DE03XC109 20500 W 13 Mile Road, Birmingham, MI 48024 42.51773, -83.24728 Access: Gate Code 0721 5/11/12 Walked by; C&S Engineers – Alan MacPherson,

Similar presentations


Presentation on theme: "DE03XC109 20500 W 13 Mile Road, Birmingham, MI 48024 42.51773, -83.24728 Access: Gate Code 0721 5/11/12 Walked by; C&S Engineers – Alan MacPherson,"— Presentation transcript:

1 DE03XC109 20500 W 13 Mile Road, Birmingham, MI 48024 42.51773, -83.24728 Access: Gate Code 0721 5/11/12 Walked by; C&S Engineers – Alan MacPherson, amacpherson@cscos.com, 248-225-5020 AT&T – Jeff Davis, jd3832@att.com, 248-622-8711

2 Aerial Photo DE03XC109 42.51773, -83.24728 “Meet Me Point”

3 Site Sketch T T P P 2” BURIED TELCO CONDUIT 2” BURIED POWER CONDUIT

4 Site Survey

5

6 6

7 SOW summary ASP to install 2” conduit (hand trenched) with mule tape from the “Meet Me Point” to the proposed Ciena location. Total run of the new conduit is 18’ and will be installed at the depth of 3’. Photos showing the trench depth are required. ASP to install 380’ of mule tape in existing conduit from 13 Mile Road to the site for AT&T to pull fiber to site. AT&T to mount proposed NID (Ciena 3911) to new PPC H-frame east of existing Sprint platform. ASP to install (2) 2” conduits (hand trenched) from proposed Ciena location to existing steel equipment platform each for power and telco. ASP to install (2) new 1¼” flexible conduits attached to perimeter beam of existing steel platform for power and telco connection to the proposed NID. – Power conduit will be installed between battery cabinet and the proposed Ciena with a junction box and whip capable of connecting temporarily to the existing +24VDC Power Plant during the interim phase and then connecting to the proposed -48VDC Power Plant upon completion of the equipment upgrade. Approximate length of the power conduit is 17ft. – Telco conduit will run from proposed MMBS to proposed Ciena. Approximate length of telco conduit is 10 ft. ASP to run 17 ft of 12 AWG power cables from the power plant to the proposed location of the Ciena (installed by AT&T). ASP to run #6 ground wire from the proposed MMBS and proposed power plant to the existing equipment platform and from the proposed Ciena to the new H-frame to tie new equipment into the site grounding system. Approximate ground wire length is 12 ft. ASP to restore all work areas to the pre-construction condition.

8 ASP to install mule tape 380ft from existing AT&T handhole in 13 Mile Road R.O.W. to the site. AT&T to pull fiber through conduit to site ASP to install mule tape in existing conduit from fiber hand hole to site. 380 ft Fiber conduit (2” Unless Noted Otherwise) Power conduit (2” Unless Noted Otherwise)

9 ASP to install mule tape 380ft from existing AT&T handhole in 13 Mile Road R.O.W. to the site. AT&T to pull fiber through conduit to site ASP to install mule tape in existing conduit from fiber hand hole to site. 380 ft Fiber conduit (2” Unless Noted Otherwise) Power conduit (2” Unless Noted Otherwise)

10 ASP to install mule tape 380ft from existing AT&T handhole in 13 Mile Road R.O.W. to the site. AT&T to pull fiber through conduit to site Fiber conduit (2” Unless Noted Otherwise) Power conduit (2” Unless Noted Otherwise) 2” conduit from “Meet Me Point” to Ciena “Meet Me Point” (new pull box on existing H-frame) 8’ 380’ Proposed AT&T OFDT ASP to install mule tape in existing conduit from fiber hand hole to site. 11’

11 ASP to install 18ft of 2” conduit (hand trenched) with fiber from the Ciena to the “Meet Me Point”. and install Ciena on new H-frame located east of the existing Sprint platform. ASP to install MMBS on existing platform in the northwest corner and connect to Ciena with 17ft of 2” conduit (hand trenched). AT&T to install new junction box (2’x2’x8”) on the west face of existing H-frame located 5’ north of the existing telco pedestal which will be the “Meet Me Point”. Fiber conduit (2” Unless Noted Otherwise) Power conduit (2” Unless Noted Otherwise) 2” conduit with fiber from Ciena to MMBS 8’ Proposed MMBS on existing steel platform 5’ 3’ Proposed -48VDC Power Plant location 8’ 2” conduit with 12 AWG power cable from power plant to Ciena Proposed Ciena 3911 on new H-frame 5’ 8’ “Meet me point” 12’ 2” conduit from “Meet Me Point” to Ciena

12 ASP to install 18ft of 2” conduit (hand trenched) with fiber from the Ciena to the “Meet Me Point”. and install Ciena on new H-frame located east of the existing Sprint platform. ASP to install MMBS on existing platform in the northwest corner and connect to Ciena with 17ft of 2” conduit (hand trenched). AT&T to install new junction box (2’x2’x8”) on the west face of existing H-frame located 5’ north of the existing telco pedestal which will be the “Meet Me Point”. Fiber conduit (2” Unless Noted Otherwise) Power conduit (2” Unless Noted Otherwise) 2” conduit with fiber from Ciena to MMBS Proposed MMBS on existing steel platform Proposed -48VDC Power Plant location 8’ 2” conduit with 12 AWG power cable from power plant to Ciena Proposed Ciena 3911 on new H-frame 5’ 12’ 6’ 3’

13 Notes No fiber at site. Need to install 380’ of mule tape from 13 Mile Rd. R.O.W through existing conduit.