High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Superconducting Spoke Resonator Cavities and Cryomodules
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
F HINS Schedule of Activities in Meson During FY08 Bob Webber AD Safety Meeting December 5, 2007.
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
HIE-ISOLDE contribution packages M. Pasini BE/RF.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
ANL-FNAL Collaboration on High Intensity Neutrino Source Activities G. Apollinari Introduction Collaboration Activities ‘05-’07 Achievements ’07-’10 Plans.
F Project X Overview Dave McGinnis October 12, 2007.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
Fermilab High Intensity Neutrino Source R&D Program - Mission, Status, Plans, and Support Needs - For AD Department Heads March 2007 Bob Webber.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
HINS Front-End R&D --- Status and Plans Bob Webber Fermilab Accelerator Advisory Committee August 7, 2007 Update of May 10 th – 12 th, 2006 AAC Presentation.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
HINS R&D Giorgio Apollinari Fermilab Accelerator Advisory Committee May 6-8 th, 2008.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
F. f 2 Definitions Proton Driver –Generic name for past ~15 years for new, higher intensity machines and schemes to replace present Linac and Booster.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
HINS Status and Strategy/Plans with Respect to Project X Bob Webber AAC Meeting November 16-17, 2009.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
WP5 Elliptical cavities
Uppsala Commitment to ESS and FREIA Planning
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
X-ray Pump-Probe Instrument
High Intensity Neutrino Source R&D Overview
HIE-ISOLDE contribution packages
Ciprian Plostinar Workshop on Testing and Commissioning
Upgraded Injector Test Facility
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Accelerator Installation Schedule
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006

Fermilab 2 Proton Driver Information Project Site: Design Study (Draft, 215 pg.)  Director’s Review: DOE has elected to not pursue Proton Driver project at this time

Fermilab 3 Now HINS R&D Program To construct and test key components of the low-energy Linac concept and integrate into a demonstration accelerator in Meson Detector Building Install and commission 2.5 MW, 325 MHz klystron system Equip and operate a 325 MHz high power RF component test facility Fabricate, install, and operate a test stand for 325 MHz RT cavities and a test cryostat for 325 MHz SC spoke cavities Assemble ion source and RFQ providing a 2.5 MeV beam source Assemble the 10 MeV RT Linac, operate with beam, and verify performance Install 325 MHz SC spoke resonator cryomodules and operate with beam up to 90 MeV This all adds up to building a first-of-its-kind superconducting 90 MeV H- linac

Fermilab 4 R&D Program Organization Program Leaders –Program Manager – Giorgio Apollinari/TD –Program Engineer – Bob Webber/AD Beam physics design by Petr Ostroumov (ANL) and FNAL AD TD Responsibility – Design and fabrication of beam line technical components –Accelerating cavities (room temperature and superconducting) –Superconducting solenoid focusing magnets AD Responsibility – System integration, commissioning, and operation –RF, pulsed, and DC power systems –Vacuum, water, cryogenics –Controls –Beam instrumentation Regular meetings –TD 9:00 am Thursday – beam physics, beam line component design –AD 1:00 pm Thursday – Meson building activity coordination, RF power and controls topics

Fermilab 5 Meson Building Floor Plan 90 MeV Linac Klystron and Modulator Area RF Component Test Facility Cavity Test Cave 200 ft. Ion Source and RFQ Area

Fermilab 6 Technical Status Overview Meson Test Area – –Klystron, Waveguide, and Racks Installed up to RF Component Test Area –Components on order to feed power to Cavity Test Cave –Modulator is currently critical path to RF power Now expected about the end of October –Support systems status Controls – timing equipment is installed into racks, HRMs coming, two “console” computers on hand Safety Approval Status – meetings being held with AD Safety Accelerator Components – –RFQ design review Sept. 14 delivery expected in March 2007 –RT cavities – first cavity and coupler in fabrication, delivery expected in early November –Fabrication of first SC Spoke Resonators is beginning at two vendors –Test cryostat – Procurement package being assembled, ~6-8 mo. delivery –Integrated beam line design (instrumentation, valves, etc) is next job to be tackled –Ion source now operating at MS-6

Fermilab MHz 2.5MW Klystron (early May)

Fermilab 8 View Into Klystron/Modulator Area (September)

Fermilab 9 RF Cage Assembly (September)

Fermilab 10 Modulator Capacitor Cabinet (August 2)

Fermilab 11 Modulator Switch Cabinet (August 2)

Fermilab 12 Empty “mock-up” Cave in Meson

Fermilab 13 First RT CH Cavity in Production End wall assemblies ready to be brazed. Copper spokes rough machined and annealed; waiting to be finished. Body wall roughed in and annealed. Cavity in concept.

Fermilab 14 3D Model of SSR module Superconducting structure Helium vessel Slow Tuner Mechanism Spoke

Fermilab 15 Meson Schedule 2006 (red updates since May/August) Short “mock” Linac cave section available –May 2006 (nothing yet modeled or installed) Klystron modulator completion –July 2006 (late July) (late September) (late October) 325 MHz RF power system commissioning –July 2006 (early August) (early October) (November) 325 MHz component testing in RF test area –Starting August 2006 (delayed due to Modulator) 325 MHz RT cavity power testing in cavity test cave –September 2006 (delayed due to Modulator) Superconducting cavity test cryostat installation –October 2006 (Spring ‘07) (Summer ‘07) Ion Source installation in Meson –November 2006 (January ‘07)

Fermilab 16 Meson Schedule 2007 (red = updates since May) RFQ (now in procurement) delivery and power testing –January 2007 (~6 months from June 30, 2006 order date) (~6 months from Sept. 14, 2006 review date) Production quantity RT cavity and coupler delivery & testing –Starting February MeV beam tests –Beginning February 2007 (April 2007) First SC spoke resonator power tests in test cryostat –April 2007 (Fall 2007) Linac cave construction and utilities installation –May 2007 Demonstration of multiple Room Temperature cavity RF distribution and independent amplitude & phase control –July 2007 Beam accelerated through first ‘N’ RT cavities –September 2007 (optimistic)

Fermilab 17 Meson Schedule 2008 Full 10 MeV RT linac installed –April 2008 R&D beam operations at 10 MeV –Starting May 2008 First SC spoke resonator cryomodule installation –October 2008 Tests of RT + SC cavity RF distribution and independent amplitude & phase control –November 2008 Beam through first SC spoke cryomodule –December 2008 (optimistic)

Fermilab 18 Snapshot of Recent HINS Effort Tech Division – July –13 individuals contributing a total 9.62 FTE –Average ‘duty factor’ ~ 75% Accelerator Division – June –35 individuals contributing a total FTE –Average ‘duty factor’ ~28% –Many people are “attached”; few are so engaged as to contribute a large fraction of their time 9 of the 35 individuals report at less than 10% of their time 17 of the 35 individuals report at ≤20% totaling 1.36 FTE –48% of the people contribute only 13.5% of the work Only 6 of the 35 individuals report at >50% totaling 4.26 FTE –17% of the people contribute 42% of the work

Fermilab 19 Controls - Requirements, Issues, Plans, Defaults Requirements – –Most everything a full accelerator needs Issues – –Manpower to Detail requirements Design and implement system infrastructure, central software services, application programming, front-end software –Currently have some piece of the attention of Sharon Lackey, Peter Lucas, Mike Kucera, Dennis Nicklaus, Brian Chase, Peter Prieto… Plans – –Go with the current ‘flow’ VME, VXWorks, Epics, (no pre-disposition toward DOOCS) Defaults – –HRMs with “Classic” Linac controls plus EPICs with EPICS applications screens