HV Cable and Snout Conflict: Problem and Possible Fix James Mott g-2 Tracker Meeting 02/25/16.

Slides:



Advertisements
Similar presentations
1 Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here Patch.
Advertisements

Dimensioning Dimensioning Gateway To Technology®
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
ATLAS Pixel Detector BCM Signal Cable October 13, 2005 E. Anderssen, LBNL.
Constructing VHF / UHF Antennas. Presented at Ham Com 2014 Larry Brown WB5CXC Charles Webb W5WF.
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
Polishing the Ferrules Howard Budd Sep Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.
Duane Richardson, MMR Special Effects Lighting on your railroad.
How to Replace Your Desktop PC’s Power Supply Computer Based Training Objectives.
By: Colt Schmidt Required 4 AA Re-chargeable Batteries Finished piece.
Wiring MVRT 2010 – 2011 Season. Table of Contents Wire stripping Crimping Soldering.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
Shear Flow. Beams Subjected to Bending Loads So why did these Beams split down Their length?
Replacing board in CLAP Tools: Flashlight (torch for those of you in Cape Town)) small philips screwdriver spacer tool* dish to hold screws 2 rolls of.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Belle-II iTOP readout: production HV board and front board iTOP Electro-opto-mechanical working group Virginia Tech, 7/3/2013 Gerard Visser Indiana.
Flobber Space Constraints: Resolution Options James Mott, Eric Hazen, Dan Gastler Tracker Meeting 08/20/15.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
ATLAS Pixel Detector BCM Signal Cable October 5, 2005 E. Anderssen, LBNL.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
LiH Casting & Testing1 Lithium Hydride Disc Casting & Testing Approaches C. M. Lei March 2, 2007.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
HV connection for a Common GEM foil design Aiwu Zhang
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Position of the target cell A strange peak in the distribution of e + e - vertices and thoughtless alignment of the target 22 Aug H. Kanda.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
PRACTICAL ELECTRONICS
ECYBERMISSION By Payton, Anna, Nikita, and Kira. Problem Lack of green energy. Percent of windmill usage is very low. Critical in the long run; The energy.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Electrostatic FEA of the Ground Plane Features Bo Yu Sept. 14, 2015.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
Correspondence with HuntVac. Jan 13 Sven, Thanks for the call. Just to recap (and so I don’t lose my notes): · Redesign AL box vessels. · QTY.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
Place Value Identifying place value of a number is important.
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
“CENTRAL SUPPORT FRAME” -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
R. Kersevan, TE-VSC-VSM 30/06/2016
IBL Wire Handling Concepts for Beampipe Support and Adjustment
EC board for JEM-EUSO Design investigations
NP04 CPA/FC/HV Interfaces
HPS Motherboard Electronic Design
Some proposals on HV circuits realization for segmented straw detector
First of all we will remind some numbers:
TPC Support and Constraint TPC Support
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Go to =>
Wiring the Light and Relay
Column subtraction So far we have subtracted horizontally
Enclosure openings with wires
Presentation transcript:

HV Cable and Snout Conflict: Problem and Possible Fix James Mott g-2 Tracker Meeting 02/25/16

Change in snout geometry: 22 At test beam, the snout had a big square pocket next to the feedthrough board. In the production design, we’ve moved to a tapered pocket. This caused a conflict between the snout wall and our HV cables

HV Cable: Test Beam Design 33 Side OnTop Down Straws Side Flobber Side Straws Side Flobber Side Flexi Connectors HV Socket HV Header (same on both sides) HV Cable Shrink Tube Epoxy HV connector is a header (pins sticking out) on the feedthru board. Test beam connector was wires soldered on to a socket, then epoxied to give some rigidity.

HV Cable: Conflict with Tapered Snout 44 Side OnTop Down For a comfortable radius of curvature (from trying to bend HV cable and epoxy), the cables run into the bottom and one wall of the snout. Most of the problems come from the HV connector extending a long way into the snout. HV connector HV cable Flexi Feedthru

HV Cable: Conflict in Real Life 55 This really is a problem – I can’t put the feedthrough board in the 3D-model of the snout. The obvious solutions would be to change the design of the feedthrough board or the snout. But feedthroughs are made ($5k) and snout casts are made ($5k) We tried a few different solutions here but kept running into problems with HV clearance. This is the best we think we can do without re-making boards…

Proposed Solution: Comparison 66 OLD NEW Side OnTop Down Cable board with sockets New HV header

New HV Design: Mechanical Prototype 1 77 Used prototyping board to mock-up cable board – dimensions and wire positions are approximate: New lower profile HV header with round pins (old on right) Feedthru Moved one cable over 0.1” so it doesn’t hit wall – should still be OK for HV clearance Sockets for plugging onto header Will have through holes for soldering cables – probably need to epoxy too

New HV Design: Mechanical Prototype 2 88 Side OnFrom inside snout

New HV Design: In Snout 99 With new design it fits comfortably in snout (and better than test beam design did) Cost is only a few hundred dollars for new connectors and adapter boards Any exposed HV will be conformally coated. But we might want to also coat or put kapton inside the snout – clearance was small before and now is a little smaller…

Current HV Clearance vs Test Beam: Vertical 10 Test BeamProduction Within board, clearance is unchanged with minimum of 3.5 mm Closest point to snout vertically was 5 mm - it’s now 4.1 mm Remember we’re expecting HV to be up to ~1.8 kV

Current HV Clearance vs Test Beam: Horizontal 11 Test BeamProduction Closest point to snout horizontally was 3 mm and it’s now 2.7 mm