PRAC Project Phase II: Sour Service Evaluation of ISO TR 10400 FAD Equation API Production Research Advisory Committee Pete Moore – API PRAC Chairman Anand.

Slides:



Advertisements
Similar presentations
Documents for GEO & EO Summit II 1.Statement/Communiqué to be agreed by EO Summit II 2.Framework Document to be agreed by EO Summit II 3.GEO Report to.
Advertisements

Hierarchy of Documents for Earth Observation Summit III Overview for GEO-4 April 2004 GEO Co-Chairs.
Fundamentals of Information Technology (FI) Ian Harrison
January 6. January 7 January 8 January 9 January 10.
Based on Survey Feedback from LEAs Examples:  Copy Rosters for a Teacher: ◦ Able to copy over a teacher’s entire roster to another subject area  Update.
API - WI 2348 Methodology to provide Mechanical Assurance in DCB test
Medicaid Management Information System (MMIS) Replacement Planning Phase.
1 Financial Mathematics Clicker review session, Final.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Technical Question Technical Question
API WI 2385 API C110 laboratory testing for inclusion in NACE MR0175/ISO WI Leader John W Martin.
1 API SC6 Winter Meeting Update on CSOEM MARG Activities Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Time schedule for ex ante evaluation and Strategic Environmental Assessment (SEA) Romania-Bulgaria Cross-Border Cooperation Operational Programme
Follow us on: PATH Performance Management Overview of Performance Management for HR Liaison Network February 7, 2013.
ECE Class Prof Hour – Part I January Welcome Back! Housekeeping issues Important Dates Things you should know…
1 API SC6 Winter Meeting Other Materials Issues Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
1 Draft Research Plan LIEE Process Evaluation Jane S. Peters, Research Into Action Collin Fellows & Kara Crohn Research Into Action Jackie Berger.
Validating the mathematical model of the Fracture Failure Assessment Diagram (FAD) Validating the mathematical model of the Fracture Failure Assessment.
TEACHER MENTORSHIP PROGRAM Supported by the Langley School District and the Langley Teachers’ Association.
Feasibility of 3-D Surface Machining by Dry EDM 1/15 班級 : 碩研奈米一甲 學號 :M98R0105 報告者:陳致維 報告日期: 06/04/2010.
What else is there? CMPT 454: Database Systems II. – Transaction Management. – Query Planning. – Optional topics, e.g. data mining, information retrieval,
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
1 Discussions on NACE TM0177 and API 5CT DCB Tests Xin Long Pete Moore U. S. Steel Tubular Products Westminster, CO 06/12/2012.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
MATH II – SURFACE AREA AND VOLUME
1 Presentation for: Green Pacific Conference 21 September 2010, Seattle, WA Marine Vessel Environmental Performance and Rating System (MVeP) (Voluntary.
Chemistry 353 ORGANIC CHEMISTRY III Dr. George S. Kriz Chemistry Building
PRAC Project Phase III: Sour Service Evaluation of ISO TR FAD Equation API Production Research Advisory Committee Pete Moore – API PRAC Chairman.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
SunSatFriThursWedTuesMon January
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
WLTP GTR 15 WLTP-11-09e Monday, April 06, Report by Drafting Coordinator, Serge Dubuc.
Year 5 Information Session and Professional Responsibilities.
What else is there? CMPT 454: Database Systems II. – Transaction Management. – Query Planning. – Optional topics, e.g. data mining, information retrieval,
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
PDMP & HITI Solution Planning Workgroup Session June 26, 2014.
18 March 2004 / Rev. 01 Cyber Blue – Team 234 Perry Meridian High School Indianapolis, IN Design Review Process Documentation This document is intended.
Service is the difference MEA Roundtable October 30, 2007.
Update of API Standards for Supply Chain Management API Standard 20J – Qualification of Distributors.
Advanced Topics in Algorithms SPRING TERM PROJECT Is worth 40% of your final grade Completed project with report is due in week th May,
API 19 CI Chemical Injection Devices for Downhole Applications
Field Experience in Family Social Sciences
Rockford Public Schools Rockford Action Model for Success
Dates for Stop Smoking Courses 2013
What Else is There? CMPT 411: Knowledge Representation. Mainly Logic.
Field Experience in Family Social Sciences
Cube root – Prime Factorization
May 26, 2014 EFFECT OF EXPLOSION CLADDING INDUCED HARDNESS ON SULFIDE STRESS CRACKING AND STRESS CORROSION CRACKING RESISTANCE OF INCONEL 625 Outline:
Donations for Citations UPDATE
Central Region Steering Committee Meeting
Status of CO2 Cooling tests at CERN for Pixel phase 1
Revisions to the Concentration Averaging and Encapsulation Branch Technical Position A. Christianne Ridge Division of Decommissioning, Uranium Recovery,
API SC 10, Work Group 3 Update:
Rational Exponents and Nth Roots Objectives:
Ashland Public Schools School Start Time Process
What is a Watershed Implementation Plan?
1 C PIPE"' · I - I. 0I0I .. ) sasa /.
Risk Adjustment User Group
Xoserve IX Refresh Customer Update 03/01/2019.
Solving Equations 3x+7 –7 13 –7 =.
Field Experience in Family Social Sciences
DSC ChMC CSS update 09th January 2019
HTML5 Level II CyberAdvantage
Smart Boost Feature Update - Milestones
CV-SALTS Beneficial Use and Objective Study
Volume 50, Issue 2, Pages iii-iv (April 2019)
Presentation transcript:

PRAC Project Phase II: Sour Service Evaluation of ISO TR FAD Equation API Production Research Advisory Committee Pete Moore – API PRAC Chairman Anand Venkatesh, Peter Ellis – Program Managers Jan 23, 2012 Final Report Technical Session I – 3:45pm

Mini-Pipe Testing (4) Tensile NACE A DCB & HRC CTOD Characterization Testing Full Size Pipe (1) ALL TESTING IS COMPLETE FEA Report Complete Committee Report complete ALL TESTING IS COMPLETE FEA Report Complete Committee Report complete

API PRAC PROJECT Final Report (123 pages) API PRAC PROJECT Final Report (123 pages)

API PRAC PROJECT Final Report (123 pages) API PRAC PROJECT Final Report (123 pages) Will be posted soon to the API Website Will be posted soon to the API Website

PRAC Project Phase III: Sour Service Evaluation of ISO TR FAD Equation API Production Research Advisory Committee Pete Moore – API PRAC Chairman Anand Venkatesh – Program Manager January 23, 2012

PRAC III C110 Test Pipe Were Donated and Shipped to Honeywell by Tenaris Detailed Mill Test Report Documenting the Pipe Characterization Attributes

7 PRAC III – Phase 3 Details Testing Details:  NACE Standard TM0177 Method A – Tensile tests complete  NACE Standard TM0177 Method D – DCB tests complete  Mini/Tiny-Pipe SSC Tests – Machining Complete – EDM Notch cutting to start in February – Testing to begin late April  Full Scale Tests with Man-made OD Surface Imperfections ID/OD and OD only or ID only H 2 S Exposure – Pressurized ID environment and OD exposure with replenishment/purging of 7% H2S in solution held in annular volume between plastic sleeve and OD of sample. – Testing to begin late 2012

Machining of Tiny Pipe Complete EDM Notching to start in February EDM OD Notch ~ 4 inches

Testing of Full Size Pipe late 2012