging between 10 kCHF and 200 kCHF Range: 10 kCHF – 50 kCHF Range: 50 kCHF – 200 kCHF

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 12

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 13 Range: 10 kCHF – 200 kCHF Price enquiry documents in English 3 to 5 firms will be contacted Annexes may include: Technical drawings Description & Quantities Estimate (DQE) “Working on the CERN Site” (PSO/ /Rev.5) Range: 10 kCHF – 200 kCHF Price enquiry documents in English 3 to 5 firms will be contacted Annexes may include: Technical drawings Description & Quantities Estimate (DQE) “Working on the CERN Site” (PSO/ /Rev.5)

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 14 Range: 10 kCHF – 200 kCHF Adjudication 10kCHF-100kCHF Lowest Compliant Bid i.e. to the firm whose bid complies with the technical requirements the financial requirements the delivery requirements And is the lowest Range: 10 kCHF – 200 kCHF Adjudication 10kCHF-100kCHF Lowest Compliant Bid i.e. to the firm whose bid complies with the technical requirements the financial requirements the delivery requirements And is the lowest

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 15 Range: 10 kCHF – 200 kCHF Adjudication 10kCHF-100kCHF Price based on Free Carrier basis (FCA as per Incoterms 2010), i.e.: Without transport costs With packing and loading No disadvantage to firms located in distant countries Range: 10 kCHF – 200 kCHF Adjudication 10kCHF-100kCHF Price based on Free Carrier basis (FCA as per Incoterms 2010), i.e.: Without transport costs With packing and loading No disadvantage to firms located in distant countries

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 16 Range: 10 kCHF – 200 kCHF Adjudication 10kCHF-100kCHF However, Supply contracts shall be adjudicated on a DAP basis (Delivered at Place as per Incoterms 2010) if the ratio of DAP price of the lowest FCA bid to the lowest DAP bid exceeds Range: 10 kCHF – 200 kCHF Adjudication 10kCHF-100kCHF However, Supply contracts shall be adjudicated on a DAP basis (Delivered at Place as per Incoterms 2010) if the ratio of DAP price of the lowest FCA bid to the lowest DAP bid exceeds 1.10.

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 17 Range: 10 kCHF – 200 kCHF Adjudication 100kCHF-200kCHF Supply contracts exceeding 100 kCHF shall be subject to the alignment rule (see later). Range: 10 kCHF – 200 kCHF Adjudication 100kCHF-200kCHF Supply contracts exceeding 100 kCHF shall be subject to the alignment rule (see later).

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 18

3 Requirements exceeding 200 kCHF Range: 200 kCHF – 750 kCHF Range: 750 kCHF and above

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 20

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 21 Range: exceeding 200 kCHF Firms  Market Survey Proposed by Technical Officer From CERN’s Supplier Database (by Procurement Officer) Which have expressed an interest Proposed by ILOs and Delegations Range: exceeding 200 kCHF Firms  Market Survey Proposed by Technical Officer From CERN’s Supplier Database (by Procurement Officer) Which have expressed an interest Proposed by ILOs and Delegations

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 22 Range: exceeding 200 kCHF IT  Technical auditing Purpose: to review IT documents to ensure Procurement Rules are complied with Meetings organised by Technical Officers Technical and Procurement Officers Head of TO’s Dept. or representative Head of FP Dept. or representative A representative from HSE Unit A technical expert from another dept. If necessary, another representative appointed by chairman; e.g. Legal Service Range: exceeding 200 kCHF IT  Technical auditing Purpose: to review IT documents to ensure Procurement Rules are complied with Meetings organised by Technical Officers Technical and Procurement Officers Head of TO’s Dept. or representative Head of FP Dept. or representative A representative from HSE Unit A technical expert from another dept. If necessary, another representative appointed by chairman; e.g. Legal Service

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 23 Range: exceeding 200 kCHF IT  Bid assessment Bids shall be examined to establish that they comply with the technical, financial and delivery requirements in all respects Communication of relevant information to bidders limited to: Procurement Service (< 750 kCHF) A member of Directorate (≥ 750 kCHF) Range: exceeding 200 kCHF IT  Bid assessment Bids shall be examined to establish that they comply with the technical, financial and delivery requirements in all respects Communication of relevant information to bidders limited to: Procurement Service (< 750 kCHF) A member of Directorate (≥ 750 kCHF)

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 24 Range: exceeding 200 kCHF Adjudication Lowest Compliant Bid i.e. to the firm whose bid: complies with the technical, financial and delivery requirements And is the lowest Taking into account the origin of the offer in order to ensure balanced industrial return coefficients for the MS Range: exceeding 200 kCHF Adjudication Lowest Compliant Bid i.e. to the firm whose bid: complies with the technical, financial and delivery requirements And is the lowest Taking into account the origin of the offer in order to ensure balanced industrial return coefficients for the MS

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 25 Range: exceeding 200 kCHF Adjudication Price based on Free Carrier basis (FCA as per Incoterms 2010), i.e.: Without transport costs With packing and loading No disadvantage to firms located in distant countries Range: exceeding 200 kCHF Adjudication Price based on Free Carrier basis (FCA as per Incoterms 2010), i.e.: Without transport costs With packing and loading No disadvantage to firms located in distant countries

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 26 Range: exceeding 200 kCHF Adjudication However, Supply contracts shall be adjudicated on a DAP basis (Delivered at Place as per Incoterms 2010) if the ratio of DAP price of the lowest FCA bid to the lowest DAP bid exceeds Range: exceeding 200 kCHF Adjudication However, Supply contracts shall be adjudicated on a DAP basis (Delivered at Place as per Incoterms 2010) if the ratio of DAP price of the lowest FCA bid to the lowest DAP bid exceeds 1.10.

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 27 Range: exceeding 200 kCHF Industrial Return Coefficient For Supply contracts and for a 12-month period starting on 1 st March, defined as: “The ratio between that Member State's percentage share of all purchases of supplies (excluding purchases funded by non-Member States) during the preceding four calendar years and that State's percentage contribution to the Budget over the same period” Range: exceeding 200 kCHF Industrial Return Coefficient For Supply contracts and for a 12-month period starting on 1 st March, defined as: “The ratio between that Member State's percentage share of all purchases of supplies (excluding purchases funded by non-Member States) during the preceding four calendar years and that State's percentage contribution to the Budget over the same period”

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 28 Range: exceeding 200 kCHF Industrial Return Coefficient For 2013: Poorly balanced  < 0.91 Well balanced  ≥ 0.91 Range: exceeding 200 kCHF Industrial Return Coefficient For 2013: Poorly balanced  < 0.91 Well balanced  ≥ 0.91

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 29 Range: exceeding 200 kCHF Origin of the Offer According to standards defined by EU: “the country(ies) where the supplies (including their components and sub-assemblies) are manufactured or undergo the last major transformation by the contactor or his sub- contractor” If at least 60% of the total amount of the bid comes from a poorly balanced MS, then the whole bid will be treated as that from a bidder in a poorly balanced MS Range: exceeding 200 kCHF Origin of the Offer According to standards defined by EU: “the country(ies) where the supplies (including their components and sub-assemblies) are manufactured or undergo the last major transformation by the contactor or his sub- contractor” If at least 60% of the total amount of the bid comes from a poorly balanced MS, then the whole bid will be treated as that from a bidder in a poorly balanced MS

CERN — 15/08/11 Purchasing Supplies — Procurement Rules 30 Range: exceeding 200 kCHF Alignment Rule 2 possibilities, if lowest bid compliant is from poorly balanced MS  the bidder gets the contract from well balanced MS and if first lowest bid compliant is from poorly balanced MS is < 20% and if it aligns with cheapest bid  this bidder gets the contract Range: exceeding 200 kCHF Alignment Rule 2 possibilities, if lowest bid compliant is from poorly balanced MS  the bidder gets the contract from well balanced MS and if first lowest bid compliant is from poorly balanced MS is < 20% and if it aligns with cheapest bid  this bidder gets the contract