News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.

Slides:



Advertisements
Similar presentations
We have developed CV easy management (CVem) a fast and effective fully automated software solution for effective and rapid management of all personnel.
Advertisements

Conference Title L. Stringhetti, IASF Milano, ASTRI Meeting #9, Bologna 24 Feb Status of the ASTRI/CTA project and organization/management issues.
LHCbComputing LHCb Computing Tasks. December Status of Computing Personnel m Currently available people insufficient to cover all activities o Estimate.
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
Project Perfect Pty Ltd Project Administrator Overview of Software.
Title Presentation based on $4M / year for 5 years proposal option.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.
Hunter Valley Amateur Beekeepers Forum User Guide Guide shows sample screenshots with most relevant actions. Website is at
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SBS Management John J. LeRose Project Manager. Good News/ Bad News We are an official DOE program (project(s), whatever…) – Good because we are more likely.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
Pay for Performance and Evaluation System Summary
1 News and Miscellaneous UPO Apr Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Upgrade Result Approval: CMS and Tracker Frank and Andrea 21/5/14Pixel phase 1 MB1.
RRB Scrutiny Group Meeting A. Charkiewicz, 11 June 2014 M&O-A and Upgrade Budget Issues.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Adult Education Block Grant Webinar January 22, 2016.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
News and Miscellaneous UPO Nov Didier Contardo, Jeff Spalding 1 UPO Nov L1-Trigger TDRs -Upcoming Proposals for Phase 1 -CMS week Dec.
GMAP Grant Management, Application, and Planning Consolidate Application Training.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
O. Kester, NuSTAR annual meeting, 27/02/2013
Lab-Wide Earned Value Management System Project Core Team Meeting September 10, 2008 Dean A. Hoffer/Elaine McCluskey.
Introduction and News Karl Gill. Introduction Today’s agenda News AOB – Hypernews, Calendar 2012.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
Workshop Structure-Detector Agenda structure similar to last two meetings –Two subsystem parallel sessions today and tomorrow –ETD, DGWG, Simulation Parallel.
Detector Goals and General Syst. System Parallel Joint Parallel DGWG Mechanical Integ. TDR Organization System Summaries WORKSHOP Structure-Detector +
News and Miscellaneous Didier Contardo, Jeff Spalding UPO August 03/ UPO 08/03/12.
20/07/ Marzio Nessi Agenda For NIKHEF plans for the ATLAS Upgrade. NIKHEF ATLAS upgrade plans and organization DL/NH Potential.
Organization and Goals for the Workshop
News and Misc UPO Meeting Jan 16, 2012
Technical Design for the Mu3e Detector
UPO meeting Nov. 29, 2013 D. Contardo, J. Spalding News
Global Grid Forum GridForge
Mini-drawers, FE-ASIC , Integrator
Technical Design Report preparation
Update on ATLAS insertable B-layer
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
Presentation transcript:

News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting (next week) o Web page o CMS week meetings o Upcoming meetings

Discussion: Cost Estimates and Tracking Money Matrix shown at RRB October 2011 o For projects in the Technical Proposal (Note: Some projects costed in M&O_B, not the Upgrade MM (HO SiPM, Castor)) UPO 2/2/12 2 o Total for MM = 64,447,000 CHF o Guidance for FA’s is cost sharing by PhD count, with early funding in cash for “Common Fund” at 10% of this prorated share o Each Project provided a profile by calendar year for the MM number

Discussion: Cost Estimates and Tracking RRB Reporting categories o Andrzej needs to set up a common set of <20 categories for reporting costs. He asked the project resource managers for comments based on the M&O_B categories. o Categories common to all projects (some will be blank for some projects) UPO 2/2/12 3 Comments/Questions o Missing items, eg detector sensors… o Drop the “standard electronics” words, but keep the same three categories: -Power supply systems -Electronics crates and infrastructure -Readout Electronics o Should “Areas” be “Assembly and Test Facilities”? o What is “Communications”? Drop “store items”? o “Manpower”? Not included in the MM? Ref.Details 1.01Mechanics 1.02Gas-system 1.03Cryo-system 1.04Cooling system 1.05FE electronics 1.06Standard electronics, PS (LV, HV) 1.07Standard electronics, Crates 1.08Standard electronics, RO Modules 1.09Controls, (DCS, DSS) 1.10Sub-Detector Spares 1.11Areas 1.12Communications 1.13Store Items 1.14 Manpower Agree on specific proposal next UPO

Discussion: Cost Estimates and Tracking Work Breakdown Structure and MM For internal planning: re-order the MM columns into the following categories UPO 2/2/12 4 LS1 projects o Each maintains a WBS breakdown with cost estimates and FA assignments o If necessary: one column for MM cost estimates and another for current estimates o A column for Cost-to-Complete (for current estimate) with comments on any funding issues TDR projects o Maintain a WBS breakdown with cost estimates as in MM and an updated estimate (new table) for the TDR o And a working model for FA assignments o Include columns for R&D costs (ahead of project approval) and production costs, again with FA assignments, and with Cost-to-Date for the R&D. Add comments on any funding issues o And a column per calendar year for the TDR estimate to make a new profile Common Projects o WBS with cost estimate per year o For MM and current update WBS64,447,000 1LS1 Projects13,980, HF-Phototubes1,990, Muon-CSC5,570, Muon-DT2,200, Muon-RPC4,220, HO-SiPM0 2TDR Projects27,767, Pixel17,350, HCAL5,817, L1-Trigger4,600,000 3System Projects8,240, DAQ6,700, Beam Instrumentation1,540,000 4Common Projects14,460, Magnet Power and Cryo1,330, Infrastructure6,315, Tead Beam Facilities610, Safety Systems964, Electronics Integratuion1,575, Engineering Integration3,666,000 5Phase II R&D

Discussion: Schedules and Milestones LS1 Projects o Martin Gastal has a set of milestones from each project (from last December) – will post these on a twiki o We will ask for updates in the next two weeks – mid-level Gannt chart for the project – set of mid-level milestones o These will be linked into master schedule for LS1 – maintain ~monthly o TC: 2-day workshop in April to consolidate integrated planning for LS1 TDR Projects o Request mid-level Gannt chart and milestones for the TDR version of the projects o We can make a template so they can easily be combined into a Phase 1 consolidated schedule – need a contact person per project o Will review these along with the technical scope for the TDRs, ahead of May CMS week UPO 2/2/12 5

CMS position for Chamonix meeting next week UPO 2/2/12 6 Draft Slide for Chamonix on the CMS position for Schedule discussions (for full program of work)

Upgrade web pages Upgrade home page : Proposal to have similar iCMS webpage for all groups Accessible from main menu bar and from Upgrade home page Twiki and link to upgrade home page to be updated by group conveners Use “HL-LHC” in place of “SLHC” Documents storage DocDB for reports… DropBox for common file CVS for TDRs Meetings Indico category to be linked in right side links of web page Can be created under upgrade (example cross-coordination) at An Upgrade calendar will be created See UPO 2/2/12 7

CMS week proposal under discussion UPO 2/2/12 8 MondayTuesday Wednesday ThursdayFriday ParalleldetectorTechPhys RUNParallel timedetectorCoordParallel coordTime CMSdetectorPlenaryPOGsPAGS PlenaryWrap-up plenarydetector CB CMSDPGsUpgrade Phys Parallel plenary& nonparallelPlenaryPOGsPAGsPAGSPlenary Time Upgrade Phys/Offl/ ParallelPPD/Comp/ CB CHATIB's,FBsTrigger etc.Plenary Upgrade Working Groups (maybe moved to Friday) CMS Plenary includes a summary Upgrade talk General Upgrade Meeting

Next meetings o Offline-PPD-Computing meeting on February 6 : – Review plans for code deliveries and data sample production in Especially dedicated to freeze code and release for simulation work for detector and physics performance in TDRs. o UPO: – Every two weeks from now on except during CMS week – Next meeting agenda will include status from Electronics and Online system coordination (following electronics week Jan 23), Report from cross coordination on software/release/MC plan – Proposal to have group news attached to UPO agenda (few text lines sent by mail to UPMs) (bulletin needed for the 17 th of October). Issues or progress presentations at request of UPMs and group responsible. o UC-PC workshop on performance simulations (March-April) o UC-TC workshop on LS1 schedule (probably 3 rd week of April) UPO 2/2/12 9