Presentation is loading. Please wait.

Presentation is loading. Please wait.

SLC Aware IOC BSAC* Facility Design Review July 14, 2005

Similar presentations


Presentation on theme: "SLC Aware IOC BSAC* Facility Design Review July 14, 2005"— Presentation transcript:

1 SLC Aware IOC BSAC* Facility Design Review July 14, 2005
*Beam Synchronous Acquisition & Control Last updated July 20, 2005

2 Block Diagram

3

4 BSAC Facility Initialization
Init BSAC EPICS Facility States Init BSAC EPICS Facility Constants Init SLC Thread Data Collection Structure

5

6

7 bsacAsync Thread

8 Init SLC Thread Data Collection Structure

9 SCP Request Message (bsacHdlr)

10 Measdef Setup Dbput to EPICS Facility MDEF Records
Setup Data Reply Collection Structure Dbput to EPICS Facility “GO$MD” record SCAN=IO_INTR, for every device, every unit participating in this measdef Store MDEF timeout value for bsacAsync

11

12

13 Large Data Reply Message Buffer(s) (bsacHdlr)

14 Set Scan = IO_Intr for each unit participating in mdef

15 EPICS Pulse ID Processing Flow (120 Hz)

16 EPICS Processing Flow (120 Hz)

17 BPMS Processing Flow (Unit 1, MDEF 1)

18

19

20

21

22

23 SCP Data Reply Message(s) (bsacHdlr)


Download ppt "SLC Aware IOC BSAC* Facility Design Review July 14, 2005"

Similar presentations


Ads by Google