11.06.15 HV-system Oleg Maev 1. Brief overview of HV-systems Muon chambers circuits 2. States of HV according LHC/LHCb conditions 3. Useful practical applications/knowleges/tools.

Slides:



Advertisements
Similar presentations
Dmitrii Mausuzenko, Oleg Maev (PNPI)
Advertisements

Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
André Augustinus 16 June 2003 DCS Workshop Safety.
02-Mar-09A. Cardini / CERN & INFN1 Muon Detector Status (week 9: Feb 23 rd  Feb 27 th ) Present: Ale, Thomas, Nikolai, Oleg, Sasha, Maria Luisa, Perluigi,
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
HV system migration to USB interface Presented by Korolev M.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
Chamber parameters that we can modify and that affect the rising time Number of ionisation clusters produced in the drift gap: Poisson Distribution Probability.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
Muon Piquet Training. Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple,
MDT PS DCS for ATLAS Eleni Mountricha
User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (written by Michela) HV part updated by Oleg Maev 4-November-09.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
LHCb F. Murtas Servizio elettronica G. Corradi D.Tagnani P.Ciambrone HV_GEM per LHCB M1R1 HV power supply Introduction Introduction HV_GEM Technical specification.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
Problems with Muon System N. Bondar O.Maev
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Muon System Safety Issues Burkhard Schmidt.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Adapting Muon Endcap UF/PNPI HV system for GEM V. Barashko, A. Korytov, A. Madorsky, G. Mitselmakher University of Florida/Physics N. Bondar, V. Golovtsov,
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Chamber Monitor Panel Emiliano Furfaro 16 october 2012.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
Muon Piquet Training V.0 W Baldini, E.Furfaro, O. Maev June 11-th 2015.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
LHCb MUON. Plans on GIF++ (16.65 TBq) Oleg Maev What has been done for study of aging in MUON MWPCs and GEMs before RUN1: -Six months on GIF.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008.
RPC DSS & DCS Action Matrices Review Anton Dimitrov CMS Action Matrix Review 2015, 06.Mar.2015, CERN, Geneva.
LV & HV Updates Vasileios Martos. Start / Stop GapsCheck Script Instead of using Browser or the Console Manager to Start/Stop The Script.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Status of the Muon detector Alessandro Cardini CERN & INFN Cagliari Thanks do Davide, Rafael, Maurizio, Oleg, for part of the material included here.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
ATLAS MDT HV – LV Detector Control System (DCS)
Pierluigi Paolucci & Giovanni Polese
Pre-installation Tests of the LHCb Muon Chambers
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

HV-system Oleg Maev 1. Brief overview of HV-systems Muon chambers circuits 2. States of HV according LHC/LHCb conditions 3. Useful practical applications/knowleges/tools Piquet training

GEM HV-system Oleg Maev Power Supply designed and realized at INFN, Frascati specifically for LHCb MUON GEM-detectors. Provides Gas gain (GG) in 12 GEM-chambers in M1R1. Each chamber consists of two triple-GEMs detectors. Gas mixture - Ar/CO2/CF4 (45 : 15 : 40) Gain ~4300 at HV 3x415V Safety limit on current - 8muA  PS Placed in D3 Rack D3A05 Details on PS see on 2

Oleg Maev 3

GEM HV-system Oleg Maev 2012 Conditions - L~4x10 32 cm -2 s -1 4

CAEN HV-system Oleg Maev Commercial one. Consists of: SY1527 Mainframe with A1676A controllers A V PS “CARBON” 48V service module home made D3 Rack D3A05 D3 Rack D3A06 EASY 3000 crate with A3535P 32 chs PS board D3 CAVERN 5

CAEN HV-system Oleg Maev Provides GG in 264 two-gaps MWPCs on M1 in regions R2-R4, 528 HV-channels, and in 144 four-gaps MWPCs in regions R1- R2 on M2-M5 stations, 576 HV-channels HV-channels in total. Gas mixture - Ar/CO2/CF4 (40 : 55 : 5) Gas Gain ~ at HV V 6

PNPI HV-system Oleg Maev Distributes HV from primary PS with two-level linear regulators Designed and realized at PNPI together with Florida University specifically for LHCb and CMS MUON MWPCs. MATSUSADA PS Commercial one RDBs – 2 nd level of distributers HVM-module (MSU) USB-interface Master modules: 1 st level of distributers RACK D3A06 CAVERN Matsusada-control 7

PNPI HV-system Oleg Maev Provides GG in 960 four-gaps MWPCs in regions R3-R4 on M2- M5 stations, 3840 HV-channels. Just keep in mind: OFF on 2 nd level RDBs doesn’t mean HV=0 It always propagates ~ 1000V from 1 st level (Masters) To get HV=0 you should switch OFF Masters 8

HV-system. ECS Oleg Maev HV systemWINCC - projectHost (Linux) Virtual machine DriverRunning on (Windows CCPC) GEMMUHVGEMmuhvgem01OPCmucc0503w CAEN A-sideMUHVA02muhva02OPCmucc0301w CAEN C-sideMUHVC02muhvc02OPCmucc0302w PNPI A-sideMUHVA01muhva01DIMmucc0801w PNPI C-sideMUHVC01muhvc01DIMmucc0802w Cold start and details on TWIKI (in progress): 9

HV-system. ECS Oleg Maev OFFSTANDBY1STANDBY2READYNOT_READYTRIP HV states: FSM (WINCC) status: DEADREADYNOT_READYERROR Some important details on TRIP ( I>thr. during 1s): GEM – never tripped (protective resistor) – reduce the HV CAEN – normal trip (HV->OFF) PNPI – trip only in the case of short or something serious (procedure for SOFT_TRIP implemented – reduce the HV) 10

HV Monitor Oleg Maev 11

HV Monitor Oleg Maev Control from MUSIDES 12

HV Monitor Oleg Maev Also with this Monitor you may operate with PSs, see status of the servers, Gas and also run the Gaps Check Script which is limited by 20 tripps and needs to be periodically rerun. This script makes tripped gap disabled, writes log entry, sends SMS to Piquet phone and produces the voice message in CR. Very useful tool. 13

HV Monitor Oleg Maev With left click you may open any chamber: 14

HV Monitor Oleg Maev And reach some subsystems with following trick: 15

GEM Current Monitor Oleg Maev 16

Side HV-panel – Main (CAEN) project Oleg Maev 17