PIP Update Talk Booster Notched Beam Kicker Pulser General Talk The Long and Short of It S. Chaurize October 24, 2012.

Slides:



Advertisements
Similar presentations
Main Injector Gap clearing kickers Phil Adamson (#) AEM 14th March 2011.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Progress of the BEPCII Injection System Kang Wen.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Development of Solid State Long Pulse Klystron Modulators
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
High Rate Kicker Preliminary Study (Quick Update) Tony Beukers/Tao Tang 4/8/14.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Semiconductor Switch Designs M.J. Barnes Acknowledgements W. Bartmann, L. Ducimetière, B. Goddard, J. Holma, A. Lechner, T. Fowler, T. Kramer, M. Meddahi,
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
Booster Beam Notching Overview for 2012 S. Chaurize December 7, 2011.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
A 3 Pass, Dog-bone Cooling Channel G H Rees, ASTeC, RAL.
The Heavy Ion Fusion Virtual National Laboratory Pulsed Normal Quadrupoles for a Heavy Ion Fusion Driver Final Focus Section D. Shuman, S. S. Yu, LBNL.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
Muon g-2 Experiment at Fermilab Recycler Extraction Kicker Dan Wolff/Chris Jensen 8/29/08.
STATUS OF NOKER PULSER FOR SHORT MAGNETS C. C. JENSEN DECEMBER 4, 2013.
Prompt Kicker M. Aoki. 2 3 H-Line Kicker Prompt Burst: 5e8 / H-line exit – Any detectors will be saturated. Need to reduce the prompt burst.
Booster Beam Notching Installation Update PIP Talk Salah Chaurize February 20, 2013.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
NUMI NuMI Magnet Power Supply System WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Booster L12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize.
PIP Wednesday March 21, /21/12 Agenda Project Update(s) Pellico - PIP Status Talk(s) 1.Ryan Crawford: Linac Power Distribution - Shutdown 2012 activities.
Operational experience of high-power RF at Diamond Light Source
PIP Update Dec 17 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
ILC Interaction Point Intra-Train Feedback Kicker November 1, 2005 Steve Smith.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
B. Buonomo for the DAFNE LINAC group First BTF Users Workshop – LNF 6-7/5/
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
, UKNF Meetin, Imperial College J. Pasternak Status and Recent Progress in the Muon FFAG Designs J. Pasternak, Imperial College, London / RAL.
, IDS Meeting, Fermilab J. Pasternak Challenges of muon FFAG: injection/extraction, beam dynamics and injection/extraction hardware design studies.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
CLIC Civil Engineering & Infrastructure Working Group Meeting
Development of a Marx-Generator for the drive beam electron gun
Tunnel Magnetic system power supply №1 HVM+Heat Power supply HVT SM
Status of the CERN chopper.
TE4862 Thyratron Power Triggering System for the CERN Kicker Systems
F.Marcellini, D.Alesini, A.Ghigo
TCM PS – SPS Thyratron Power Trigger Consolidation
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
KICKER STATUS G-2 meeting March 5, 2014
Explanation of the Basic Principles and Goals
LINAC PROTON SOURCE MODULATORS
Presentation transcript:

PIP Update Talk Booster Notched Beam Kicker Pulser General Talk The Long and Short of It S. Chaurize October 24, 2012

Current Plans Current BKED (Long) design kicker have a fill time of about 35-40ns Short BKEE/BKEF kicker modules are about half as long. They will produce a rise time of about 20ns. The voltage propagation time through the short kicker is cut from 20ns to 10ns due to half length. Two short kickers will rise faster with appropriate pulser to reach a desired flatop value. We will use a ANU style pulser using a CX2610 hydrogen thyratron rather than the existing CX1168 tube. One Pulser can drive 4 magnets

Current Plans Chris Jensen and EE support group is currently working on acquiring and building ANU style pulser. Pulser components will be built through out We hope to have one pulser operating in a test configuration by the end of We will try to convert one long kicker to a pair of 2 short kickers as soon as feasible(2013/14)

BKEE02(Short Module)

BKED012(Long Module)

BKEE001 Short 42KV Noker BKED012 Long 42KV Noker Channel 1 V in Channel 2 Vout Channel 3 Load I

BKEE02(Short Module) Voltage ~40kV

BKED012(Long Module) Voltage ~40kV

Preliminary Finding is a 8-15 ns difference between ANU pulser and Operational Booster pulser(Slower) Testing by Jensen, Chaurize

Kicker Matching Issues Testing of kicker modules has been in progress. Resolving impedance issue with first version BKEE design to BKEF version still in progress. Currently we have 3 short kickers made. 2 modules are of the BKEE design that are usable but not optimal in regards to their impedance. Testing version 2 kicker series BKEF.

Support Equipment for New Pulser Typical Control components Filament and Reservoir power supplies Filament and Reservoir control loop modules HV Power supply and control modules Timing modules

New Pulser for Short BKEF Kicker Example(ANU Pulser Test Unit)

East Gallery Thyratron Cabinets

1Long Kicker BKED Series 2 Short Kicker BKEE Series

Booster Tunnel Long 12