Contract N°: IEE/10/280/SI2.590837 Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14 Solar Thermal in major renovations and protected urban.

Slides:



Advertisements
Similar presentations
Workshop 4: Using the EU Structural Funds to support Independent Living Ines Bulic European Network on Independent Living Strasbourg Freedom Drive, 9 Sept.
Advertisements

GEF PROJECT TEMPLATES ANDGUIDELINES George Manful (PhD) Senior Task Manager, Climate Change UNEP UNFCCC Asia and Pacific Regional Workshop on Preparing.
Project: Participate! Decide! Win! “Improving the Practices of Public Participation: Next Steps in Implementing the Aarhus Convention in Albania, Bosnia.
Bic river basin management plan and involvement of local authorities in the implementation of the program of measures Dumitru Drumea, Executive Director,
Contract number: IEE/12/807/SI Duration: April 2013 – May 2016 Symbiotic bio-Energy Port Integration with Cities by 2020 EPIC 2020.
IRC – 2011 I nnovation, R esearch and C ompetition From knowledge to competitive network European funds for building industry 2014/2020| Jan. 30 th, 2014.
1 eBRIDGE: empowering e-fleets for business and private purposes in cities The sole responsibility for the content of this publication lies with the authors.
Capacity building for public authorities – EE7 Veronika Czako Project Adviser, EASME.
C-LIEGE Contract N°: IEE/10/154/SI Project duration: from 1 st June 2011 to 30 st November 2013 Date of creation: 4 th July 2011 Clean Last mile.
Programmes to increase the uptake of EPC recommendations ADENE, PT.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Buildup Skills Malta Contract number: IEE/12/BWI/455-SI Project duration: 18 months June 1012 – December 2013.
 For the implementation of the EPBD and the targets optimal design strategy is needed for energy efficient buildings by applying an integrated.
Il Programma ENPI CBC Bacino del Mediterraneo Projects promoted by the Province of Turin Turin, 29 January 2013.
SCORE project “Virtual community of the key stakeholders to assess and promote innovative technologies”
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
SHAAMS Next steps in Lebanon Policy Accelerator Policy Accelerator Activities Activity 1 Participant stakeholders identification Activity 2 Implementation.
GovernEE GovernEE – Good Governance in Energy Efficiency Legal constraints and opportunities for improving EE of public and historic buildings.
Tisa Catchment Area Development TICAD KEY ROLE OF SPATIAL PLANNING IN THE DECISION MAKING PROCESSES - REGIONAL SPATIAL PLAN OF AP OF VOJVODINA - Msc Arch.
C ertification for H ydro: I mproving C lean E nergy Contract number: IEE/07/704/SI September 2008 – February 2011.
Energy-Efficiency-Watch (EEW) - Basics on the project – Dr. Jan Geiss Secretary General EUFORES Coordinator of the EEW SpanishWorkshop In cooperation with.
FLLLEX – Final Evaluation
The INTENSE project: Improving Energy Efficiency in the Building Sector Workshop: Sustainable Energy Action Plans in Latvia: Regional Cooperation,
ENERGY EFFICIENCY CENTRE GEORGIA  Support to renewable energy and energy efficiency utilization for sustainable development and as a result improve national.
Policy options and recommendations José Palacín Chief, Innovative Policies Development UNECE Minsk, 19 June 2014.
THE EUROPEAN PLATFORM FOR CITIZEN INVESTMENT IN RENEWABLE ENERGY Contract N°: IEE/13/403/SI CITIZENERGY Duration : FROM TO
Strengthening global awareness in the local communities - Kolping 2020 Strategy.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
SHAAMS-Social Acceleration -State of the art in Lebanon- Presented by Krystel Khalil Berytech.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
The Future of Transnational Cooperation in Central Europe ( ) Claudia Pamperl JTS INTERRREG IIIC East.
Solidarity Financing Mechanism in Laos MIREP Program Noupheuak Virabouth Director Water Supply Authority (WASA) Department of Housing and Urban Planning.
Project BUILD UP SKILLS – LT Project no IEE/12/BWI/460/SI Project name: BUILD UP Skills – Lithuania Project acronym: BUILD UP Skills - LT Contract.
The sole responsibility for the content of this presentation lies with the authors. It does not necessarily reflect the opinion of the European Communities.
1 …. Ministry of Social Protection, Family and Child Republic of Moldova European High Level Conference of the Council of Europe "Protecting and promoting.
ENTRANZE Policies to enforce the Transition to nearly zero energy buildings in the EU-27.
1 target SOLARGE – Enlarging Solar Thermal Systems in Multi-Family Houses, Hotels, Public and Social Buildings in Europe Contract no.: EIE/04/082/S
Legal Aspects Related to Brownfield Regenerations Prof. Maros Finka, M.arch., Ph.D. „This project has been funded with support from the European Commission.
Solar thermal applications in Eastern Europe with Guaranteed Solar Results Solar thermal applications in EASTern Europe with Guaranteed Solar Results EAST-GSR.
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) 1 st Innovation Dialogue Forum Becici, 8-9 November 2010.
Renovation through quality supply chains and energy performance certification standards REQUEST EU programme supported by Intelligent Energy Europe IEE/09/870/SI
Regulations of Geothermal HP systems at local and regional level in Europe Contract nº: IEE/11/041 01/05/2012 to 30/04/2015updated: March 2014.
IEE/13/477/SI Legal disclaimer: The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect.
“Memorandum of Understanding (MoU) between MARIE, GRASP and PEEBPE Projects” Presented by: Thanos Papotis (EUROCONSULTANTS S.A), Technical Consultant of.
11/22/ The ALBI model Lucca, Knowledge seminar January 21st, 2014 Provincia di Lucca.
16-17 November 2005 COSCAP – NA Project Steering Group Guangzhou, China 1 Co-operating with the European Aviation safety Agency.
1 This project is co-financed by the European Union STATUS OF RENEWABLE ENERGY IN THE MEDITERRANEAN AND CURRENT CHALLENGES; MedReg Perspective By Prof.
Supporting Development of Photovoltaics in the European Union New Member States Network IEE/07/809/SI Duration: Oct – Sept Coordinator:
Contract Number: IEE/11/885/SI PInE Project Duration: from to – Date of creation: PI N E P ROMOTING I NDUSTRIAL.
MUSEC-EIE/06/024/SI SUPPORTED BY Contract number: EIE/06/024/SI Project duration: December 2006 – June 2009 (30 months) MUSEC.
Training for Rebuilding Europe Retrofitting buildings, training and improved skills, and financing energy efficiency in buildings. 10 December 2010 – 10.
Contract No. IEE/11/826/SI Duration: From 03/05/ /10/2014 ENergy efficiency in City LOgistics Services for small and mid-sized European historic.
EUNetPaS is a project supported by a grant from the EAHC. The sole responsibility for the content of this presentation lies with the author(s). The EAHC.
SMILE - Smart Green Innovative urban Logistics for Energy efficient mediterranean cities Rijeka, Overview of the SMILE Project.
BUILD UP SKILLS – SLOVAKIA BUSSK IEE/12/BWI/426/SI – BUSSK PROJECT DURATION: FROM 6TH JUNE 2012 TO 5TH DECEMBER th February 2013.
EU context (networks & initiatives) and expectations EU context (networks & initiatives) and expectations Michel Viaud and/or Ingrid Weiss EPIA, Brussels,
W w w. a u d i t 0 6. f i ENERGY AUDIT ’06 International Conference on Energy Audits Timo Husu Head of Unit, Energy Efficiency Motiva Oy, Finland.
Turin Final Conference 25 September 2014 Work Group 1 Cordelia Koenig Ministry of Urban Development and Environment Hamburg Turin Final Conference 25 September.
Total Resource and Energy Efficiency Management System for Process Industries The sole responsibility for the content of this document lies with the authors.
"The role of Rural Networks as effective tools to promote rural development" TAIEX/Local Administration Facility Seminar on Rural Development Brussels,
SIMONA MURRONI Bruxelles - June 27th 2013 Bridging lessons learned from the past with new planning and delivery approaches in the energy sector.
Legal Aspects Related to Brownfield Regeneration
Template for country interventions (5 min)
The SWA Collaborative Behaviors
Civil Protection Financial Instrument – Prevention Projects
You can use cover page with one or two photos or without photos
Sustainable buildings
Juan Gonzalez eGovernment & CIP operations
Technical Guidelines for the Development of International Standards for Small Hydropower Plants   DONG Guofeng ICSHP  7 November, 2018.
Presentation transcript:

Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14 Solar Thermal in major renovations and protected urban areas UrbanSolPlus The sole responsibility for the content of this document lies with the authors. It does not necessarily reflect the opinion of the funding authorities. The funding authorities are not responsible for any use that may be made of the information contained therein.

Project summary Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14 Main objective: allowing a major diffusion of solar thermal, reducing the barriers to its use in demanding situations, namely major renovations and multi-family buildings located in protected urban areas 11 partners from 6 different countries (DE, ES, IT, PL, PT, SL) including local authorities, energy agencies, solar thermal experts and industry Main target groups: Local communities and energy agencies Local stakeholders and market actors concerned Solar thermal sector Expected outputs and results: the participating Communities (Barcelona, Benevento, Berlin, Lisbon, Pescara) will exchange, improve and implement best practice experiences and models for introducing solar thermal in demanding situations Through dissemination of these experiences, replication of the models will be stimulated, improving the impact of the project

Background Article 13 of the 2009/28/EC Directive requires minimum share of renewables for new buildings and major renovations. given the current very low construction rate for new buildings, renovation play a key role for addressing a large part of the building stock However… very often the scope of these building laws include just new buildings and not renovations building located in protected areas are often exempted, even though the extension of these areas are actually relevant. Moreover renovations, especially of large buildings, are complicated from several points of view Therefore…UrbanSolPlus aims at allowing a major diffusion of solar thermal, reducing the barriers to its use in major renovations in multi- family buildings located in urban and/or protected areas, thus helping the implementation of the 2009/28/EC Directive Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14

Objectives Main objective: allowing a major diffusion of solar thermal, reducing the barriers to its use in demanding situations, namely major renovations and multi-family buildings located in protected urban areas Outcomes and consequences: renewable heat obligations will have a wider scope, thanks to the inclusion of renovations and protected areas, which will not be automatically exempted Communities and local stakeholders will have the necessary expertise to deal with diffusion of solar thermal plants in demanding urban situations ST manufacturers will increase their specialised know-how and will be able to provide solutions for turn-key plants in demanding situations promote modified and improved building codes or ordinances, which will take into account the results of the project Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14

Main steps Critical survey on: best practice experiences and stakeholder cooperation models for solar thermal plants in multi-family house renovations existing solutions for architectural integration of ST systems legal framework and successful examples of implementation of ST in protected areas For each country, production of a reliable base of system solutions, related costs and resulting investment feasibility for the specific boundary conditions (targeting potential investors) Implementation of practical actions in the participating communities: development strategy for promoting the use of solar thermal in urban quarters, building renovation sector and protected areas master plan for developing the use of solar thermal in one representative urban block, quarter or area start-up of the implementation of measures Dissemination and involvement of the target groups Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14

Expected results Installation of a relevant number of systems on large residential buildings in the participating communities Practical implementation of models for developing solar thermal in demanding urban areas Improvement of the know-how of Communities and local stakeholders for dealing with solar thermal plants in demanding urban situations New and innovative solutions coming from the solar thermal industry, regarding large scale plants and architectural integration inclusion of renovations and protected areas in the scope of renewable obligations for buildings Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14

Achieved results [1] Collection of a large exemplary cases on business models, architectural integration, solutions on heritage buildings, to be found and downloadable from the website [ 4 separate transfer guidelines on Technical issues, Stakeholder cooperation, Architectural integration and Protected buildings 6 feasibility decision base, one for each partner country The Guide: an important dissemination tool towards a wider diffusion of solar thermal plants on multifamily houses Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14

Achieved results [2] 5 Development Strategies for the local communities Barcelona Berlin Benevento Lisbon Pescara 5 Master Plans for specific areas accordingly to the Development Strategies Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14

Achieved results [3] Installation of a relevant number of systems on large residential buildings in the participating communities: operative figures are available from Barcelona, Berlin and from Lisbon. Berlin – assumption is that plants larger than 20 m2 are installed on MFH : plant subsidized from BAFA: 50 for a total 1,013 m2 (average 20.3 m2/plant) plants <20m2: 34 for a total 551 m2 (average 16.2 m2/plant) plants >20m2: 16 for a total 462 m2 (average 28.9 m2/plant) about 45 % of the installed plants are on MFH Barcelona : plants installed: 409 for a total 16,500 m2 plants on MFH: 224 for a total 7,234 m2 (average 32.3 m2/plant) about 55 % of the installed plants are on MFH (and 44% measured on square meters) Lisbon – following the data collected from the National Energy Agency, ADENE, and regarding the number of energy certificates issued between for MFH with STS, the results are : plants installed on MFH: 346 (average 9.82 m2/plant) representing 12 % of total installations (measured on square meters) Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14

Achieved results [4] Modified and improved (protected) building codes or ordinances: development of rules and requirements, instead of exemptions, for solar thermal in renovation cases and protected buildings. In the Province of Pescara three new building codes in implementation and commitment in adopting 46 renovated building codes. In Barcelona the municipality has started to work on new energy local regulation to be finished in draft by end of 2014 Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14

Partners & contact Project partners: Ambiente Italia (IT) Lisboa E-nova (PT) Solites – Steinbeis Research Institute for Solar and Sustainable Thermal Energy Systems (DE) Agència d'Energia de Barcelona (ES) EC BREC Institute for Renewable Energy Ltd (PL) Aiguasol (ES) Ezavod (SL) Provincia di Benevento (IT) Berlin Energy Agency (DE) Provincia di Pescara (IT) Apisolar (PT) Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14

Partners & contact Project Coordinator: Ms. Chiara Wolter, Ambiente Italia Via Poerio 39, Milano (Italy) Phone: Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14