Presentation is loading. Please wait.

Presentation is loading. Please wait.

Working Group 2C Organisational set-up

Similar presentations


Presentation on theme: "Working Group 2C Organisational set-up"— Presentation transcript:

1

2 Working Group 2C Organisational set-up
STRATEGIC CO-ORDINATION GROUP STEERING GROUP DG ENV (Chair), Austria (co-Chair), JRC PLENARY FORUM Forum on Characterisation Forum on Risk assessment Forum on Monitoring Forum on Status and trends 2005 Drafting Group Status / Trends Drafting Group Thresholds Drafting Group Ind. discharges Forum on research and standardisation

3 WG 2C workshop on “status and trends” – 18 October 2004
Invitation to provide elements for discussion in support of the BRIDGE project: common methodology for establishing threshold values (deadline: 15th September) – Discussion to be planned at the workshop MS invited to present experiences on status and trend evaluation (e.g. linked to investigations/permit procedures) Discussions on expected drawbacks linked to WFD provisions

4 Work programme 2005 Linking “drafting groups” to Plenary Forum discussions – 1 day ½ meetings (first ½ day: meetings of drafting groups (parallel sessions?) – followed by one day of forum meeting) Drafting groups (max participants) to be formed before the end of 2004 – Volunteers for the three defined topics should indicate their interest – Drafting group mandates to be finalised by the end of 2004 Regular briefings on the progress of the BRIDGE progress (to the Plenary Forum) Discussions of research and standardisation needs if appropriate

5 Provisional workplan Status & Trends: built up on outcome of the workshop of 18th October – Drafting group on afternoon, Plenary Forum on Thresholds: directly linked to BRIDGE – Drafting group on afternoon, Plenary Forum on Indirect discharges: information to be gathered from 80/68/EEC Directive implementation – Drafting group on , Plenary Forum on

6 Finally… Please provide
Summary report on presentations held at Risk Assessment Workshop – January 2004 Summary report on presentations held at this Monitoring Workshop Send to Philippe and/or Andi Scheidleder


Download ppt "Working Group 2C Organisational set-up"

Similar presentations


Ads by Google