Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
0 - 0.
1 1  1 =.
1  1 =.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Making the System Operational
ZMQS ZMQS
Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.
RPC project Upgrade phase I Pierluigi Paolucci. RPC system in the forward region The forward region of the RPC project consists of: 4 disks equipped with.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
RPC tasks and manpower P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.
Year 6/7 mental test 5 second questions
RPC project chart Pigi Paolucci. RPC structure Project Manager1 0 level Deputies - Resource Manager2 0 level Istitution – Editorial – Conference2 0 level.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Limits (Algebraic) Calculus Fall, What can we do with limits?
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
1 Unit 1 Kinematics Chapter 1 Day
Fourth Quarter Oklahoma Data (October-December 2011)
One step equations Add Subtract Multiply Divide Addition X + 5 = -9 X = X = X = X = X = 2.
Beam Plan 2011 Stefano Colafranceschi on behalf of the CMS-MPGD team: Duccio Abbaneo, Stephane Bally, Hans Postema, Antonio Conde Garcia, Jean Paul Chatelain,
CERN, 14 May Italy D.Boscherini. Budget disponibile CapitolokE Consumo75 M.E.20 Personale25 Totale120.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
RPC M&OB status Pigi Paolucci. Summary 2010 Cash Contributions foreseen CHF 2010 Expenditures (2009 carry over) CHF Present Income Balance.
Link Board Upscope Frascati group Napoli group Warsaw group.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
MuonDPG/RPC M. Maggi INFN Bari. DQM tool for the DCS data Control Analysis Tool (CAT) by Cimmino, Lomidze, Paolucci, Polese To 1.Make custom DCS data.
A. Cimmino - P. Paolucci - G. Polese / DCS meeting DQM tool for the DCS data What the RPC community needs: 1.Make online/offline DCS data.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
Run Coordination Report 4th RPC General Meeting (CMS week) Luigi BENUSSI, Hassan SHAHZAD, Nicolas ZAGANIDIS.
RPC Endcap Maintenance and RE4 Upscope Anton Dimitrov on behalf of RPC TC CMS Week Dec 2012 CERN, Geneva.
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
1 st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
Muon Conference Pigi Paolucci. Front-End Control and Monitoring System for the Resistive Plate Chambers at the CMS Experiment Contributed to be given.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
CMS Muon detector from LHC to HL-LHC Pigi Paolucci INFN Napoli 1P. Paolucci (CMS group of Napoli) - Jan 2015.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
The GEM Proto-Collaboration (“GEMs for CMS”) Marcus Hohlmann, Florida Tech Interim Chair of Proto-Collaboration Board 2 nd CMS Workshop on High-eta Muon.
Progetto CMS RPC: Preventivi 2017
P. Paolucci G. Pugliese M.Tytgat
RPC Data Certification
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
DQM for the RPC subdetector
Presentation transcript:

Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C. Carillo DPG D. Piccolo K. Bunkowski C. Carillo Upgrade Resp. deputy Upgrade Resp. deputy Istitution Board chairman Resource manager P. Paolucci Steering committee Conference Committee chairman Conference Committee chairman Editorial board chairman Editorial board chairman 7/12/101RPC IB - Pigi Paolucci Tech. Coordination S. Buontempo A. Dimitrov Tech. Coordination S. Buontempo A. Dimitrov

Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C. Carillo DPG D. Piccolo K. Bunkowski C. Carillo Tech. Coordinator S. Buontempo A. Dimitrov Tech. Coordinator S. Buontempo A. Dimitrov Physic Valid Tool S. Costantini Physic Valid Tool S. Costantini CAF A. Cimmino CAF A. Cimmino P5 L. Benussi P5 L. Benussi Maint & repar A. Dimitrov Maint & repar A. Dimitrov Offline D. Piccolo Offline D. Piccolo Online K. Bunkowski Online K. Bunkowski Detector & trigger analysis C. Carillo Detector & trigger analysis C. Carillo Resource manager P. Paolucci Steering committee new 7/12/102RPC IB - Pigi Paolucci Upgrade Resp. deputy Upgrade Resp. deputy new

DPG D. Piccolo K. Bunkowski DPG D. Piccolo K. Bunkowski Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy SoftwareValidation/ Data Certification J. Gho SoftwareValidation/ Data Certification J. Gho Detector perfomance Calabria Detector perfomance Calabria Online K. Bunkowski Online K. Bunkowski Offline D. Piccolo Offline D. Piccolo Detector & trigger analysis C. Carillo Detector & trigger analysis C. Carillo Phys Valid Tool S. Costantini Phys Valid Tool S. Costantini Trigger perfomance Resp. Trigger perfomance Resp. Calibration Streams Maggi Calibration Streams Maggi WBM Berzano WBM Berzano Run Quality Korea Run Quality Korea Noise tools Costantini DQM Cimmino DQM Cimmino Skims Tupputi Skims Tupputi Upgrade Simulation Simulation Pavlov Local Reco C. Carrillo Local Reco C. Carrillo DataBase Trigger DB M Szlepper Trigger DB M Szlepper Configuration K. Bunkowski DCS Detector DB Manpower needed Not covered Covered 7/12/103RPC IB - Pigi Paolucci

Technical Coordination S. Buontempo A. Dimitrov Technical Coordination S. Buontempo A. Dimitrov Mainten. & repair. (RE,RE) Anton & Hassan Mainten. & repair. (RE,RE) Anton & Hassan 7/12/104 Upgrade responsable deputy Upgrade responsable deputy Bakelite CERN test site Gap production mechanics cooling Ghent site India site CERN site Chamber test Front-end electronic Link board electronic Link board electronic Equipment DB installation commissio ning cooling Gas Benussi Gas Benussi Trigger Warsaw Trigger Warsaw Test beam Nicolas Test beam Nicolas Documentation Dimitrov Documentation Dimitrov Equipment DB Electronics DCS Preliminar version

DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci5 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* Offline DB1.00.5? DCS0.70.3? Upgrade Sim0.5 ? Run quality0.50.3Korea Detector perf.22Calabria Trigger perf.22Warsaw DQM11A. Cimmino Noise S. Costantini

TC covered tasks 7/12/10RPC IB - Pigi Paolucci6 DPG 2011 (FTE)2012 (FTE) TCBuontempo RB1.0 Anton RE1.0 Hassan Gas0.5 Luigi Cooling0.3 Ian Trigger22Karol + ? Electronic0.4 Pigi + ? DB ? Test Beam ?

2011 Manpower/Expert Resident at CERN (>40%) 1.Korea Univ: Taejong (70%), Mee Hee Cho (50%), Hyung Chul Kim (30%) 2.SKK Univ: Hyunkwan Seo (50%), Min Suk Kim (70%), Junghwan Goh (30%) 3.Chandigar: 4.Mumbai BARC: 5.Pavia: 6.China: 7.Sofia Univ: Dimitrov 8.INRNE: Stoianov 9.Egypt: 10.Ghent: Costantini, Cimmino, Zaganidis, Phd ? 11.Napoli: Buontempo, Carrillo, Paolucci 12.LNF: Benussi, Piccolo 13.Uniandes: Ocampo, Gomez, Phd ? 14.Pakistan: Shahzad 15.Brussels: Van Doninck, Luc Van Lancker 16.Bari: Pugliese, Maggi, Colaleo, Calabria, Lusito, Tupputi 7/12/10RPC IB - Pigi Paolucci7

2011 Manpower/Expert (not resident) 1.Korea Univ: 2.SKK Univ: 3.Chandigar: 4.Mumbai BARC: 5.Pavia: Vitulo, Belli 6.China: 7.Sofia Univ: Litov, Pavlov, Petkov, Hadjiisk 8.INRNE: Stoianov, Genchev, Sultanov 9.Egypt: 10.Ghent: Tytgat 11.Napoli: Fabozzi 12.LNF: Bianco 13.Uniandes: 14.Pakistan: Horani, Saleh 15.Brussels: 16.Bari: Abbrescia, Iaselli 7/12/10RPC IB - Pigi Paolucci8