- CTF3 Collaboration Technical Meeting, 21-23 January 2008 - TBL BPM Electronics: Amplifier Status and Future Work Gabriel Montoro (1), Antoni Gelonch,

Slides:



Advertisements
Similar presentations
Television 1 Jess UEAB2006 Video IF Amplifier.
Advertisements

Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Experience of the Spanish collaboration with TBL F. Toral on behalf of the Spanish Collaboration with TBL CERN, CTF3 Collaboration Technical Meeting, 6/5/2010.
The EMMA Turn-by-Turn BPM System A. Kalinin ASTeC Daresbury Laboratory STFC EMMA Commissioning Workshop Daresbury Laboratory, 21 May 2009.
J.J. García-Garrigós Septiembre /09/2008.
BPS Location in CTF3/CLEX Area Mechanics with PCB Electronics Test Results BPS Linearity Error A linear fit of the wire test measures was done (left) for.
The Mica Sensing Platform Alec Woo Jan 15th, 2002 NEST Retreat.
ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.
LAr Frontend Board PRR Introduction 1.Overview of FEB functionality 2.FEB performance requirements 3.Development and evaluation of FEB 4.Organization of.
UPC participation in the development of BPMs for the TBL of the CTF3 Yuri Kubyshin WORKSHOP ON THE FUTURE LINEAR COLLIDER Gandía, December 3, 2005.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
PH4705/ET4305: Instrumentation Amp Our sensor will be connected to some kind of measurement system either directly, diag. 1, or as a bridge circuit diag.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
Computer Based Data Acquisition Basics. Outline Basics of data acquisition Analog to Digital Conversion –Quantization –Aliasing.
15. CBM Collaboration Meeting, GSI, Darmstadt, April 12–16, 2010 Status of Front End Electronics N-XYTER PCBs & Power Supply Volker Kleipa, GSI Darmstadt.
RITEC MEDARS MULTIPLE EMAT DRIVER AND RECEIVER SYSTEM Your Logo Here Drive Phased Arrays of EMATs at high powers.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
CTF3 BPMs October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 1.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
FOPI RPC-FEE specs and performance Mircea Ciobanu CBM collaboration meeting March 9-12, 2005 GSI-Darmstadt.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Technical notes about Anti aliasing differential filter- november 2014 R. Assiro - P.Creti.
By: Uriel Barron Matan Schlanger Supervisor: Mony Orbach Mid-Semester Review Spring 2014.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
- CTF3 Collaboration Technical Meeting, 27th Jan BPS amplifier for TBL Gabriel Montoro*, Yuri Koubychine, Antoni Gelonch Universitat Politècnica.
BI day /12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.
TBL BPMs: electronics Antoni Gelonch, Yuri Kubyshin, Xavier Millán, Gabriel Montoro CTF3 Collaboration MeetingCERN, January 16-17, 2007 In collaboration.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
State Scientific Center of Russian Federation Institute for Theoretical and Experimental Physics ( ITEP )
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Beam diagnostics developments at LAPP: Digital part CTF3 Collaboration Meeting Louis Bellier, Richard Hermel, Yannis Karyotakis, Jean Tassan,
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
Submarine Sonar Detection
An Inductive Pick-Up (IPU) for Beam Position and Current Measurement
BPM stripline acquisition in CLEX Sébastien Vilalte.
Gustavo Cancelo Analysis of the phase shift error between A and B signals in BPMs BPM project.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
FBCT experience at Desy Presenter: Matthias Werner, DESY At CERN Workshop: „Improving the accuracy of the BCT measurements in the LHC“ January 2011.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
CTF3-CLEX 12 July 2006 A. Faus-Golfe1 BPM´s for TBL IFIC group: A. Faus-Golfe, P. Modesto Mechanics UPC group: Y. Kubyshin, G. Montoro, A. Gelonch Electronics.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Duarte December th 2009 LHCb upgrade meeting Tests Front-end Status  Necessity.
G.F. Tassielli - SuperB Workshop XI LNF1/11 02/12/2009 Status report on CLUster COUnting activities G. F. Tassielli on behalf of CLUCOU group SuperB Workshop.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Design of the 64-channel ASIC: update DEI - Politecnico di Bari and INFN - Sezione di Bari Meeting INSIDE, December 18, 2014, Roma Outline  Proposed solution.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
- CLICK WORKSHOP, October BPM for TBL: status of the amplifier Gabriel Montoro*, Antoni Gelonch, Yuri Kubyshin Universitat Politècnica de.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Current Monitor Group (1606) Maya Dubrow Barath Parthasarathy Andrew Pikul Jason Stock.
EUROTeV Diagnostics WP5
WEBENCH® Coil Designer
Calorimeter Mu2e Development electronics Front-end Review
DIGITAL SIGNAL PROCESSOR LNR-26 [LINEA RESEARCH]
Analog FE circuitry simulation
Calorimeter Upgrade Meeting
> 50 dB ≤ 500 MHz Non-intercepting beam position measurement
Observed CE/RE Failures in the Display Product CE(Conducted Emission )
10k 20k Vin Vout H3 What is the gain?
Current Monitor Group (1606)
Presentation transcript:

- CTF3 Collaboration Technical Meeting, January TBL BPM Electronics: Amplifier Status and Future Work Gabriel Montoro (1), Antoni Gelonch, Youri Koubychine Universitat Politècnica de Catalunya (UPC) (1) This work has been supported by the Spanish Government (MEC) under project FPA E

- CTF3 Collaboration Technical Meeting, January General scheme of the analog head electronics Digitizer Previous design did by M. Gasior - The signals (V+,V-, H+ and H-) sensed by the IPU must be processed in order to obtain the signals difference and sum before being digitized. - It must work as a digitizer front-end.

- CTF3 Collaboration Technical Meeting, January Tentative parameters of the BPMs for the TBL BPM analog bandwidth (BPM with associated electronics) 10 kHz -100 MHz (200 MHz is highly desirable) Beam position range of interest +/-5 mm horizontal and vertical Beam aperture diameter22.5 mm Overall mechanical length< 100 mm Number of BPM’s in TBL 16 Resolution at maximum current <5  m Overall precision <50  m The BPM design for the DBL by M. Gasior cannot be applied directly. Modifications are required: a)The dimensions of the IPU should be reduced b) The amplifier bandwidth should be increased (desired up to 200 MHz) Typical radiation levels <1000 Gray/year (or 100 Krads)

- CTF3 Collaboration Technical Meeting, January H V ∆H ∆V ∑ Inductive pick-up Analog front-end electronics Mechanics IPU electronics Amplifier

- CTF3 Collaboration Technical Meeting, January BPM Analog amplifier for the TBL Work done: 1.Specifications of the interface between the analog amplifier and the digitizer (developed by LAPP researchers) have been defined. 2.Design and schematics of the amplifier. 3.CAD design of the PCB and manufacturing. 4.Building and some tests in the UPC lab. 5.First tests in CERN.

- CTF3 Collaboration Technical Meeting, January Specifications of the interface between the analog amplifier and the digitizer The following information was obtained from the LAPP group: –The analog outputs must be bipolars. –Levels: +-0,75V max. –The power and control connector pinout has been determined. –The signal output must consist in 3 double (balanced) signals: 1 sum and 2 differences.

- CTF3 Collaboration Technical Meeting, January Schematics done according to the previous specifications

- CTF3 Collaboration Technical Meeting, January The CAD design of the PCB has been also finished

- CTF3 Collaboration Technical Meeting, January The Bill Of Materials (BOM)

- CTF3 Collaboration Technical Meeting, January The 6-layers manufactured PCB TOP BOTTOM

- CTF3 Collaboration Technical Meeting, January The most critical components: IC amplifier Rad-hard wideband IC amplifier: THS4508 (manufactured by TI and tested by up to 100 Krads). Status: We have received some samples from AVNET-SILICA (a TI distributor). It’s possible to buy this IC online at Farnell distributor website.

- CTF3 Collaboration Technical Meeting, January

The most critical components: regulators RHFL4913 (positive regulator). Tested up to 100 Krads by the manufacturer, ST. RHFL7913A (negative regulator). Tested up to 100 Krads by the manufacturer, ST. Status: These IC’s are manufactured by ST. The RHFL4913 and the RHFL7913A can be obtained with the help of CERN (available at CERN store): these regulators are considered to be used in the ATLAS experiment.

- CTF3 Collaboration Technical Meeting, January BPM Amplifier: UPC Lab tests

- CTF3 Collaboration Technical Meeting, January UPC Lab. tests: Testing one channel - Maximun gain of each stage: 10 - Measured bandwidth: up to 200 MHz. - Input impedance of: 50 ohms ? (It will require a fine measurement and tunning).

- CTF3 Collaboration Technical Meeting, January First CERN testings: 10th December 2007 UPC Amplifier + CERN test-bench Thanks to Lars Soby for his collaboration !!! Amplifier frequency response (left: low gain, right: high gain)

- CTF3 Collaboration Technical Meeting, January Results The results, afther the testings in CERN, show that the amplifier is accomplishing the main electronic requirements: –The gain (up to 10 or less) is OK. –The bandwidth (up to 200 MHz) is OK. –The output level can be accomplished: OK. … but there are some improvements to do: –Some input impedance decoupling was detected and must be adjusted to match 50 ohms. –Some delay diferencies between channels must be compensated. –The gain must be adjusted to meet the real IPU signal levels.

- CTF3 Collaboration Technical Meeting, January Future work-project We have presented (last december) a project to the Spanish Ministry to request a Grant for finishing the amplifiers: to build 16+2 (for replacement). Our first scheduled action is to build 2 amplifiers during the first half (March ?) of 2008 (now, we have 1 quasi- finished).

- CTF3 Collaboration Technical Meeting, January TBL BPM Electronics: Amplifier Status and Future Work Gabriel Montoro (1), Antoni Gelonch, Youri Koubychine Universitat Politècnica de Catalunya (UPC) (1) This work has been supported by the Spanish Government (MEC) under project FPA E