TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.

Slides:



Advertisements
Similar presentations
Euratom Mechanical operation on the TPL sector E.Delmas – December 8th /13 Disassembly and reassembly of a sector of the Toroidal Pumped Limiter.
Advertisements

Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
REMOVE AND INSTALL THERMOSTAT AND TEST OPERATION CS4 A.1 D.6 P-5/6.
 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured.
Status of 1.3-GHz Cavity Vacuum Furnace at IB-4 SRF Dev. Group Meeting 27 Sept 2010.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
Special Report NuMI Target Updates Special Report NuMI Target Updates Status Update I.Target Hall Target module ready to accept new target General target.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
TB Peter Glässel, Heidelberg1 TPC Status.
How to Disassemble and M16 By: Anthony Johnson. Parts List Left and right hand guards Upper and Lower Receiver Charging Handle Bolt Carrier Retaining.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
High Energy Dump LSS5 STI Cost Estimate A.PERILLO MARCONE & F.PASDELOUP 2015/04/16 With contribution of R.FOLCH & D.GRENIER.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
Start Counter Construction Update Eric Pooser 08/21/2014.
PREZENTACJA WSPÓŁFINANSOWANA PRZEZ UNIĘ EUROPEJSKĄ ZE ŚRODKÓW EUROPEJSKIEGO FUNDUSZ SPOŁECZNEGO W RAMACH PROJEKTU MBM – KIERUNEK ZAMAWIANY.
M1M3 Status & Near Future Milestones C.Araujo/ J. Sebag 1.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
Vacuum sectorisation H- Injection Some history Wim Weterings
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Refurbished Booster RF John Reid October 24, 2012.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
T.Ohtsubo, S. Roccia, M. Madurga and the NICOLE Collaboration University of SurreyUniversity of Novi Sad University of Tennessee NICOLE preparation status.
Activities Status and Plan for the week D. Giugni Monday Meeting
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
A UTOMATED Design Team 8 David Martinez Robert Raley James Wilson A DJUSTABLE T ABLE Status Report #5 March 3, 2010.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
1 CD-2 ECP Preparations What is Needed. 2 Background As part of the CD-2 process, we need to establish a fully supported and documented cost and schedule.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
RECENTLY OBSERVED PROBLEMS WITH PRESENT TIDVG 30/07/2014 – “LIU-SPS External Beam Dump” Ivo Leitão.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
SPS High Energy LSS5 Thermal contact & cooling aspects
First Wall Panel - Overview
AD Horn upgrade HV generators
Impact of TIDVG problem on LSS5 dump design schedule
Design of TIDVG#4 A. Perillo-Marcone (EN-STI).
ELENA electron cooler and SEM grids status
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
EYETS septa status Septa activities TE/ABT Thierry Masson
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Disassembly and Assembly of A07A-W1/W2 Electronic Governor Actuator for AD Fuel Injection Pump
Teleconference ACS – FREIA 20th February 2018
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
Step 1:Disassemble battery case
After service guide for changing PCB
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Presentation transcript:

TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão

General Planning TIDVG2014 Upper Yoke Core Lower Yoke Graphite Aluminium Copper Tungsten Necessary operations to produce the TIDVG2014: Prepare spare yokes  Disassemble TIDVG2004 (radioactive) and remove old core. Prepare new core  Finalize the bake-out and place temperature sensors. Assemble and test TIDVG2014 (alignment survey + water leak test). Remove TIDVG2013 (damaged TIDVG presently installed in BA1 - SPS). Install, test and bake-out the new TIDVG2014. OK Ongoing To be completed

Completed Tasks  Disassembly of the TIDVG2004 (EN/STI, HE/HH & DGS/RP) OK Bldg. 954

On-Going Operations  Core Bake-out (TE-VSC)  Temperature Sensors Preparation for TIDVG2014 (EN/STI) Housing for water temperature sensors Core temperature sensors Bldg. 887 (EHN1) Core Ongoing

Operations for Next Weeks  Week 21-25/07:  Temperature sensors preparation until end of the week.  In worst case, bake-out should finish Friday, 25/08.  Week 28/07 – 01/08:  Installation of the PT100’s on the core & transport to Bldg  Assembly of the TIDVG2014 & water leak test.  Following weeks:  Alignment survey  Acceptance of TIDVG2014 (Project milestone!)  Removal of TIDVG2013  Installation of TIDVG2014

THANK YOU 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão