BBC Readiness Report for p+p 2008 Jan.29th Misaki Ouchida, Kazuhisa Yamaura Hiroshima University.

Slides:



Advertisements
Similar presentations
STAR Status of J/  Trigger Simulations for d+Au Running Trigger Board Meeting Dec5, 2002 MC & TU.
Advertisements

Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Report ~first collision Kotaro Kijima 2010/01/25 Local lab meeting.
PHENIX local RUN9 RHIC meeting Manabu Togawa for the PHENIX 1.
STAR 62 GeV CuCu Event totals (as of 3/16/05, noon ) Total: Mevts of BBC Narrow Goal > 20 Mevts. BBC Narrow Trigger has been operational for 6 full.
1 Summary on the Wednesday access of BBC FEM 07/28/05 Kazuhisa Yamaura Koutaro Kijima Daisuke Watanabe Misaki Ouchida.
EH1 (AD 1&2, IWS, OWS) PMT Jul. 30 – Aug. 20 RollingGain Calibration Summary Zhe Wang (BNL) and Qing He (Princeton) Aug. 22, 2011.
1 Measurement of phi and Misaki Ouchida f or the PHENIX Collaboration Hiroshima University What is expected? Hadron suppression C.S.R.
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
T0 status ShinIchi Esumi Univ. of Tsukuba contents (1) Do we really need T0? (2) rate estimate and statistics (3) design and installation.
Sourav Tarafdar Banaras Hindu University For the PHENIX Collaboration Hard Probes 2012 Measurement of electrons from Heavy Quarks at PHENIX.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
What have we done? for Run9 around first collision ~2009/03/01 Kotaro Kijima Masaya Nihashi.
ScECAL Fermilab Beam Test analysis ScECAL Group Meeting Kyungpook National University, Daegu, Republic of Korea, August 6 th, 2010 Adil Khan, Satoru Uozumi,
Nov2,2001High P T Workshop, BNL Julia Velkovska High pt Hadrons from  sNN = 130 GeV Au-Au collisions measured in PHENIX Julia Velkovska (BNL) for PHENIX.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
STAR Ready to move on to 7.7 GeV Bill Christie For The STAR Collaboration April 13, Please N.B. All data plots shown in this presentation are online.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 5 April 2011 Time Meeting, BNL.
Analysis of Endstation A setup Josef Uher. Quartz bar Start counter.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
Centrality Categorization and its Application to Physics Effects in High-Energy d+A Collisions Javier Orjuela-Koop University of Colorado Boulder For the.
PHOBOS 22.5 & 62.4 GeV Cu+Cu Peter Steinberg Brookhaven National Laboratory March 23, 2005.
Monitoring of background events in 2010 run Giuseppe Zito 06/11/2015 PFG/MIG Topical meeting on beam background.
T0/PCR / NTC Meeting at bldg (Sep / 27 / 2001) Memo for the T0/PCR/NTC cable length (for HV and signal) *** Contents *** 1) Dimensions in IR. 2)
October 14, 2004 Single Spin Asymmetries 1 Single Spin Asymmetries for charged pions. Overview  One physics slide  What is measured, kinematic variables.
2008 Oct. Tsukuba 1 Misaki Ouchida Hiroshima University For the PHENIX Collaboration ω ω ω e+e+ eーeー γ γ π+π+ π0π0 γ πーπー π0π0 γ γ Low mass vector.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
Introduction to PHENIX Beam Beam Counter (BBC)
SCT Readiness for Heavy Ion Collisions Dave Robinson on behalf of SCT 15/9/101Dave Robinson Heavy Ion Review.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
High Multiplicity Trigger Operation Status RIKEN/RBRC Itaru Nakagawa On behalf of Toru Nagashima, Aaron Key, SeYoung Han, Shoichi Hasegawa 1.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Luminosity Monitoring Issues  ZDC  what’s the advantage?  problems  BBC  can they do it? A. Drees QCD critical point workshop, Mar
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Study of J/  ->e + e - in d-Au Collision with Electron Triggers in PHENIX W. Xie (UC. Riverside) PHENIX Collaboration April APS in 2003.
FTPC calibration status & plans for Y03 Joern Putschke for the STAR FTPC group STAR Calibration Meeting 2002 November 7, 2002.
PHENIX results on collectivity tests in high-multiplicity p+p and p+Au collisions at √s NN =200 GeV RIKEN/RBRC Itaru Nakagawa Quark Matter 2015, Kobe,
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
2008 Oct. Tsukuba 1 Misaki Ouchida Hiroshima University For the PHENIX Collaboration ω ω ω e+e+ eーeー γ γ π+π+ π0π0 γ πーπー π0π0 γ γ Low mass vector.
Development of a pad interpolation algorithm using charge-sharing.
Валидация TRT DCS CONDITIONS SERVICE Евгений Солдатов, НИЯУ МИФИ “Physics&Computing in ATLAS” – 22/09/2010.
1 Report on PHENIX work in Apr/May/Jun Kotaro Kijima 大西洋~
Yonsei – Tsukuba Workshop / Hiroshi Tsuruoka / Aug 1 Current Status of TOF Analysis 1. PHENIX 実験とは 2.なぜ新たな検出器が必要か? 3. Time Zero Counter の設計 4.テスト実験(
PHENIX J/  Measurements at  s = 200A GeV Wei Xie UC. RiverSide For PHENIX Collaboration.
D. Elia (INFN Bari)ALICE Offline week / CERN Update on the SPD Offline Domenico Elia in collaboration with H. Tydesjo, A. Mastroserio Overview:
HF PMT Issues HF PMT Choice: Hamamatsu R7525 Main Properties Operating Conditions Gain Choice Criteria – lifetime – saturation – timing – SPE monitoring.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
An Automated calibration method from shower data
Offline data taking and processing
CLAS12 software workshop
Software Update Takashi HACHIYA.
MDC Data Check Wu Linghui
Maki KUROSAWA VTX Group 2014 Feb 20
Run16 Y. Akiba.
FMS Readiness for Run 11 Stephen Trentalange.
Preparation of the CLAS12 First Experiment Status and Time-Line
Test for PMT afterpulse with He Gas Flowing
Status report Minjung Kim
Current status Minjung Kim
Status of DT Local Trigger Commissioning
Presentation transcript:

BBC Readiness Report for p+p 2008 Jan.29th Misaki Ouchida, Kazuhisa Yamaura Hiroshima University

1) Are any changes needed to your subsystem, e.g. HV changes, etc, for pp running? Who will do those and when? A: Nothing. We don’t have to change. 2) Are any special runs needed to check your subsystem for pp collisions? A: Nothing. Sometimes it’s better for us to take B_OFF Run. (for checking Vertex’s moving over a little.) (But it is not indispensable.)

3) What changes to online monitoring will you need to make for pp collisions, and when/who will make those? A: Nothing except the timing adjustment (v124) by looking Hit time distribution. We would not need to change as long as changing assigned trigger for p+p. catching Au catching d SouthNorth Change: we will update South BBC number of Hit per Event monitor for p+p. South over limit range will be update.

4) If we get the opportunity to run for 500 GeV p+p collisions for some amount of time at the end of the run, what additional changes would you need to make for your subsystem? Same questions as 1,2,3 above for this. A: Nothing.

We have checked FEM condition to do T-scan and Q- scan and calibrated data every weeks or every B_OFF run. You can check these data below; Q-scanT-scan (lattermost d+Au Run# ADC[ch] TDC[ch] ADC of PMT Laser ADCLaser TDC TDC overflow

Back Up BBC Online Monitor looks good!

Trigger rarely change We have to update online monitor to suit trigger. The red line is the ZDC vertex distributions triggered by ZDCLL1wide.The distribution is normalized by the pre- scale factor of each trigger.