John Deere Team Weekly Status Report Week 3 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

GBA 573 Final Presentation Jonathan Stone Summer 2003.
TurnKey Project Management Services Capabilities Briefing.
Writing as a Team Nicole Lindsay Bachelor of Commerce Quarter 2 January 2006.
National Center for Accessible Transportation Survey of Air Travel Needs and Experiences for People With Disabilities Virginia M. Lesser Director, Survey.
Week 4 Deliverables Team Highlander. Patent 1-Motorized Walker Pat No Date 12/08/1992 A motorized walker includes a base upon which a person.
1. P09203 – 1kg Robotic Motor Module Gen 2 Platform This project is Sponsored by the Kate Gleason Foundation.  Team Members:  Lauren Farnsworth → Team.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
ODOS The Office of the Dean of Students. Projects Interactive Campus Map Global Positioning System - Device for the Visually Impaired Adjustable Table.
COMPACT MOBILE LIFTING DEVICE Team 3 Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Customer: FraunhoferAdvisor: Dr. Michael Keefe Mission: To design.
Presented by: Sana’a AL-Sulami. At the end of this lecture each student should be able to: 1 - Define transferring. 2- Enumerate the reasons of moving.
Lec#14.  Disable person needs equipment with the degree of impairment and desired degree of independence in area of personal care, mobility, leisure,
Shell Eco-Marathon FAMU-FSU 2014 Solar Car Milestone #2 Presentation Team #2.
Project Plan Reverse Engineering of a Radio Control Race Car
HISTORY MARKET The Development of Concept Companies into Entrepreneurial Business SEED STAGE & EARLY STAGE VENTURE CAPITAL Funding Mentoring UNIQUENESS.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Title page. 1. Identify the Problem Write a statement that answers the following questions. What are you trying to design? What are the requirement gaps?
Alternative Terrain Wheelchair Team # 1: Team ARROW Brent Fischer Mitchell Kane Eric Goyette Brennan McVeigh Chris MacKenzie.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
ME 4182 Mid Term Presentation Team Moondogs October 2, 2006 From left: Rahul Kirtikar, Chris Sampson, Chris Culver, Mike Widerquist, Elias Krauklis
Travel Website Enhancement Project Project Update First Name Last Name.
Basic Utility Vehicle (BUV) ME 462 Capstone Design Presentation Department of Mechanical Engineering, IUPUI December 14, 2005 Presented by: Tom Peters.
Software Engineering Management Lecture 1 The Software Process.
Team John Deere Weekly Status Report Week 4 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt Wade Burch.
Specifications for JOOLZ 409- based on the current prototype (as taken by AOK)
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Widget Project Update Team member1 Team member2 Team member3 Team member4 October 2015.
John Deere Team Weekly Status Report Week 2 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt.
1 Chapter 4 Marketing Research and Information Systems.
Team John Deere Weekly Status Report Week 5 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt Wade Burch.
Chapter 1-3 Test Review Driver’s Education. List the 5 restrictions you must follow while on you special learners permit.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Team John Deere Post-Midterm Review Week 8 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt Wade Burch.
STEM Problem Solving Process QuestionsResearch Possible Solutions Plan Development Correction to Solution Test Data Collection Refine Solution Deployment.
Systems Level Demo P15010: Arc Wheelchair Swing. Maggie Bates BS/ME Industrial & Systems Engineering Owen Breese BS Mechanical Engineering Elizabeth Cutolo.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Problem Solving Process Questions Research Development Plan Test Data Collection Refine Solution Deployment Plan.
ME 4182 Problem Statement, Design Partition, Project Plan, Task Assignments Team: GT Rack 2:00 pm September 7, 2005 Ryan Glenn Andrew Mrasek Japheth Nelson.
Conceptual Designs Team Icarus John Brooks Ivan Olendan Kyle Reno Endalk Tegegne David Wu.
Sophisticated Design Automatic Tailgate Week Four Deliverables September 12, 2001 Ted Akiskalos June Doan Tarek Elshazly Maggie Kim David Nimitz Sharon.
AME Senior Design Group E3: Hewlett-Packers February 7, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
City Travel Transportation Options Metro Chicago Bus, Commuter Trains, Taxis, Cars & Vans Kris Cichowski Jillian Beemer Rehabilitation Institute of Chicago.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Industrial Factors Affecting Design Mr.T. The Big Idea The “Industrial Designers Society of America” (IDSA) offers the most current standards to guide.
Cornerstone Free Will Baptist Church TECHNOLOGY STRATEGIC PLAN.
AUTOSTEERING. Equipment for automatically controlling the steering of a vehicle Device for the automatic steering control of any road vehicle without driver.
Southeast Engineering Center University of Illinois at Urbana-Champaign BENTLEY Handi-Gator Wheel chair storage team Brian Mullen Kyle Kremer Dan Santos.
PSY 104 Week 3 Assignment Outline and Annotated Bibliography Check this A+ tutorial guideline at
Software Engineering Management
Design Review Off-Road Wheelchair Project.
Design and modeling 10 step design process
Ten-Stage Design Process
Global Grid Forum GridForge
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Industrial Assessment Center Database
Ten-Stage Design Process
Introduction to New Product Development (Portfolio)
Garage Parking Indicator
Right Move, Right Place, Right Time
P15073: Autonomous IV Stand Michael Binger, Caitlin Conway, Nick Goddard, Nicholas Jacobs, Christina Pysher, & Ethan Whritenor Mike September 11, 2014.
Chapter 2 The Process of Design.
Mechanical Project Challenge
P17082 Biomechanical Elbow Model Build and Test Prep
Project Readiness Review P10029 – Air Muscle Artificial Limb
Presentation transcript:

John Deere Team Weekly Status Report Week 3 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt

Project: Modification of Gator for Handicap Accessibility Task assigned by John Deere is the open-ended modification of their six wheeled Gator Utility Vehicle to facilitate handicapped accessibility Two primary suggestions: wheelchair hoisting mechanism and controls modification

Review of Previous Action Items Continued contact with Bobby and other John Deere personnel to facilitate web conferencing with teams at other schools. Responsibility: Gary Twedt Informed that other school began school this week; the goal is to make contact with other schools this week or next week.

Review of Previous Action Items Continued updating of webpage with relevant documents. Responsibility: Gary Twedt Webpage has been updated to include the weekly deliverables from the first two weeks and relevant documents created by the previous team. Contact information has been updated for new team members.

Review of Previous Action Items Contact companies for information and advice on incorporating wheelchairs as the driver seat on the Gator vehicle and possibly obtain free equipment to test. Responsibility: Ben Spivey Met with a physical therapist from Emory’s Center for Rehabilitation Medicine and decided not to incorporate the wheelchair as a driver’s seat after discussion due to the customization needed for wheelchairs. Established connection with a representative from National Seating and Mobility. A folding wheelchair was donated by Diane Beckwith from ECRM.

Review of Previous Action Items Investigate preliminary design possibilities for implementation of steering wheel-controlled gas and brake pedals. Responsibility: Josh Ebeling Developed a couple ideas for a mechanical hand- controlled gas and brake system but decided that the wheelchair hoist was more suitable for this project. Team has decided to make the wheelchair hoist the primary objective but will leave open the possibility for designing handicapped-accessible controls permitted the primary objective is being met.

Review of Previous Action Items Investigate preliminary design possibilities for wheelchair hoisting mechanism. Responsibility: Mike Reno and James June Possibilities considered include placing the wheelchair on roll-bars mounted above passenger seats, placing it in the bed, or placing it in front of the passenger seat. Team has decided to move forward with a hoist located in the bed which will transfer the folded wheelchair into the bed behind the driver seat.

Problem Statement Product Idea: semi-automatic hoist that lifts wheelchair into bed while retaining a majority of bed storage space. Market Need: John Deere customers have requested an option to assist with transferring their wheelchairs into the Gator, a currently unavailable feature. Functional Goals: Lifting and lowering wheelchairs, positioning wheelchair, and collapsing hoist when not in use. Challenges: robustness under moment loading conditions, minimize usage of cargo space

Design Partition Grasping Function Challenges: wheelchairs disassemble when lifted, variance of wheelchair assemblies Folding Function Challenges: wheelchairs lifted by seat typically Lifting Function Challenges: moment loading, space limitations, power for automatic device

Design Partition Reverse Function Challenges: designing the device to reverse previously mentioned functions

Project Plan Project Responsibility Assignment Group Management: Gary Twedt CAD/FEA Support: Ben Spivey All members will be involved with concept development, drawing support, report writing, etc.

Project Plan Short-term Project Timeline 9/8- Complete 5 Conceptual Designs 9/15- Patent Search Completed Long-term Project Timeline 9/29- Mid-term Presentation 10/20- Engineering Analysis 11/24- Prototype Review Completed 12/1- Final Project Submitted

Current Action Items Conduct patent/product search for products similar to wheelchair hoist.Responsibility: All team members Develop at least five feasible concepts with written description, sketches, and analysis of advantages and disadvantages.