2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.

Slides:



Advertisements
Similar presentations
Jiri Kvasnicka, EUDET meeting at DESY 1 Optical fibre calibration system Jiri Kvasnicka Outline Results from recent tests – LAB Test.
Advertisements

HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
LED calibration systems for CALICE hadron calorimeter June 11, 2011TIPP 2011, Chicago1.
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Ivo Polák SiPM needs short optical pulses
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak Institute of Physics (FZU), Prague June 11, 2011TIPP 2011, Kvasnicka1 The.
ECFA, JUN10, 2008Ivo Polak, IPASCR, Prague1 Electronics part of AHCAL calibration system ECFA meeting at Warszawa.
EUDET, OCT8 - 10, 2007 Ivo Polak, IoP Prague1 A fast LED driver prototype for HCAL calibration EUDET annual meeting at Ecole Polytechnique, Palaisau.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
DESY, DEC-2013Ivo Polák, FZU, Prague1 Activity on Adaptive power & Calibration at Prague Ivo Polák, on behalf of Prague’s group QMB1A update.
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
LED calibration systems for CALICE hadron calorimeter
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
2013 MAR 21Ivo Polák FZU Prague1 Tasks for AIDA SiPM Adaptive HV PSU AIDA subgroup Prague 2013 meeting Characterization of temperature influence to SiPM.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
DESY July 2, 2003J. Cvach: APD & preamp1 Checks of APD matrix & Prague 16ch. preamplifier 1.Cross talk between pixels 2.Homogeneity of response from pixels.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
CALICE ANL, MAR18, 2008 Ivo Polak, IPASCR, Prague1 A fast LED driver prototype for HCAL calibration CALICE meeting at ANL, USA.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
oct - 6Ivo Polák, FZU, Prague1 Calibration system for SiPM and LED notched fibre distributing system Ivo Polák, on behalf prague’s group
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak, Institute of Physics, Prague June 11, 2011TIPP 2011, Kvasnicka1 The CALICE.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
LED notched fibre distributing system Calibration system for SiPM
LED notched fibre system short HBU0 party with QMB6
A fast LED driver prototype for HCAL calibration
Baby MIND Collaboration Meeting #2
CALICE meeting 2007 – Prague
LED notched fibre system at AHCAL Calibration system for SiPM
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
A fast LED driver prototype for HCAL calibration
RPC FEE The discriminator boards TDC boards Cost schedule.
Scintillator HCal Prototype
Presentation transcript:

2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1 specifications 2.QMB1 with Toroidal inductor at PCB 3.Trigger distribution 4.Notched fibre light distribution systems 3x24 5.Resume

2011 Sept 14-16Ivo Polák, FZU, Prague2 QMB1 Quasi resonant Main Board –Modular system, 1 LED per board –Operation mode: DAQ + CANbus control stand-alone mode –LVDS Trigger distribution system –Variable amplitude, zero to maximum (~1Amp) smooth –Pulse width fixed to ~ 5ns (UV or blue LED) –Voltages and temperature monitoring –Size of PCB: width 30mm, depth 140mm

2011 Sept 14-16Ivo Polák, FZU, Prague3 Principal schema Larger inductor than the older QMB6

2011 Sept 14-16Ivo Polák, FZU, Prague4 Signal distribution at 30 x 140 mm^2 Two flat cables, Twisted pair for Trigger

2011 Sept 14-16Ivo Polák, FZU, Prague5 TRIGGER (T-calib) LVDS distribution to QMB1 Trigger from DAQ master slave Terminated 120ohm RX TX LVDS Up to slaves modules

2011 Sept 14-16Ivo Polák, FZU, Prague6 3D draw of QMB1 LED fibre PWR 15V and CANbus T-calib LVDS flat cable

2011 Sept 14-16Ivo Polák, FZU, Prague7 Mechanical layout of QMB1 Outer line: 30 (29) x 140 mm*2 4 mounting holes for M2.5 screw LED

2011 Sept 14-16Ivo Polák, FZU, Prague8 DESY test setup in November HBU2 DIF, PWR, CAL QMB1 T-calib from DAQ CANbus SPIROC2 PWR 15V combiner Notched fibres Single layer frame

2011 Sept 14-16Ivo Polák, FZU, Prague9 work at 2011 QMB1 (1-chanel LED driver): –Done Topology, PCB design Communicating bus (CAN) CPU (Atmel AVR) Trigger distribution (LVDS) Trigger delay canbe tuned by C trimmer (~10ns) 4 mounting holes for screw M2.5 Fibre(LED) position set to center of PCB –PCB in production + assembly –To be done Debugging in October/beginning of Nov Set of notched fibers, semiautomat machine under development –Set: 3*fibre with 24 notches, creating a line of 72 notches. –3 sets will be delivered in November 2010 Idea

2011 Sept 14-16Ivo Polák, FZU, Prague10 Notches at one long fibre (24notches total) Notch # 4Notch # 24 last one, biggest Light coupled from tap LED side Taken on microscope with zoom ~50

2011 Sept 14-16Ivo Polák, FZU, Prague11 Notched fibres external company Safibra preparing the setup (semiautomat) to produce precise notches in the fibres We will have prototype fibres made by new technology in November, we assume less spread of the light at taps (<15% ). as backup, we have old fibres (12 notches, spread <10%) in hand for November test with HBU at DESY illuminated by Green laser 24 notches

2011 Sept 14-16Ivo Polák, FZU, Prague12 Resume QMB1 is in production stage –First 4 samples promised in October –Coupling to fibre to be defined QMB1 in hand with fw - expected in autumn 3 sets of Notched fibres scheduled to be delivered in November semiautomatic machine is under development

2011 Sept 14-16Ivo Polák, FZU, Prague13 Distribution of light: Notched Fiber Light is emitted from the notches The notch is a special scratch to the fiber, which reflects the light to the opposite direction The size of the notch varies from the beginning to the end of the fiber to maintain homogeneity of the light, which comes from notches First notchMiddle notchEnd position notch Emission from the fiber (side view) Iluminated by Green laser 24 notches

2011 Sept 14-16Ivo Polák, FZU, Prague14 Notched fibre illuminated by green laser pointer