John Deere Team Weekly Status Report Week 2 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt.

Similar presentations


Presentation on theme: "John Deere Team Weekly Status Report Week 2 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt."— Presentation transcript:

1 John Deere Team Weekly Status Report Week 2 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt

2 Project: Modification of Gator for Handicap Accessibility Task assigned by John Deere is the open-ended modification of their six wheeled Gator Utility Vehicle to facilitate handicapped accessibility Two primary suggestions: wheelchair hoisting mechanism and controls modification

3 Preliminary Meeting Main contact: Bobby Henebry Parameters of project: $2000 Budget Modification of Gator for handicapped accessibility Parallel projects: UIUC – Seat/Suspension altered to slide out

4 Project Bids: Possible Modifications Bid 1: Hoisting Mechanism Utilization of a pneumatic or otherwise mechanical hoisting mechanism to move wheelchair from ground to vehicle bed Bid 2: Controls Modification Integration of existing gas and brake control pedals into an apparatus designed to be operated totally by hand

5 Project Bids: Possible Modifications (continued) Bid 3: Wheelchair Integration Modification of the Gator to allow the wheelchair to travel up a ramp and act as the drivers seat Bid 4: Bed Modification Modification of bed to raise and lower in order to place the wheelchair (via hoisting mechanism) below the bed, causing no loss of available loading space

6 Project Bids: Possible Modifications (continued) Bid 5: Storage Rack Addition of a storage rack somewhere along the body of the Gator, allowing storage of the wheelchair with no loss of cargo space Bid 6: Wheelchair Modification Modification of existing wheelchair design to include a removable seat, allowing seat to be moved into position as a drivers seat

7 Project Bids: Possible Modifications (continued) Bid 7: Controls Kit Design of a modified controls system that can be added onto existing Gator design as a kit to be sold separately Bid 8: Roll Over Protective Structure (ROPS) – addition of a “roll bar” to protect passengers as well as facilitate the entrance of the vehicle by handicapped persons through the use of handles on the structure

8 New Action Items Continued contact with Bobby and other John Deere personnel to facilitate web conferencing with teams at other schools. Responsibility: Gary Twedt Continued updating of webpage with relevant documents. Responsibility: Gary Twedt

9 New Action Items (continued) Contact Handicapped Driver Services, Inc. for information and advice on incorporating wheelchairs as the driver seat on the Gator vehicle. Responsibility: Ben Spivey Contact wheelchair company through contacts in order to possibly obtain free equipment to use and test with. Responsibility: Ben Spivey

10 New Action Items (continued) Investigate preliminary design possibilities for implementation of steering wheel-controlled gas and brake pedals. Responsibility: Josh Ebeling Compile information into weekly progress report. Responsibility: Josh Ebeling

11 New Action Items (continued) Investigate preliminary design possibilities for wheelchair hoisting mechanism. Responsibility: Mike Reno and James June