1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.

Slides:



Advertisements
Similar presentations
Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Advertisements

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Frank Tecker CTF3 Committee Last two months’ chronology Wed 23/03:first beam to end of TL1 Mon 28/03:beam to CR + factor 4 combination Thu 31/03:“near.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
CTF3 BPMs October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 1.
Low Emittance RF Gun Developments for PAL-XFEL
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
TBTS Test Program & Schedule G. Riddone
CLIC-ACE, Frank Tecker CTF3 program completion and upgrade to CTF3+ Frank Tecker – CERN for the CTF3 team CTF3 program completion and upgrade.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
W. Wuensch CLIC project meeting High-power rf structure testing.
R. Corsini, CTF3 results in /2/2011 CLIC MEETING 1 CTF3 Experimental results in 2010 R. Corsini for the CTF3 Team.
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
Two-Beam Test Stand results 5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program SLAC, Stanford, CA, USA Erik Adli, University.
1 CTF3 collaboration meeting Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
1 CTF3 Collaboration Board Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
Main and Drive Beam Dynamics Working Group Caterina Biscari, Daniel Schulte Attending people ~ 20 ± 5 Presentations ~ 18 (7 from CERN) CL IC 07.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CLIC Parameter Working Group Two Beam Module Design
CALIFES A proposed electron beam test facility at CERN
CTF3 PROBE BEAM LINAC COMMISSIONG AND OPERATIONS
Work packages : Overview of experimental verification, CTF3 and CLIC Zero R. Corsini for the CLIC/CTF3 Collaboration Basically all WP scientific and.
First Year of Operation at the Two-beam Test Stand
CTF3 Collaboration Board May 2009 G.Geschonke
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
CLEX* Status and Plans CTF3 complex CLEX
Status of the CLIC main beam injectors
TBL, Status, Plans, Experiments
Have a chance to operate your own beam at CERN
CTF3 Collaboration Technical Meeting January 2008
Recent high-gradient testing results from the CLIC XBoxes
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Two-beam Test-stand Design and Construction Status
Presentation transcript:

1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN

2 CTF3 CLEX day July 2006 DL CLEX building in CTF3 programme 2006 Thermionic gun CR Linac TL GHz production (PETS line) and test stand Photo injector / laser tests from 2006 On schedule so far

3 CTF3 CLEX day July 2006 Delay Loop latest news one of three buncher cavities

4 CTF3 CLEX day July GHz work CTF3 linac PETs branch High-gradient test stand, CTF2 High-power transfer line Two-beam 30 GHz power production in CTF3 recent Cu structure presently CLIC parameters are reviewed, probably frequency and acc. gradient change

5 CTF3 CLEX day July 2006 Next steps: 2006 Fully commission Delay Loop ü Separate Linac from rest of machine ü 30 GHz power testing ü Construction of CLEX building ü Install and commission Combiner Ring Combiner Ring and TL1: Optics: INFN ü Magnets: BINP/CERN/Lure/CIEMAT/ INFN ü Power supplies: CERN ü RF deflectors: INFN ü Septa: CIEMAT ü Kicker: CIEMAT/CERN ü pulser: CIEMAT/CERN ü 3 GHz source: CERN ü Controls: CERN ü BPM electronics: LAPP / CERN ü Vacuum chamber + BPM: INFN ü In spite of some difficulties, we expect the Combiner Ring to be finished in 2006

6 CTF3 CLEX day July 2006

7 Next steps: 2007 Optics India ? Magnets: CERN, Celsius, CIEMAT, Vacuum system: India ? 50 m alu chamber, shielded bellows + pump ports, BPM pick-ups and screens: CERN Vacuum pumps and control CERN Power supplies: CERN BPM electronics : LAPP ? TL2 (2007) TL2 * 2007 CERN ?

8 CTF3 CLEX day July 2006 CLEX building 8 m wide, 40 m long partly covered by klystron gallery Status: Building layout defined construction started 2006  Hans Braun Construction during 2006 installation of equipment from

9 CTF3 CLEX day July 2006 CLEX

10 CTF3 CLEX day July 2006 Project status CLEX 2-Beam Test Stand: Beam dynamics, Magnets, vacuum, Beam Diagnostics; Uppsala University DUT + RF equipment: CERN Probe Beam Dapnia / LAPP / LAL CERN Instrumentation Test Beam (not presently in base-line project) Great Britain ? Building: CERN TBL Design: CERN Benchmarking experiments : CERN Magnets and magnet movers: CIEMAT Power supplies: CERN Beam Diagnostics: Spain ? NW University Illinois Vacuum system CERN PETS: Prototype CIEMAT, Series ? Installations should be able to be operated by the operations/commissioning team !

11 CTF3 CLEX day July 2006 Accelerating Structure Tank Directional couplers Faraday Cup RF Power from PETS Variable Power Splitter Ion Pump Cooling Water RF Loads ‘Typical’ 30 GHz high-power test stand PetsAccelerating structure

12 CTF3 CLEX day July 2006 Tests with 2-beam test stand a) condition and operate a PETS structure up to the nominal output power (640 MW, 70 ns). The test structure will have the same geometry as a CLIC PETS but only be longer to be able to generate the same power levels with a lower current beam - 30 A rather than 160 A b) operate CLIC accelerating structure at nominal parameters c) acceleration with probe beam (single or few bunches); verify fields, power d) measure the effect of rf breakdown on the drive and probe beams. The measurements are crucial for determining the required breakdown rate for CLIC components. e) demonstrate operation of a CLIC module which consists of four accelerating structures driven by a PETS.

13 CTF3 CLEX day July 2006

14 CTF3 CLEX day July 2006 Photo Injector Status: RAL laser advancing LAL RF gun cavity advancing CERN photo cathode activities on schedule. 85 MV/m acc. field 5 MeV Phase 1: Test in CTF2: From 2007 onwards Laser in “old” laser room above CTF2 Phase 2: Gun in CTF3: earliest spring 2008 Laser in CTF2

15 CTF3 CLEX day July 2006 Planning summary: CLEX: building ready: end 2006 ready to install equipment: Mid June 2007 Klystron gallery: building ready: March 2007 ready to install equipment: Mid June 2007 TL2: Install 2. half 2007 TL2*: Install end 2007 CR install: fall 2006 CR Commissioning: 2007 Two-Beam test stand : First beam as early as possible: April 2008 TBL : goal first tests in 2008 Goals for 2008: PETS power / operate accelerating structure / Probe beam commissioned Probe Beam Klystron/modulator : ? Laser In “old" laser room above CTF2: from mid 2006 In CTF3 earliest beginning 2008 Califes installation ? Commissioning in parallel with TBTS and PETS tests (2008) Beam in CLEX : from March 2008 onwards

16 CTF3 CLEX day July 2006 Expected this evening Definition of: Who does what from where to where interfaces, engineering details, infrastructure integration Planning updated or confirmed BPM strategy, read-out electronics ?

17 CTF3 CLEX day July 2006 Recent Results Reached nominal CLIC values : 150 MV/m 70 ns