04/05 IceTop schedule * Power required ** Water required Dec 1 Dec 10 Dec 20 Jan 6 Connect to TCH Fill tanks Jan 20 Feb 3 Backfill Cover tanks Run DOMs.

Slides:



Advertisements
Similar presentations
Matching graphs Which of these sketch graphs shows how the depth of water in the glass changes with time? The water comes out of the tap at a constant.
Advertisements

4.6 Related Rates.
Liquids and Gasses Matter that “Flows”
Chapter 3 Measuring Excavation and Sitework
Coin Drop Lab.
Contour and Topo map Applications Profile View (Longitudinal Sections): Roads, Canals, Pipes,… Cross-Sectional View, Roads, Canals, Pipes, Building,…
American Electrical, Inc. Junction Box / Hookup Box Fast and easy way to make electrical connections An assembled kit – no need to procure and assemble.
IceCube Offline Database Overview Georges Kohnen Université de Mons-Hainaut IceCube Workshops Oxford September 23rd, 2005.
Lecture 2Placement and RoutingHandout Houses and Utilities: Warm-up Version There are n houses on one side of a street and 2 utility companies on the other.
2010 Pipe Dreams Team: Ibrahim Ibrahim, Mike Johnson, Scott McCombie, Bronze Richards & Josh Schroeder.
John Osborne GS/SE March 2013
DE03XC W 13 Mile Road, Birmingham, MI , Access: Gate Code /11/12 Walked by; C&S Engineers – Alan MacPherson,
IceCube System Testing
This photo shows the overall lab and electrolytic tank.
Chungnam National University October 22, 2013 Solar Physics with IceTop or How I Learned to Stop Worrying and Love the South Pole Paul Evenson University.
The Effects of White Light Filtered Through Colored Water on Glow-in- The-Dark Stars. Denzil, Daniel, Stacey, Mayra.
Dec 2, 2003Tom Gaisser IceTop freeze tests Interim report from South Pole December 2, 2003.
Middle Fork Project Flow and Temperature Modeling (Status Report) November 4, 2008.
High Energy - Engineering Working Group IceCube PY8 Spring Collaboration Meeting Apr 29, 2009 Jim Baccus.
Paul Evenson Monday, May 05, 2003 IceTop Tank Development CRREL Conceptual Design Presentation Paul Evenson University of Delaware.
Copyright 2008 Coast Guard Auxiliary Association, Inc. The Weekend Navigator Basic Level I.
Status of IceTop tank testing Tom Gaisser, Madison, Feb 20, 2003.
NSF Baseline Review February 10-12, 2004 IceTop Tom Gaisser Bartol Research Inst., Univ. of Delaware Jan 28, 2004T. Gaisser, L3 Lead for IceTop1.
Related Rates 5.6. First, a review problem: Consider a sphere of radius 10cm. If the radius changes 0.1cm (a very small amount) how much does the volume.
David Seckel, IceTop Status, Mons, Oct. 22, 2003 IceTop: PY2 Bartol Res. Univ. Delaware: Xinhua Bai, John Clem, Paul Evenson, Tom Gaisser, Andrew.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Nov 30, 2003Tom Gaisser The IceTop component of IceCube Perspective from the South Pole.
Why Neutrino ? High energy photons are absorbed beyond ~ 150Mpc   HE  LE  e - e + HE s are unique to probe HE processes in the vicinity of cosmic.
Electric Fields. Central Questions What are the shapes of equipotential lines? What is the shape and strength of an electrical field?
Chiang Mai University July 27, 2011 Solar Physics with IceTop or How I Learned to Stop Worrying and Love the South Pole Paul Evenson University of Delaware.
Jan 16, 2004Tom Gaisser 1.3 Cost & schedule review The IceTop component of IceCube Area--solid-angle ~ 1/3 km 2 sr (including angular dependence of EAS.
Calibrating the first four IceCube strings Kurt Woschnagg, UCB L3 Detector Characterization IceCube Collaboration Meeting, Bartol, March 2004.
David Seckel, IceTop Baseline Review, Madison, Dec. 4, 2003 IceTop Baseline Review Dec. 4, Madison WI.
RESERVE SOCIETE SUMARE PAYLOAD. RESERVE SOCIETE CONTENTS Objectives. Sensors choice. Sensors performances. Implant possibilities. Sensors conditioning.
A cylindrical tank is initially filled with water to a depth of 16 feet. A valve in the bottom is opened and the water runs out. The depth, h, of the.
Calibrations Accomplishments in PY03 Plans for PY04 Kurt Woschnagg, UCB L3 lead – Detector Characterization.
IceTop Collaboration Meeting Uppsala, Oct. 9, 2004Tom Gaisser1 IceTop IceTop station 2004 test tanks Calibration Verification 04/05 DOM operation Summary.
IceCube Offline Database Overview Georges Kohnen Université de Mons-Hainaut
Nov 30, 2003Tom Gaisser The IceTop component of IceCube Perspective from the South Pole.
Physical Description of IceTop 3 Nov IceTop Internal Review Madison, November 3-4, 2010 Physical Description of IceTop Paul Evenson, University.
CADD III G enerating R enewable E nergy E fficiently N ow G.R.E.E.N. Project Itinerary.
IceCube Offline Database Overview Georges Kohnen Université de Mons-Hainaut Zeuthen Collaboration Meeting.
THERE ARE MANY INTERESTING & EASY WAYS FOR MULTIPLICATION OF NUMBERS. LET’S SEE ONE OF THE INTERESTING METHOD………..
4.6: Numerical Integration. Trapezoid Rule.
Three View Drawing Technical Drawing and Design Osbourn Park High School Mrs. House.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
DOM Thermal Test Sept X.Bai, D.Swarnkar,. 26”(L) X 28(1/4)”(W) X 20”(H) blue board box filled with fiber glass insulation blue board insulation.
Bluetooth To RS-232 –One To One MACHINE PC One to one - plug and play, do not modify program Bluetooth -masterBluetooth -slave.
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
Serial/Fiber-Converter - IE-MCT-1RS232/485-1SC/ST
LIDO Meeting - Catania 13/01/ Giorgio Cacopardo Arrangement of PCB in LIDO E-POd.
Volume B * h (Base X height) L * W * H. Find the Volume O Formula O Plug in O Check over work 8 in 5 in 6 in.
Electricity is produced at the power station.
Special Device Review (Device Name)
Standard and Slope-Intercept Form
completed in austral season South Pole completed in austral season.
IceCube System Testing
Local communities and municipalities
South Pole Tank Test This presentation contains some information about the tank sensors and measurements.
SCT/Pixel Draft Rack Layout rcj
Private Septic Systems
SUMARE PAYLOAD.
Private Septic Systems
EQ: What effect do transformations have on summary statistics?
REDUCTION TO THE ELLIPSOID
AP Calculus AB 5.6 Related Rates.
Orthographic Projections
Position vs Time Graphs
Climate Graphing.
Climate Graphing.
Presentation transcript:

04/05 IceTop schedule * Power required ** Water required Dec 1 Dec 10 Dec 20 Jan 6 Connect to TCH Fill tanks Jan 20 Feb 3 Backfill Cover tanks Run DOMs Evenson 11/30 – 12/28 Gaisser 11/26-12/14 Tilav 1/12 – 1/27 Roth 11/26-12/19 Jamesway SMURF TCH

IceTop Station and Surface Junction Box Interface to IceCube System 24VDC +/-48VDC Freeze Controller Temporary Smurf Cables 2 +/-48VDC Cables 1 RS485 Data Cable Surface Cable from Counting House Surface to DOM Cable From Hole Surface Junction Box IceTop Excavation NOTES: 1. Drawing is in approximate relative scale. 2. Tanks are 10 meters between centers. 3. DOM cables are 17 meters long. 4. RS485 Master source is controlled by plugging in the desired data cable. 5. Tank power source is controlled by plugging in desired power cable. 6. Power Converter contains +/-48VDC to 24VDC converter and EMI filter. George Anderson Sept 17, 2004 File Rev F Power Converter (green box)

BA C Tank positioning J Cable trench to counting house A = Tank A B = Tank B C = String/hole J = Junction box Distance AC=BC=25±5 m Distance AB = 10±0.5m Tank trench: Ramp-down access from both sides; constant depth between A and B Excess cable: Anywhere between A and B, 1.5 m clearance to tanks To be buried at trench level. Junction box: located between the tanks, exact location TBD on the ice. Not to scale

BA C Freeze-control cables from SMURF until TCH available J Cable trench to counting house A = Tank A B = Tank B C = String/hole J = Junction box Distance AC=BC=25±5 m Distance AB = 10±0.5m Tank trench: Ramp-down access from both sides; constant depth between A and B Excess cable: Anywhere between A and B, 1.5 m clearance to tanks To be buried at trench level. Junction box: located between the tanks, exact location TBD on the ice.

Nominal layout of IceTop Minimize deviations from nominal 125 m grid

Station configurations for 04/05