MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.

Slides:



Advertisements
Similar presentations
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
MICE CM31 wrap-up Alain Blondel 1 MICE CM31 Wrap-up 1.The good news 2.The achievements and decisions made 3.The questions 4.Looking forward to MICE CM32.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE FAC Alain Blondel 1 Summary of run meeting 8 August 2011 Present: Andy Nichols Tim Hayler Pierrick Hanlet Gail Hanson Linda Coney Victoria.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
MICE Project Board Alain Blondel 1 MICE running Preamble ISIS running Step I Step(s) IV Step V (and VI)
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
CMPB Alain Blondel 14 April STATUS OF MICE.
Alain Blondel MICE Funding Agency Committee MICE status report Most of the technical progress has been covered in the open session except the.
MICE Project Board MPB Alain Blondel 1 MICE Project board 3 MICE Status Responses to MPB2 recommandations.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
1 PM report International & UK programmes Overview Reconstructing the schedule The UK Project Management team Progress with major subsystems Substation.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
CM37 Alain Blondel step IV physics success 1 « STEP IV operations : Physics »
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
MICE CM 30 Collaboration Board Summary. Agenda 1. Approval of minutesBooth 2. Spokeʼs remarks & EB reportBlondel 3. Strathclyde request to join MICEKevin.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Goals & Status MICE CM 33 Thanks go out to the organizers: Paul Soler, Ryan Bayes and Valerie Flood.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM29.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
1 PM report Schedule comment Coupling magnets Major staffing concerns Andy Nichols, STFC, UKNF/MICE PSAG,
MICE CM 29 Collaboration Board Summary. Agenda 1.Intro 2.Approval of minutesBooth/Bross 3.Spokeʼs remarks & EB reportBlondel 4.PM reportNichols 5.US magnet.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE FAC meeting MICE spokesperson report.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE CM33 – system test? Alain Blondel 1 CM 33 wrap-up TOWARDS CM34.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
(one of the) Request from MPB
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.
MICE CM34 Wrap-up Alain Blondel 1 CM 34 wrap-up TOWARDS CM35.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Status of the MICE Construction Project
MICE CM31 Schedule summary
Presentation transcript:

MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status

MICE CM30 Goals of the Meeting Alain Blondel 2 -- Steve Gourlay (LBNL head of Accelerator and Fusion Research Div.) at this CM now in charge of the Spectrometer solenoids and Coupling Coil magnets. -- MICE magnet coordination established: Mike Courthold (RAL) and Roy Preece (RAL) -- MICE PM Andy Nichols more available: -- MICE-UK project manager appointed (Alan Grant, DL) -- MICE schedule review May 2011 in presence of internal reviewers Atkinson(DL), Kerby(FNAL), Nessi(CERN) Strongly endorsed having a significant accomplishment before long ISIS shutdown -- Gail Hanson (UC Riverside) will support PM as MICE schedule coordinator others: -- Linda Coney takes over from JSGraulich as Online Group Coordinator -- Yordan Karadhzov takes over from JSGraulich as DAQ expert -- Adam Dobbs takes over from M. Apollonio as beamline expert I. what we told the MICE project board

MICE CM30 Goals of the Meeting Alain Blondel 3 As requested by MPB report concentrated on schedule issues Punchline: 1.STEP IV schedule established -- much progress on SS, now plan and milestones -- MICE decided to skip step II and III  run step IV in October’12-March’13 2. Step V -- “Aspirational”: have a significant running of step V before the long ISIS shut down Aug 2014-Feb Priority over more step IV running Depends critically on RFCC delivery Today: will review major schedule drivers -- Magnets: Spectrometer solenoids, Coupling coils, Focus coils -- LH2 system -- RF power and delivery system  construction schedule -- MICE running Most of what is shown will be discussed at MICE CM30 in Oxford 6-9 July’11 so it is not totally “MICE-official” (although main decisions discussed at MICE TB,VC and EB)

MICE CM30 Goals of the Meeting Alain Blondel What MPB told us -- congratulations Indeed lots has been achieved! -- worries Manpower is thin, and many milestones need to be passed  they will watch us! Can we *really* run step V in 2014? -- recommendations ‘Mother’ Project Board…

MICE CM30 Goals of the Meeting Alain Blondel 5 Some recommendations: Recommendations (MICE is asked to report at the next MPB meeting on these) -Engage Chinese manufacturing partners during CC magnet testing and cryostat construction in the US - Monitor 2011 Milestones and report to the next project board on their follow up and achievement - Encourage project to evaluate more thoroughly step IV running - Continue to recommend priority to be given to RF cavity tests well before commissioning step V to reduce project risks - Recommend early soak test of RF power sources - Recommend incorporating enough instrumentation to minimize occurrence and consequences of system-wide quench NB we don’t have to do everything they say, but we have to take it seriously and report on it.

MICE CM30 Goals of the Meeting Alain Blondel 6 GOALS of the meeting

MICE CM29 concluding remarks Alain Blondel 7 Towards next meeting in Oxford -- MICE paper submitted -- SS repair under way -- AFC wound – or winding -- MICE solidly rescheduled -- magnetic measurement plan ready -- Substation installed and running -- MICE Software fully MAUSed -- MOM handover updated -- three layers of EMR under debugging in MICE beam and much more from concluding remarks at CM29

MICE CM29 concluding remarks Alain Blondel 8 Towards next meeting in Oxford -- MICE paper submitted -- SS repair under way -- AFC wound – or winding -- MICE solidly rescheduled -- magnetic measurement plan ready -- Substation installed and running -- MICE Software fully MAUSed -- MOM handover updated -- three layers of EMR under debugging in MICE beam and much more from concluding remarks at CM29 Lets update our status, Understand the critical points and act if needed my color coding:

MICE CM30 Goals of the Meeting Alain Blondel 9 MUCH PROGRESS

MICE CM30 Goals of the Meeting Alain Blondel 10 RF and power supply testing 24 June System pushed to 1MW RF output Relatively quiet: No evidence of significant X-ray production Andrew Moss Forward power into load

MICE CM30 Goals of the Meeting Alain Blondel 11 EMR installed in MICE hall First 3 modules, run started on 30 June! pix courtesy K.Long

MICE CM30 Goals of the Meeting Alain Blondel 12 new target controller in operations pix courtesy K.Long

MICE CM30 Goals of the Meeting Alain Blondel 13 H2 system in the MICE hall already liquefying He pix courtesy K.Long

MICE CM30 Goals of the Meeting Alain Blondel 14 IMPORTANT THINGS TO DISCUSS AND UNDERSTAND SCHEDULE OF DATA TAKING NOW  STEP IV and including STEP V STATUS OF CONSTRUCTION STATUS OF MICE FIRST PAPERS STATUS OF SOFTWARE

MICE CM30 Goals of the Meeting Alain Blondel 15 ISIS running periods, MOM Rota and MICE runs in 2011 First semester Second semester

MICE CM30 Goals of the Meeting Alain Blondel 16 STEP IV  in  out 1.liquid H2 absorber, empty commissioning (tracker, magnets, full DAQ and controls) 2.liquid H2 absorber, full 3.Vacuum (only He and window for trackers) 4.Solid absorbers LiH flat and wedge 5. Other solid absorbers STEP IV configurations We will be ready… Hardware and software. -- problems? Principle: will take 3 ISIS user runs This corresponds to the absorbers used for NUFACT iff step IV can be extended without delaying step V then will do more

MICE CM30 Goals of the Meeting Alain Blondel 17 ISIS running Typical year consists of 5 ISIS ‘user runs’ of ~35 days each + run-ups, MP. 5 periods April 2013 to April 2014  priority to Step V installation Some additional step IV running not ruled out but lower priority Next Long Shut Down envisaged: Aug to February 2015 new target, full EMR LiH wedge + reserve no running Step IV Installation Step IV: empty/LH2/(LHe) no absorber flat LiH

MICE CM30 Goals of the Meeting Alain Blondel 18 Thinking ahead… Step V STEP V “sustainable” cooling: cooling happens in the absorbers but production of cool beam requires acceleration with RF cavities old simulation, Janot (at 88MHz) RF phase E out -E in -1- running with shutters to commission RF cavities (no beam needed) -1’- running with LH2 and RF first with no beam to check RF noise -2- running with beam with no RF and no LH2 to check optics -3- running with beam with LH2 no RF -4- running with beam with LH2 and RF -5- or running with solid absorbers? limited in optics and performance  step VI!

MICE CM30 Goals of the Meeting Alain Blondel sin 2 2  13 90% C.L. new results from T2K (13 June) and MINOS (24 June) on   e appearance  indications that sin 2 2  13 is >0 old fit T2K MINOS note: different  CP axes!

MICE CM30 Goals of the Meeting Alain Blondel 20 Needs confirmation but this is exciting for neutrino long baseline physics! Large values of sin 2 2  13 would give a chance for superbeams to have a shot at CP violation, but Neutrino Factory remains most precise and only device able to test oscillations very precisely -- precision measurements of angles and mass differences, -- tau appearance and unitarity tests -- detailed study of matter effects -- etc…  Physics is moving forward, no time to waste, Ionization cooling must be demonstrated