Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

QuadEM: EPICS Software for Fast Electrometers for Beam Position Monitors Mark Rivers GeoSoilEnviroCARS, Advanced Photon Source University of Chicago.
Stephanie Allison/John Dusatko EPICS Collaboration Meeting May 1, Timing and Event System for the LCLS Electron Accelerator*
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Patrick Krejcik LCLS April 29, 2004 Breakout Session: Controls Physics Requirements Overview P. Krejcik.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
Dayle Kotturi Controls April 29, 2004 Controls Overview LCLS Facility Advisory Committee April 29-30, 2004 Outline Status.
Dayle Kotturi LCLS Diagnostics and Commissioning Workshop September 23, 2004 LCLS Controls and Data Acquisition September 23, 2004.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
6 Oct 2003Vince Pavlicek1 Make a BPM out of a Damper?
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
Stephanie Allison LCLS Controls Software Meeting Dec 6, 2007 How To Set Up for the Event System on an IOC with an EVR(s) Assumes.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Stephanie Allison LCLS IOC Meeting Jul 18, 2008, Jan 21, 2011 Beam Synchronous Acquisition for IOC Engineers Definition/Requirements.
Hamid Shoaee LCLS Facility Advisory Committee October Control System Overview Hamid Shoaee for the LCLS Controls Group.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
LCLS Commissioning & Operations High Level Software
RF acceleration and transverse damper systems
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Introduction Functional Requirements (Stephanie) SLC Executive (Diane)
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Photon beamline crates
LCLS Commissioning & Operations High Level Software
Event Displays for EVR IOCs
Work Update J. Rzepiela 8/17/10.
SLC Aware IOC BSAC* Facility Design Review July 14, 2005
LCLS Event System - Software
Timing and Event System for the LCLS Electron Accelerator
Status of muon monitor R&D and construction
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
High Level Physics Applications for LCLS Commissioning
Beam Synchronous Acquisition on IOC
Breakout Session SC5 – Control Systems
Linac Diagnostics Commissioning Experience
EVG-to-EVR Data Transfer (Dayle Kotturi)
Breakout Session: Controls
quadEM: New Beam Position Monitor & Electrometer Hardware and Software
Timing and Event System Status DOE Review of the LCLS Project SC5 - Controls Systems Breakout Session S. Allison, M. Browne, B. Dalesio, J. Dusatko,
Breakout Session SC3 – Undulator
Presentation transcript:

Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first. The first priority are: 1. Cavity BPM prototype 2. CSR bunch length monitor Second priority 3. beam loss monitors 4. Wire scanner motion control Third priority 5. image acquisition Discussion on the needs for each of these with regard to: The SLC aware IOC Timing Gated data acquisition Motor control

BPM Testing 3-cavity BPM test at FFTB –Down-mixed signal read into something like a Echotek VME card –Needs timing triggers to tell when beam arrives –Additional trigger to control when a diagnostic signal is sent to the BPM –Need to be able to correlate the new BPMs with existing BPMs in the SCP Use SCP CRR plot when PNET and EVR available Record pulse id on CRR plot only?

CSR bunch length monitor Needs beam timing trigger Gated ADC required to read signals from pyroelectric detectors, <8 channels –Need to be able to correlate the new GADCs with existing BPMs in the SCP –Standardize on GADC type(s). At least 2 types: charge integrating and sampling. Interferometer will need stepping motor control and limit switches of mirror position plus readback of position. –Use standard stepping motor and controller etc –Position read back into GADC Need a method of starting and stopping a scan –For test stand could use CRR – PV –Long term use control device (aka magnet) job Mirror position during the scan needs to be correlated with the GADC signals and with SCP BPMs

beam loss monitors Photomultiplier tube, at least 2. –HV supply –Signal readback into a GADC –Beam timing Signal from GADC to be correlated with BPMs from SCP

Wire scanners Stepping motor control, start/stop scan Limit switches Position readback Data acquisition from beam loss monitors –synchronized

Image acquisition Camera to ethernet bridge Beam trigger to camera for single snapshot Trigger to retrieve image from camera Client CPU software to retrieve and process image with the timestamp from the same trigger.