Christophe Martin TE-MPE-EP 02/06/2015 1 The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.

Slides:



Advertisements
Similar presentations
Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Failure mode impact studies and LV system commissioning tests
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Timing upgrades after LS1 Jean-Claude BAU BE-CO-HT1.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
B. Todd et al. 25 th August 2009 Observations Since v1.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
A.Dinius AB/PO/IEE - BIS Audit 18 th September 2006 Beam Interlock System Hardware Implementation.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Stéphane Gabourin TE/MPE-EP MPP – 23 th Oct 2015 CIBDS beam dump triggers due to glitches in BIS loop B1-A diagnosis and mitigation measures.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
YETS LHC 2015/16 - ABT Group TCM Francesco castronuovo.
BE-CO review Looking back at LS1 CERN /12/2015 Delphine Jacquet BE/OP/LHC Denis Cotte BE/OP/PS 1.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
YETS status report TCM Francesco castronuovo.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
CERN Timing Overview CERN timing overview and our future plans with White Rabbit Jean-Claude BAU – CERN – 22 March
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
MPE activities within MP3 Arjan Verweij A. Verweij, MPE review, 2 June 2015 The questions: 1. Define the scope of work for your activity 2. Structure of.
MPE and BE-CO Collaborations  MPE and BE-CO collaborations Jean-Christophe Garnier 01/12/2015 On behalf of TE-MPE.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
YETS status report TCM Francesco castronuovo.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
0v1.
CLAS12 DAQ & Trigger Status
Beam Interlock System SPS CIBU Connection Review
TE-MPE LS1 review Vision from EN-EL(CF)
Injectors BLM system: PS Ring installation at EYETS
LINAC4 50 MeV phase BIS STATUS
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
LAAWG Status Report – 15th May 2007
CMS November Upgrade Week
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Introduction SMP = Safe Machine Parameters
Jan Królikowski Warsaw University
Proton Source and LEBT Luigi Celona & Lorenzo Neri
1v1.
Presentation transcript:

Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas Bellego

Christophe Martin TE-MPE-EP 02/06/2015 -Scope of the LS1 activity for the BIS and SMP -Work planned and schedule -Resources needed during LS1 -Example of aspects which worked well -Example of aspects which gave difficulties -Aspects to be changed or improved -Conclusion 2 Outline:

Christophe Martin TE-MPE-EP 02/06/ Main activities during LS1 for the BIS and SMP: Upgrading BIS hardware parts CPU RIO3 replaced by MENA20  for all BIS crates CIBO cards improvement Measurement & checking campaign of the BIS optical loops for LHC (+ INJ, EXT & SPS) of all User Interfaces (CIBU) 360 links re-checked with 20 different systems Lengthy but fruitful exercise: a lot of non-conformities were identified ! Relocation of BIS equipment (R2E) BIS in UJ56 moved to USC55 Move of the User Interfaces in TZ76 Was it properly planned ?    

Christophe Martin TE-MPE-EP 02/06/ Main activities during LS1 for the BIS and SMP: Additional features of BIS Design of a new Beam Dump trigger : the CIBDS Boards inserted in the BIS loops (UA63 & UA67) Commissioning of the BIS and SMP Individual System Tests Final MPS tests Was it properly planned ? Parameter changes for SMP Change of equations for the setting of Set-up Beam Fag New parameters : “Optics-ID”    

Christophe Martin TE-MPE-EP 02/06/ Resources for the BIS and SMP from Feb’13 up to Mars’15 RoleQty FTE occupancy Engineer185 % Technical engineer160 % Technician110% External collaborator250 % Generally speaking, enough manpower was available to perform the BIS and SMP tasks related to LS1 period…. The distribution of work during LS1 has not been regular. The re-commissioning of BIS & SMP is highly dependent of other systems and cannot be realized before the last weeks/days of LS1. …except for the crash program over the 4 last weeks of LS1 where the 3 experienced engineers joined the BIS team in order to solve open issues and to perform the IST of both BIS & SMP systems. BIS team also involved in non-LS1 activities: like the deployment of the BIS in Linac4

Christophe Martin TE-MPE-EP 02/06/ Which activities work well during LS1 ? -Replacement of the RIO3 by the MENA-20 VME processor board -AB/CO has provided the processor boards in due time -The SW team has deployed the new GUI without major problems -BIS relocation in USC55 and TZ76 (R2E) -All required cables and optical fibers have been pulled before LS1 -All users connected on the BIS were ready in time for the re- commissioning of the related User Interfaces (CIBU) -The optical links measurement campaign -The process is well proved (first campaign made during the 2011 TS) -We have reliable optical devices to perform these measurements

Christophe Martin TE-MPE-EP 02/06/ Which activities gave difficulties during LS1 ? -The deployment of the CIBDS (a.k.a. “the third channel” for LBDS triggering) -Functional specification still a “draft for discussion” and engineering specification still “under approval” -No reliable tests in real conditions were performed before the startup - Integration within the LHC Sequencer was not defined -The commissioning of the 360 User Interfaces (CIBU) with the Users -A huge number of connection were (are) identified as “not conform” -Some users don’t endorse the responsibility for these “non conformities” (” It works without problem since the beginning of the LHC, why it should be changed?” ) -The Individual System Tests (IST) of the BIS and SMP -The existing procedures have not been adapted for the re-commissioning after LS1 ( the procedures were established for the first start of the LHC) -For the Injection and Extraction BIS the procedures did not exist -We were allowed to access to the BIS loops on only the last week of LS1…

Christophe Martin TE-MPE-EP 02/06/ What need to be improved or changed ? -We should advise the User System’s responsible many months ahead of LS2 : -for the re-commissioning of their electronics interfaced with the CIBU -for the compliance to BIS connection standards (for those which have been identified as “not conform”) -All the requirements must be clearly established and documented before the LS (or TS) -We should pay more attention to the all software tools available for the BIS maintenance, exploitation and supervision. Many SW were available before LS1, but unfortunately not by the end of 2014 : the tests program needed to commission the BIS ( like the one remotely closing the optical loops) the DIAMON tool for the Operational diagnostics many other programs (like the one performing the Timing alignment of the LHC Controllers….)

Christophe Martin TE-MPE-EP 02/06/ To conclude : Overall, LS1 activities for BIS & SMP have been performed in relatively good conditions, mainly because most of the tasks were foreseen and planned before LS1. Nevertheless, the last weeks of LS1 were very tough… Mainly due to: -Underestimation of the workload related to IST -Lack of experienced people in this matter -Lack of guidance for managing priorities

Christophe Martin TE-MPE-EP 02/06/ Thanks for your attention