GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS 4.1.9 I&T Engineer B. Grist.

Slides:



Advertisements
Similar presentations
1 HYDROSTATIC TESTING Approved for Public Release.
Advertisements

USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectI&T&C Particle Beams - Pre PDR Presentation– Oct. 2, 2001 Gary Godfrey1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS
GLAST LAT Project Lessons Learned / Needed Procedures/ Documentation Control – October 23, 2003 B. Grist1 Lessons Learned / Needed Procedures / Documentation.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
Quality Assurance/Quality Control Policy
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
From Research Prototype to Production
GLAST Large Area Telescope:
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 1 GLAST Large Area Telescope: Performance & Safety Assurance WBS: 4.1.A.
Safety and Mission Assurance Lockheed Martin Space Operations (LMSO) Science, Engineering, Analysis, and Test Operation Safety and Mission Assurance Activity.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
Accelerator Readiness Review October 31, 2006
I&T&C Organization Chart
THEMIS Mission Assurance
Mechanical Integration
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope:
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Integration and Test Organization Chart
GLAST Large Area Telescope:
Integration and Test Organization Chart
Integration and Test Organization Chart
LAT Environmental Test Planning and Design Review
Introduction and Overview
Integration & Test Instrument Operations Coordination
DOE Review of the LCLS Project October 2006
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS Reliability & QA D. Marsh WBS Environmental Test Manager M. Lovellette Online Manager R. Claus Science Verification, Analysis, and Calibration E. do Couto e Silva Particle Test Manager G.Godfrey Integration, Facilities, Configuration, and Test O.Millican (Acting) Instrument Operations Coordinator S. Williams Mechanical Ground Support Equipment TBD I&T Preparation EM1 Model I&T&C Calibration Unit I&T Flight LAT I&T Mission I&T Support I&T Preparation EM1 Model I&T&C Calibration Unit I&T Flight LAT I&T Mission I&T Support I&T Preparation Flight LAT I&T Mission I&T Support I&T Preparation EM1 Model I&T&C Calibration Unit I&T Flight LAT I&T Mission I&T Support

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh2 Performance & Safety Assurance Requirements Summary –The LAT I & T activities will be conducted in accordance with: GLAST LAT MAR, GSFC 433-MAR-0001 GLAST LAT PAIP, LAT-MD GEVS-SE, Dated June 1996 GLAST LAT System Safety Program Plan –The LAT ground data system assurance program will be developed in accordance with LAT MAR/PAIP –Lessons learned from other programs will be utilized through-out the program

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh3 Performance & Safety Assurance Quality Assurance Activities –Process control system –Test and inspection of hardware & software –Training and certification of personnel –Measuring and test equipment calibration –Review test plans and procedures –Review quality program records –Monitor LAT Team Member I & T activities –Contamination Control –Configuration control as detailed in the LAT Configuration Management Plan

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh4 Performance & Safety Assurance I & T Controls –Items maintain identity by drawing number and serial number –Material Review Board action required for non-conforming material –I & T processes continually monitored –Controlled storage for assemblies in I & T –Contamination control Facility certified by an outside organization Class 10,000 maintained by monitoring and cleaning Continuous monitoring for particle counts and hydrocarbons Surface cleanliness verification of flight hardware by optical witness samples, particle fallout plates, and/or tape lifts Use of cleanroom garments and equipment required –Calibration and QA monitoring of critical equipment, tooling, jigs, and fixtures

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh5 Performance & Safety Assurance Deliverable Documentation –Nonconformance Reports –Failure Analysis Reports upon request –Material Review Board actions if cost, schedule, or performance affected –Verification Test Plan Performance Environmental Verification Matrix –Test Procedures and Reports –Contamination Control Plan –Hazard analyses as required

GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh6 Performance & Safety Assurance Test and Inspection Summary –Test and inspection performed on all assemblies –System of controlling and approving documents in place –Specific procedures govern system level testing –Records of test and inspection are maintained –Use of workmanship standards –Use of nonconformance reporting system