Project ALPTER - ‘Terraced landscapes of the alpine arc’ EU Programme Interreg IIIB Alpine Space Castasegna, 18 th May 2006 Transnational workshop Location:

Slides:



Advertisements
Similar presentations
Guidelines for Basic Geographic Data DA AIP Phase 2 Kickoff Workshop September 25-26, 2008 Boulder, Colorado, USA Yoshikazu FUKUSHIMA Secretariat.
Advertisements

WP4 – 4.1 and 4.2 Preparatory activities for the creation of the WATERMODE permanent network 1 Technical Committee Meeting Venice, June 24-25, 2010 VENETO.
Project Natural and Technological Hazards in Europe Philipp Schmidt-Thomé
Flood Loss Assessment APFM methodology
Process – Resource Evaluation Design and perform a set of geographically based resource assessments Develop a methodology for prioritizing land according.
General Director: CARLO EMANUELE PEPE Technical Area Director: PAOLO ROCCA Dept. of Belluno Director: RODOLFO BASSAN Dept. of Belluno Director: RODOLFO.
Success factors in grant applications and research projects: seminar.
PROPOSED PRIORITIES FOR SCIENCE AND COLLABORATION OCTOBER 2012.
The Single Market Act: What's in it for Europe's regions and cities? Forum of the Committee of the Regions Brussels, 30 November 2010 Workshop 2: Coming.
WETHYDRO Centre of Excellence in Wetland Hydrology Contract number: EVK1-CT Duration: Coordinator: prof. Stefan Ignar Department of.
Jone Engelsvold (Former) Project officer/Norwegian co- ordinator North Sea Trail.
A Strategy for the Enhancement of the Alpine Space Typical Products Alpine Space Summit Work Group meeting: A Strategy for the Enhancement of the Alpine.
European Spatial Planning: Adapting to Climate Events Funded by the North West Europe INTERREG IIIB Programme and the Office of the Deputy Prime Minister.
Institute of Landscape Development, Recreation and Conservation Planning ALPTER Terraced Landscapes in the Alpine Arc Austria Institute of Landscape Development,
Project title / Field of expertise Adressed challenge/PPP Adressed topic in working programme Thematic brokerage workshops EU Brokerage Event on Kets in.
Science & Technology Department University of Peloponnese Socrates Comenius 1 School partnerships Selection 2005 Bari October 2005 Project Activities.
Project ALPTER - ‘Terraced landscapes of the alpine arc’ EU Programme Interreg IIIB Alpine Space Venice, 20 th January 2005 Project Kick-off Meeting Location:
Smart specialisation, integrated strategies and territorial cohesion: tension or synergies 27 September Brussels ESPON 2013 Programme: The territorial.
CHIPP Workshop on Detector R&D June - University of Geneva Common R&D for astroparticle physics: Activities of ApPEC and ASPERA Bernard Revaz and.
Eurosion and Conscience projects - brief overview Tom Bucx (Deltares) 9 June 2011 EEA Expert meeting Methods and tools for assessing.
LIFE08ENV/IT/428 PROJECT SOILPRO Action 1: Project Management and Monitoring Action 2: Development of software for the application of the soil monitoring.
Alpine Space Prospective Study T. Bausch (D) T. Dax (A) U. Janin Rivolin (I) F. Parvex (CH) S. Praper (SLO) M. Vanier (F) © INTERREG IIIB The.
A Strategy for the Enhancement of the Alpine Space Typical Products Alpine Space Summit Work Group meeting: A Strategy for the Enhancement of the Alpine.
JCN, Justice Cooperation Network European Treatment and Transition Management of High Risk Offenders Tallin, 13 March 2013 Second Steering Committee Meeting.
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP QUALITY MANAGEMENT PLAN Florence, January 2008.
Project ALPTER - ‘Terraced landscapes of the alpine arc’ EU Programme Interreg IIIB Alpine Space Transnational meeting - Sondrio, 3 rd /4 th November 2005.
“ BIRD Project“ 1 Broadband Access, Innovation & Regional Development” Broadband Access, Innovation & Regional Development” Project Description Ulrich.
OPPORTUNITIES IN THE NORTH SEA INTERREG IVB PROGRAMME FOR ENVIRONMENTAL PROJECTS Jon Jordan UK Contact Point Peterborough - October 2007.
Local endogenous development and urban regeneration of small alpine towns ‘ ‘ ’ ’ A trans-national project co-financed by ERDF funding in the framework.
Mats Wallin Swedish Univ. of Agricultural Sciences Dept. of Environmental Assessment Catarina Johansson Swedish Environmental Protection Agency Development.
A Strategy for the Enhancement of the Alpine Space Typical Products Alpine Space Summit Work Group meeting: A Strategy for the Enhancement of the Alpine.
Topic Forums Work to address issues at topic level Water quantity (instream and “out of stream”) Habitat & land use (protection and restoration) Water.
Today's Alps tomorrow: risks, resources and opportunities Side Programme – Risk Management Tuesday 20 th June 2006, 9:00 – 11:00 CatchRisk - mitigation.
ReACCt Regional Action facing Changing Climate Dennis Ehm Academy for Spatial Research and Planning (ARL), Germany BSR INTERREG IV B Project Idea.
Environment DPD Issues and Options Consultation (31 January to 14 March 2011) John Dixon Spatial Planning Officer.
DIS-ALP DIS-ALP D isaster I nformation S ystem of Alp ine Regions DIS-ALP powered by Means of the European Regional Development Fund (ERDF)
1 Fiorella Coliolo, DTA 2015 EU Innovation Procurement event 28 October 2015, Paris EO and PCP in a Space Cluster Perspective.
Belarus Denmark Estonia Finland Germany Latvia Lithuania Norway Poland Russia Sweden The Baltic Sea Region INTERREG III B Programme After EU Enlargement.
Aberdeenshire Land Use Strategy Pilot James Davidson, Aberdeenshire Council NESAAG, Woodhill House, 05/11/14.
Proposal for NL presidency Historic overview Historic overview Activities in our environment Activities in our environment Workingplan Workingplan Proposal.
LESSON 13.4: HUNGER & MALNUTRITION Module 13: Global Health Obj. 13.4: Identify risk factors and effects of hunger and malnutrition.
Knowledge Direct Support SMART+ STRATEGIC EXCHANGE SMART+ Methodology for Strategic exchange of GPs for the improvement of SMEs innovation capacity Sevilla,
The EC Network of European national and regional funding authorities for RD&D in the field of H&FC The HYCO Action Groups: a tool to arrive at Trans-National.
Definition of a methodology to analyze terracing and terraced landscape:80 % Census on large scale: 15 % Elaboration of a common data sheet for analysis.
1 U.C. Pianificazione Territoriale e P.T.R.C. “ALPCITY” VENETO CASE-PROJECTS Renovation and optimum use of abandoned rural and productive buildings 2 0.
L ocal endogenous development and urban regeneration of small alpine towns ‘ ‘ ’ ’ A trans-national project co-financed by ERDF funding in the framework.
Project period: partners Budget: Euro Focus : Risk management, spatial development Trans-national capacity (exercises, training,
Research European Commission FP6-ERA.ppt15/10/01 1 Cooperation with Chile Current status No direct participation in FP4 and FP5 projects Participation.
Workshop on Census Cartography and Management - October World Population and Housing Census Programme United Nations Statistics Division.
EN Regional Policy EUROPEAN COMMISSION Upcoming events and news, Communication actions, success stories, evaluation, OPEN DAYS 2006 SFIT, 15 June 2006.
Agenda item 2.2 Progress on Target 1 Developments since CGBN of March 2012 CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
SCAN-ICT: the INDICATORS by Makane Faye Senior Regional Adviser for ICTs Regional Workshop on ICT indicators October 2004 Gaborone (Botswana)
Summary of the Submission of the United States On the development of a five-year programme of work on the scientific, technical and socio-economic aspects.
Irealp Status of the project. Chiavenna-Piuro Sondrio-Castione Study areas University of Milan Irealp.
Geography "Geography is a subject which holds the key to the future" Michael Palin.
5 Project funded by the Euro- Mediterranean Regional Programme for Local Water Management of the European Union DEVELOPMENT OF TOOLS AND GUIDELINES FOR.
Information Day and Partner Search Forum, 25 October 2001, Riga, Latvia The EU Interreg IIIB and Phare CBC programmes: Joint efforts for joint projects.
Old Neighbours – New Relations Workshop 09D03 „Multiregional co-operation – recipes for success“ Brussels 9th October 2007 R. Hummelbrunner (Graz, Austria)
Food and Agriculture Organization of the United Nations TCP/RER/3402 (D) Other issues and Workshop Evaluation Belgrade, Serbia Hotel Best Western M 19.
CARICOM WORKSHOP ON ENVIRONMENT STATISTICS St. Vincent and the Grenadines 7 th and 8 th April 2014.
ESPON Project Application and effects of the ESDP in the Member States
Name of Theme Park Your Name Class Period.
WP4 – Knowledge platform and communication
Scaldit: Action Plan 4. Communication and raising awareness
EU Strategy for the Alpine Region
Interreg IIIC Cohesion Forum
7th EU Research FP has ten themes defined in order:
Working Group 2C Organisational set-up
Implementing the ESPON 2013 Programme
A new Floods Working Group F
Presentation transcript:

Project ALPTER - ‘Terraced landscapes of the alpine arc’ EU Programme Interreg IIIB Alpine Space Castasegna, 18 th May 2006 Transnational workshop Location: Villa Garbald, Castasegna, Bregaglia Project scientific and management topics Luca Lodatti, Regione Veneto Scientific topics - GIS approach to terracements - Evaluation of risk and recovery Management topics - Questionnaire on agricultural production - Partners’ project workplan - Web-site translation - Project forum on terracements Next steps Project partners Regione VenetoRegione Liguria IREALP BOKU University University of LubjianaA.D.I. Regione Valle d’AostaRegione Bregaglia Other involved subjects IUAV - Univ. of MilanUniversity of Padua University of GenovaCERVIM

GIS approach to terracements Proposal for the structure of a GIS about terracements (from the project Data sheet) (from the project Data sheet) Layers Object Mapping Description with Height Geology Risk Water / Climate Land use Status Decay Historic use Access Re-use Property Unit for mapping:Morphological unit (?) Problems:Scale of measurement for some themes (geology, water, land use, decay, access) Project ALPTER - ‘Terraced landscapes of the alpine arc’ EU Programme Interreg IIIB Alpine Space

Evaluation of risk and aptitude to recovery MappingGeologyWater/ClimateLand use DecayHistoric useAccessProperty Final evaluation of key issues : - Risk menacing the area - Aptitude to recovery Two levels of evaluation: - General – Data sheet analysis - Detailed – GIS analysis Scientific workshop in October on methodology of evaluation Project ALPTER - ‘Terraced landscapes of the alpine arc’ EU Programme Interreg IIIB Alpine Space

Management topics: - Questionnaire on agricultural production (from Slow Food) - Partners’ project workplan - Partners’ project workplan - Web-site translation - Congress and forum on terracements - Congress and forum on terracements Project ALPTER - ‘Terraced landscapes of the alpine arc’ EU Programme Interreg IIIB Alpine Space

Next steps: - Partners’ project workplan - Project activities: - Land analysis - Plans for recovery - Questionnaire on agricultural production - Project meeting in October in Lombardy - Project forum in January Project ALPTER - ‘Terraced landscapes of the alpine arc’ EU Programme Interreg IIIB Alpine Space